ML17107A260: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257 April 17, 2017 Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257 April 17, 2017 Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402  


==SUBJECT:==
==SUBJECT:==
SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION  


==Dear Mr. Shea:==
==Dear Mr. Shea:==


The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Sequoyah Nuclear Plant during the weeks of June 5 - 9 and June 19 - 23, 2017. The inspection team will be led by Shani Seaton, a Project Engineer from the NRC's Region II office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Problem Identification and Resolution, issued on February 26, 2015.
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Sequoyah Nuclear Plant during the weeks of June 5 - 9 and June 19 - 23, 2017. The inspection team will be led by Shani Seaton, a Project Engineer from the NRC's Region II office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Problem Identification and Resolution, issued on February 26, 2015.  
The biennial PI&R inspection and assessment of the licensee's Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.  


On April 13, 2017, Mrs. Seaton confirmed with Mr. Scott Bowman of your staff, arrangements for the two-week onsite inspection and a one day pre-inspection visit.
The biennial PI&R inspection and assessment of the licensee's Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than May 17, 2017. Contact Mrs. Seaton with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.  
 
semiannual trend PI&R reviews.
 
On April 13, 2017, Mrs. Seaton confirmed with Mr. Scott Bowman of your staff, arrangements for the two-week onsite inspection and a one day pre-inspection visit.  
 
The enclosure lists documents that will be needed prior to the inspection. Please have the  
 
referenced information available no later than May 17, 2017. Contact Mrs. Seaton with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
 
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mrs. Seaton will discuss with your staff the following inspection support administrative details:  availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and
 
other applicable information.
J. Shea 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mrs. Seaton at (404) 997-4461.  


If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mrs. Seaton will discuss with your staff the following inspection support administrative details:  availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.
J. Shea 2  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mrs. Seaton at (404) 997-4461.
Sincerely,  
Sincerely,  
       /RA/
 
Philip McKenna, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79  
       /RA/  
 
Philip McKenna, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79  


==Enclosure:==
==Enclosure:==


Information Request for Sequoyah    Nuclear Plant Problem Identification   and Resolution Inspection  
Information Request for Sequoyah    Nuclear Plant Problem Identification and Resolution Inspection  


cc Distribution via Listserv "PAPERWORK REDUCTION ACT STATEMENT  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. PUBLIC PROTECTION NOTIFICATION  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number." 
cc Distribution via Listserv  


ML 17107A260 OFFICE RII:DRP RII:DRP RII:DRP    NAME SSeaton RTaylor PMcKenna    DATE 4/17/2017 4/17/2017 4/17/2017 Enclosure INFORMATION REQUEST FOR SEQUOYAH NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JUNE 5 - 9 AND JUNE 19 - 23, 2017) Note:  Unless otherwise noted, the information requested below corresponds to documents generated since June 25, 2015. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.  
  "PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number." 
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:     a)  Corrective action process  b) Cause evaluation c)  Operating experience program d)  Employee concerns program e)  Self-assessment program f)  Maintenance rule program and implementing procedures  g)  Operability determination process  h)  Degraded/non-conforming condition process (e.g., RIS 2005-20) i)  System health process or equivalent equipment reliability improvement programs  j)  Preventive maintenance deferral and Condition Report (PER) extension process   If any of the procedures requested above were revised after June 25, 2015, please provide (or have available) copies of all revisions during the onsite inspection.
 
: 2. List of the top ten risk-significant systems, the top ten risk-significant components for each one of the top ten risk-significant systems, and the top ten risk-significant operator manual actions
ML 17107A260 OFFICE RII:DRP RII:DRP RII:DRP    NAME SSeaton RTaylor PMcKenna    DATE 4/17/2017 4/17/2017 4/17/2017 Enclosure INFORMATION REQUEST FOR SEQUOYAH NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JUNE 5 - 9 AND JUNE 19 - 23, 2017)
Note:  Unless otherwise noted, the information requested below corresponds to documents generated since June 25, 2015. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:
a)  Corrective action process  b) Cause evaluation c)  Operating experience program d)  Employee concerns program e)  Self-assessment program f)  Maintenance rule program and implementing procedures  g)  Operability determination process  h)  Degraded/non-conforming condition process (e.g., RIS 2005-20) i)  System health process or equivalent equipment reliability improvement programs  j)  Preventive maintenance deferral and Condition Report (PER) extension process If any of the procedures requested above were revised after June 25, 2015, please provide (or have available) copies of all revisions during the onsite inspection.  
: 2. List of the top ten risk-significant systems, the top ten risk-significant components for each one of the top ten risk-significant systems, and the top ten risk-significant operator manual actions  
: 3. List of all PERs initiated, including the following information for each PER:   
: 3. List of all PERs initiated, including the following information for each PER:   


a)  PER number b)  Brief, but complete problem description  c)  Priority or level d)  Affected system e)  Affected component f)  Responsible plant department g)  PER completion status   If possible, provide this list in a format compatible with spreadsheet software (example shown below). PER # Problem  PrioritySystemComponent Org Status PERXXX "A" RHR Pump failed flow criteria per SR 5.0.5.4 2 RHR 2-RHR-PMP-A ENG Open 2    4. List of outstanding corrective actions including the following information for each action:
a)  PER number b)  Brief, but complete problem description  c)  Priority or level d)  Affected system e)  Affected component f)  Responsible plant department g)  PER completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).
a)  Corrective action number b)  Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc)  c)  Brief, but complete corrective action description  d)  Associated PER number e)  Corrective action initiation date f)  Number of extensions g) Corrective action due date h) Completion status   If possible, provide this list in a format compatible with spreadsheet software (example shown below). Corrective Action # Type Description PER Initiation Date Extensions Due Date Status PERXXX CAPR Revise Procedure NGK-003-4585PERXXX 03/05/11 2 4/15/11Awaiting CARB Review   
PER # Problem  PrioritySystemComponent Org Status PERXXX "A" RHR Pump failed flow criteria  
: 5. List of control room deficiencies with a brief description and corresponding PER and/or work order (WO) number
 
: 6. List of operator workarounds and operator burdens with a brief description and corresponding PER number 7. List of all currently extended or overdue PERs, sorted by initiation date, with the following information:
per SR 5.0.5.4 2 RHR 2-RHR-PMP-A ENG Open 2    4. List of outstanding corrective actions including the following information for each action:  
a)  PER number b)  Priority or Significance c)  PER title and short description 8. List of all PERs that have been voided, cancelled, or deleted. Please provide the following information for each PER:
 
a)  PER number  b)  Brief, but complete problem description  c) Reason voided, cancelled, or deleted
a)  Corrective action number b)  Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc)  c)  Brief, but complete corrective action description  d)  Associated PER number e)  Corrective action initiation date f)  Number of extensions g) Corrective action due date h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).
: 9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since June 25, 2015. Please include the following information for each system in (a)(1):     a)  Date of classification in (a)(1) b)  Reason for being placed in (a)(1) c)  Planned actions and their status 3    10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems. Please include actions completed and current status.
Corrective Action # Type Description PER Initiation Date Extensions Due Date Status PERXXX CAPR Revise Procedure NGK-003-4585 PERXXX 03/05/11 2 4/15/11Awaiting CARB Review   
: 11. List of corrective maintenance work orders. Please include the following information for each work order:     a)  WO number  b)  Brief, but complete work description  c)  Affected system and components d)  Date of initiation e)  Date of completion (if completed)   If possible, provide this list in a format compatible with spreadsheet software (example shown below). Work Order # Description System Component Initiation Date Due Date StatusWO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump. SI 2A-SI-PMP, BKR-08-BB4 01/05/11 03/15/11 Closed 12. Corrective action closeout packages, including PERs with description of corrective actions, for all NRC findings and Licensee identified violations.
: 5. List of control room deficiencies with a brief description and corresponding PER and/or work order (WO) number  
: 13. Corrective action closeout packages, including PERs with description of corrective actions, for all licensee event reports (LERs) issued. 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., PER number) for the documents that evaluated the aforementioned OE information. 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program  
: 6. List of operator workarounds and operator burdens with a brief description and corresponding PER number  
: 16. Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc.)
: 7. List of all currently extended or overdue PERs, sorted by initiation date, with the following information:  
: 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends 18. Copy of the latest Corrective Action Program statistics (if they exist) such as the number of PERs initiated by department, human performance errors by department, and others as may be available 4    19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
 
: 20. List of PERs related to equipment aging issues in the top ten risk significant systems since June 25, 2015 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification). Please provide the following information for each PER:   a)  PER number b)  Priority c)  PER problem description
a)  PER number b)  Priority or Significance c)  PER title and short description  
: 8. List of all PERs that have been voided, cancelled, or deleted. Please provide the following information for each PER:  
 
a)  PER number  b)  Brief, but complete problem description  c) Reason voided, cancelled, or deleted  
: 9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since June 25, 2015. Please include the following information for each system in (a)(1):
a)  Date of classification in (a)(1) b)  Reason for being placed in (a)(1) c)  Planned actions and their status 3    10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems. Please include actions completed and current status.  
: 11. List of corrective maintenance work orders. Please include the following information for each work order:
a)  WO number  b)  Brief, but complete work description  c)  Affected system and components d)  Date of initiation e)  Date of completion (if completed)
If possible, provide this list in a format compatible with spreadsheet software (example shown below).
Work Order # Description System Component Initiation Date Due Date StatusWO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump. SI 2A-SI-PMP, BKR-08-BB4 01/05/11 03/15/11 Closed
: 12. Corrective action closeout packages, including PERs with description of corrective actions, for all NRC findings and Licensee identified violations.  
: 13. Corrective action closeout packages, including PERs with description of corrective actions, for all licensee event reports (LERs) issued.  
: 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., PER number) for the documents that evaluated the  
 
aforementioned OE information.  
: 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program  
: 16. Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc.)  
: 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends  
: 18. Copy of the latest Corrective Action Program statistics (if they exist) such as the number of PERs initiated by department, human per formance errors by department, and others as may be available 4    19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while  
 
team is onsite.  
: 20. List of PERs related to equipment aging issues in the top ten risk significant systems since June 25, 2015 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification). Please provide the following information for each PER:
a)  PER number b)  Priority c)  PER problem description  
: 21. If performed, please provide any recent self-assessment of the site safety culture.  
: 21. If performed, please provide any recent self-assessment of the site safety culture.  
: 22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
: 22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods  
: 23. List of all root cause evaluations with a brief description  
: 23. List of all root cause evaluations with a brief description  
: 24. Copy of Probabilistic Risk Assessment importance measures report, if available 25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems}}
: 24. Copy of Probabilistic Risk Assessment importance measures report, if available
: 25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems}}

Revision as of 21:32, 29 June 2018

Sequoyah - Notification of Inspection and Request for Information for NRC PI&R
ML17107A260
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/17/2017
From: McKenna P J
Reactor Projects Branch 7
To: Shea J W
Tennessee Valley Authority
References
Download: ML17107A260 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 17, 2017 Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Shea:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Sequoyah Nuclear Plant during the weeks of June 5 - 9 and June 19 - 23, 2017. The inspection team will be led by Shani Seaton, a Project Engineer from the NRC's Region II office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Problem Identification and Resolution, issued on February 26, 2015.

The biennial PI&R inspection and assessment of the licensee's Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and

semiannual trend PI&R reviews.

On April 13, 2017, Mrs. Seaton confirmed with Mr. Scott Bowman of your staff, arrangements for the two-week onsite inspection and a one day pre-inspection visit.

The enclosure lists documents that will be needed prior to the inspection. Please have the

referenced information available no later than May 17, 2017. Contact Mrs. Seaton with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mrs. Seaton will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and

other applicable information.

J. Shea 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mrs. Seaton at (404) 997-4461.

Sincerely,

/RA/

Philip McKenna, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosure:

Information Request for Sequoyah Nuclear Plant Problem Identification and Resolution Inspection

cc Distribution via Listserv

"PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number."

ML 17107A260 OFFICE RII:DRP RII:DRP RII:DRP NAME SSeaton RTaylor PMcKenna DATE 4/17/2017 4/17/2017 4/17/2017 Enclosure INFORMATION REQUEST FOR SEQUOYAH NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JUNE 5 - 9 AND JUNE 19 - 23, 2017)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since June 25, 2015. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability improvement programs j) Preventive maintenance deferral and Condition Report (PER) extension process If any of the procedures requested above were revised after June 25, 2015, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of the top ten risk-significant systems, the top ten risk-significant components for each one of the top ten risk-significant systems, and the top ten risk-significant operator manual actions
3. List of all PERs initiated, including the following information for each PER:

a) PER number b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) PER completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).

PER # Problem PrioritySystemComponent Org Status PERXXX "A" RHR Pump failed flow criteria

per SR 5.0.5.4 2 RHR 2-RHR-PMP-A ENG Open 2 4. List of outstanding corrective actions including the following information for each action:

a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc) c) Brief, but complete corrective action description d) Associated PER number e) Corrective action initiation date f) Number of extensions g) Corrective action due date h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).

Corrective Action # Type Description PER Initiation Date Extensions Due Date Status PERXXX CAPR Revise Procedure NGK-003-4585 PERXXX 03/05/11 2 4/15/11Awaiting CARB Review

5. List of control room deficiencies with a brief description and corresponding PER and/or work order (WO) number
6. List of operator workarounds and operator burdens with a brief description and corresponding PER number
7. List of all currently extended or overdue PERs, sorted by initiation date, with the following information:

a) PER number b) Priority or Significance c) PER title and short description

8. List of all PERs that have been voided, cancelled, or deleted. Please provide the following information for each PER:

a) PER number b) Brief, but complete problem description c) Reason voided, cancelled, or deleted

9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since June 25, 2015. Please include the following information for each system in (a)(1):

a) Date of classification in (a)(1) b) Reason for being placed in (a)(1) c) Planned actions and their status 3 10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems. Please include actions completed and current status.

11. List of corrective maintenance work orders. Please include the following information for each work order:

a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (example shown below).

Work Order # Description System Component Initiation Date Due Date StatusWO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump. SI 2A-SI-PMP, BKR-08-BB4 01/05/11 03/15/11 Closed

12. Corrective action closeout packages, including PERs with description of corrective actions, for all NRC findings and Licensee identified violations.
13. Corrective action closeout packages, including PERs with description of corrective actions, for all licensee event reports (LERs) issued.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., PER number) for the documents that evaluated the

aforementioned OE information.

15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program
16. Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc.)
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends
18. Copy of the latest Corrective Action Program statistics (if they exist) such as the number of PERs initiated by department, human per formance errors by department, and others as may be available 4 19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while

team is onsite.

20. List of PERs related to equipment aging issues in the top ten risk significant systems since June 25, 2015 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification). Please provide the following information for each PER:

a) PER number b) Priority c) PER problem description

21. If performed, please provide any recent self-assessment of the site safety culture.
22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
23. List of all root cause evaluations with a brief description
24. Copy of Probabilistic Risk Assessment importance measures report, if available
25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems