Inspection/Activity Plan 03/01/2009 - 12/31/2010
ML092440651
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
References
Download: ML092440651 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 07:49:22 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2 IP Alert and Notification System Testing 7111402 10/19/2009 10/23/2009 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 10/19/2009 10/23/2009 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/19/2009 10/23/2009 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 10/19/2009 10/23/2009 1, 2 IP Performance Indicator Verification 71151 10/19/2009 10/23/2009 EB3ISI

- UNIT 2 INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 11/02/2009 11/06/2009 EB3TI172

- TI-172 RCS DM BUTT WELDS 1

2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 11/02/2009 11/06/2009 EB3SGISI

- UNIT 2 STEAM GENERATOR ISI 1

2 IP Inservice Inspection Activities - PWR 7111108P 11/09/2009 11/13/2009 PSB1-RP

- RP GROUND WATER INITIATIVE 1

1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 12/07/2009 12/11/2009 PI&R

- PI&R 1

1, 2 IP Identification and Resolution of Problems 71152 01/01/2010 03/31/2010 OL EXAM

- INITIAL EXAM PREP 3

1 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES V23287 01/11/2010 01/15/2010 OL EXAM

- INITIAL EXAM - WEEK 1 3

1 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES V23287 02/15/2010 02/19/2010 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES V23287 02/22/2010 02/26/2010 CDBI

- COMPONENT DESIGN BASES INSPECTION 6

1, 2 IP Component Design Bases Inspection 7111121 03/01/2010 03/05/2010 1, 2 IP Component Design Bases Inspection 7111121 03/15/2010 03/19/2010 1, 2 IP Component Design Bases Inspection 7111121 03/29/2010 04/02/2010 1, 2 IP Component Design Bases Inspection 7111121 04/12/2010 04/16/2010 PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 07/12/2010 07/16/2010 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 07/12/2010 07/16/2010 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 07/12/2010 07/16/2010 1, 2 IP Performance Indicator Verification 71151 07/12/2010 07/16/2010 OL EXAM

- INITIAL EXAM PREP 4

1 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES V23308 08/02/2010 08/06/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 07:49:22 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah OL EXAM

- INITIAL EXAM WEEK 1 3

1 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES V23308 08/23/2010 08/27/2010 OL EXAM

- INITIAL EXAM WEEK 2 3

1 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES V23308 08/30/2010 09/03/2010 PSB1-RP

- RP ACCESS CONTROLS 1

1, 2 IP Access Control to Radiologically Significant Areas 7112101 09/27/2010 10/01/2010 EB3ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/04/2010 10/08/2010 EB3TI172

- EB3 RX COOLANT SYSTEM DM BUTT WELDS 1

1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/04/2010 10/08/2010 EB3SGISI

- UNIT 1 SG INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/11/2010 10/15/2010 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 11/15/2010 11/19/2010 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 11/15/2010 11/19/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/15/2010 11/19/2010 1, 2 IP Performance Indicator Verification 71151 11/15/2010 11/19/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure