UNITED STATES NUCLEAR REGULATORY COMMISSION ust 24, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (REPORT 05000327, 05000328/2017005)

Dear Mr. Shea:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for the Sequoyah Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (404) 997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 05000327, 05000328 License Nos.: DPR-77, DPR-79 Enclosure:

Sequoyah Inspection/Activity Plan (09/01/2017- 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (REPORT 05000327, 05000328/2017005) August 24, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML17236A247 OFFICE RII:DRP NAME ABlamey DATE 8/24/2017 OFFICIAL AGENCY RECORD

Page 1 of 2 Sequoyah 08/17/2017 10:17:02 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 3 1, 2 09/11/2017 09/15/2017 IP 7111402 Alert and Notification System Testing 1, 2 09/11/2017 09/15/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 09/11/2017 09/15/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 09/11/2017 09/15/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 09/11/2017 09/15/2017 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 10/30/2017 11/03/2017 V23503 SEQUOYAH DECEMBER 2017 INITIAL EXAM AT POWER FACILITIES EQI - DESIGN BASES ASSURANCE INSPECTION (PROGR 4 1, 2 10/30/2017 11/03/2017 IP 7111121N Design Bases Assurance Inspection (Programs)

1, 2 11/13/2017 11/17/2017 IP 7111121N Design Bases Assurance Inspection (Programs)

1, 2 12/04/2017 12/08/2017 IP 7111121N Design Bases Assurance Inspection (Programs)

OL EXAM - INITIAL LICENSE EXAM 3 1 12/04/2017 12/15/2017 V23503 SEQUOYAH DECEMBER 2017 INITIAL EXAM AT POWER FACILITIES ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 04/16/2018 04/20/2018 IP 7111108P Inservice Inspection Activities - PWR LR - UNIT 1 POST-APPROVAL LR PHASE 1 2 1 04/16/2018 04/20/2018 IP 71003 Post-Approval Site Inspection for License Renewal MODS - PLANT MODIFICATIONS INSPECTION 3 1, 2 06/04/2018 06/08/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 07/16/2018 07/20/2018 IP 7111107T Heat Sink Performance EP - EP EXERCISE 8 1, 2 09/17/2018 09/21/2018 IP 7111401 Exercise Evaluation 1, 2 09/17/2018 09/21/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 09/17/2018 09/21/2018 IP 71151-EP01 Drill/Exercise Performance 1, 2 09/17/2018 09/21/2018 IP 71151-EP02 ERO Readiness 1, 2 09/17/2018 09/21/2018 IP 71151-EP03 Alert & Notification System Reliability OL RQ - REQUAL INSPECTION 2 1, 2 10/08/2018 10/12/2018 IP 7111111B Licensed Operator Requalification Program ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 10/29/2018 11/02/2018 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Sequoyah 08/17/2017 10:17:02 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site LR - UNIT 2 POST-APPROVAL LR PHASE 1 2 2 10/29/2018 11/02/2018 IP 71003 Post-Approval Site Inspection for License Renewal RP - RP OCCUPATIONAL - WEEK 1 3 1, 2 10/29/2018 11/02/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/29/2018 11/02/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/29/2018 11/02/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/29/2018 11/02/2018 IP 71124.04 Occupational Dose Assessment 1, 2 10/29/2018 11/02/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/29/2018 11/02/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/29/2018 11/02/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 10/29/2018 11/02/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 2 2 1, 2 11/26/2018 11/30/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/26/2018 11/30/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/26/2018 11/30/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/26/2018 11/30/2018 IP 71124.04 Occupational Dose Assessment 1, 2 11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/26/2018 11/30/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 11/26/2018 11/30/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAMS 6 1, 2 01/28/2019 02/01/2019 IP 7111121M Design Bases Assurance Inspection (Teams)

1, 2 02/25/2019 03/01/2019 IP 7111121M Design Bases Assurance Inspection (Teams)

1, 2 03/11/2019 03/15/2019 IP 7111121M Design Bases Assurance Inspection (Teams)

PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 06/03/2019 06/07/2019 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.