ML12065A329

From kanterella
Jump to navigation Jump to search
RPT 22, Inspection/Activity Plan
ML12065A329
Person / Time
Site: Sequoyah  
(DPR-077, DPR-079)
Issue date: 03/05/2012
From:
Division Reactor Projects II
To:
Tennessee Valley Authority
References
Download: ML12065A329 (2)


Text

Page 1 of 2 03/05/2012 08:40:42 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah Inspection / Activity Plan 03/01/2012 - 06/30/2013 95001

- SEQUOYAH 95001 INSPECTION 2

1 IP Followup of Events and Notices of Enforcement Discretion 71153 03/05/2012 03/11/2012 1

IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 03/05/2012 03/11/2012 EB3 ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 03/05/2012 03/09/2012 EB3SGISI

- UNIT 1 SG INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 03/12/2012 03/16/2012 EB3 HS

- TRIENNIAL HEAT SINK INSPECTION 1

1, 2 IP Heat Sink Performance 7111107T 07/16/2012 07/20/2012 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 09/10/2012 09/14/2012 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 4

1, 2 IP Exercise Evaluation 7111401 10/01/2012 10/05/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/01/2012 10/05/2012 1, 2 IP Performance Indicator Verification 71151 10/01/2012 10/05/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 4

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/22/2012 10/26/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/22/2012 10/26/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/22/2012 10/26/2012 1, 2 IP Occupational Dose Assessment 71124.04 10/22/2012 10/26/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 10/22/2012 10/26/2012 1, 2 IP Performance Indicator Verification 71151 10/22/2012 10/26/2012 EB3 ISI

- UNIT 2 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/29/2012 11/02/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK2 4

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/05/2012 11/09/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/05/2012 11/09/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/05/2012 11/09/2012 1, 2 IP Occupational Dose Assessment 71124.04 11/05/2012 11/09/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/05/2012 11/09/2012 1, 2 IP Performance Indicator Verification 71151 11/05/2012 11/09/2012 EB3 SGR

- UNIT 2 SG REPLACEMENT 1

1, 2 IP Steam Generator Replacement Inspection 50001 11/26/2012 11/30/2012 1, 2 IP Steam Generator Replacement Inspection 50001 12/10/2012 12/14/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 03/05/2012 08:40:42 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah Inspection / Activity Plan 03/01/2012 - 06/30/2013 EB3 SGR

- UNIT 2 SG REPLACEMENT 1

1, 2 IP Steam Generator Replacement Inspection 50001 12/24/2012 12/28/2012 OL EXAM

- INITIAL EXAM WEEK 1 3

1 SEQUOYAH/DECEMBER 2012 EXAM AT POWER FACILITIES V23340 12/03/2012 12/07/2012 OL EXAM

- INITIAL EXAM WEEK 2 3

1 SEQUOYAH/DECEMBER 2012 EXAM AT POWER FACILITIES V23340 12/10/2012 12/14/2012 TI-182

- TI-182 BURIED PIPING/TANK - PHASE 1 1

1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 02/11/2013 02/15/2013 OL EXAM

- INITIAL EXAM PREP 3

1 SEQUOYAH/MAY 2013 INITIAL EXAM AT POWER FACILITIES V23408 04/22/2013 04/26/2013 OL EXAM

- INITIAL EXAM - WEEK 1 3

1 SEQUOYAH/MAY 2013 INITIAL EXAM AT POWER FACILITIES V23408 05/13/2013 05/17/2013 PSB1-RP

- RP PUBLIC RAD SAFETY BASELINE 3

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/13/2013 05/17/2013 1, 2 IP Radiological Environmental Monitoring Program 71124.07 05/13/2013 05/17/2013 1, 2 IP Performance Indicator Verification 71151 05/13/2013 05/17/2013 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 SEQUOYAH/MAY 2013 INITIAL EXAM AT POWER FACILITIES V23408 05/20/2013 05/24/2013 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1, 2 IP Problem Identification and Resolution 71152B 06/10/2013 06/14/2013 1, 2 IP Problem Identification and Resolution 71152B 06/24/2013 06/28/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.