ML092440651

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan 03/01/2009 - 12/31/2010
ML092440651
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
References
Download: ML092440651 (2)


Text

Page 1 of 2 Sequoyah 09/01/2009 07:49:22 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 10/19/2009 10/23/2009 IP 7111402 Alert and Notification System Testing 1, 2 10/19/2009 10/23/2009 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 10/19/2009 10/23/2009 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/19/2009 10/23/2009 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 10/19/2009 10/23/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 11/02/2009 11/06/2009 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - TI-172 RCS DM BUTT WELDS 1 2 11/02/2009 11/06/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGISI - UNIT 2 STEAM GENERATOR ISI 1 2 11/09/2009 11/13/2009 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP GROUND WATER INITIATIVE 1 1, 2 12/07/2009 12/11/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative PI&R - PI&R 1 1, 2 01/01/2010 03/31/2010 IP 71152 Identification and Resolution of Problems OL EXAM - INITIAL EXAM PREP 3 1 01/11/2010 01/15/2010 V23287 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 1 02/15/2010 02/19/2010 V23287 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 02/22/2010 02/26/2010 V23287 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 6 1, 2 03/01/2010 03/05/2010 IP 7111121 Component Design Bases Inspection 1, 2 03/15/2010 03/19/2010 IP 7111121 Component Design Bases Inspection 1, 2 03/29/2010 04/02/2010 IP 7111121 Component Design Bases Inspection 1, 2 04/12/2010 04/16/2010 IP 7111121 Component Design Bases Inspection PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 1, 2 07/12/2010 07/16/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 07/12/2010 07/16/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 07/12/2010 07/16/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 07/12/2010 07/16/2010 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 4 1 08/02/2010 08/06/2010 V23308 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Sequoyah 09/01/2009 07:49:22 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM WEEK 1 3 1 08/23/2010 08/27/2010 V23308 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 2 3 1 08/30/2010 09/03/2010 V23308 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES PSB1-RP - RP ACCESS CONTROLS 1 1, 2 09/27/2010 10/01/2010 IP 7112101 Access Control to Radiologically Significant Areas EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 10/04/2010 10/08/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT SYSTEM DM BUTT WELDS 1 1 10/04/2010 10/08/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGISI - UNIT 1 SG INSERVICE INSPECTION 1 1 10/11/2010 10/15/2010 IP 7111108P Inservice Inspection Activities - PWR OL RQ - REQUAL INSPECTION 2 1, 2 11/15/2010 11/19/2010 IP 7111111B Licensed Operator Requalification Program PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 11/15/2010 11/19/2010 IP 7111401 Exercise Evaluation 1, 2 11/15/2010 11/19/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 11/15/2010 11/19/2010 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure