August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2, NRC INSPECTION REPORT 05000327/2016005, 05000328/2016005

Dear Mr. Shea:

On August 10, 2016, the NRC completed its mid-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Sequoyah Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix due to one White performance indicator for unplanned scrams which crossed the green-to-white threshold in the third quarter of 2015. All inspection findings had very low (i.e., green)

safety significance, and all other performance indicators for Unit 1 were within the nominal, expected range (i.e., green) during this assessment period. The NRC conducted a supplemental inspection using inspection procedure 95001 for Unit 1 after the end of the assessment period. The results of this inspection and any follow-up assessment will be communicated in separate correspondence.

The NRC determined that overall, Sequoyah Plant Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at the Sequoyah Nuclear Plant Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs ROP Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

Although plant performance was within the Regulatory Response Column for Unit 1 and Licensee Response Column for Unit 2, the NRC has not yet finalized the significance of AV 05000327, 328/2016002-01: Isolation of Fire Suppression System to a Significant Portion of the Plant Site.

The final safety significance determination may affect the NRCs assessment of plant performance and the enclosed inspection plan. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Alan Blamey at (404) 997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Joel Munday Division Director Division of Reactor Projects

Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosure: Sequoyah Inspection/Activity Plan

(09/01/2016 - 06/30/2018)

cc: Distribution via ListSer

_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP

SIGNATURE CRK1 AJB3 JTM

NAME C. Kontz A. Blamey J. Munday

DATE 8/5/2016 8/31/2016 8/31/2016 9/ /2016 9/ /2016 9/ /2016 9/ /2016 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Page 1 of 2 08/31/2016 07:00:00 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah Inspection / Activity Plan 09/01/2016 - 06/30/2018 EP

- EP EXERCISE INSPECTION

1, 2 IP Exercise Evaluation 7111401 09/12/2016 09/16/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 09/12/2016 09/16/2016 1, 2 IP Exercise Evaluation - Scenario Review 7111408 09/12/2016 09/16/2016 1, 2 IP Performance Indicator Verification 71151 09/12/2016 09/16/2016 OL RQ

- REQUAL INSP

1, 2 IP Licensed Operator Requalification Program 7111111B 10/03/2016 10/07/2016 RP

- RP OCCUPATIONAL INSPECTION WEEK 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/06/2016 11/10/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/06/2016 11/10/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/06/2016 11/10/2016 1, 2 IP Occupational Dose Assessment 71124.04 11/06/2016 11/10/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/06/2016 11/10/2016 1, 2 IP Performance Indicator Verification 71151 11/06/2016 11/10/2016 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 11/07/2016 11/11/2016 RP

- RP OCCUPATIONAL INSPECTION WEEK 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/14/2016 11/18/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/14/2016 11/18/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/14/2016 11/18/2016 1, 2 IP Occupational Dose Assessment 71124.04 11/14/2016 11/18/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/14/2016 11/18/2016 1, 2 IP Performance Indicator Verification 71151 11/14/2016 11/18/2016 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 11/14/2016 11/18/2016 TI-191

- MITIGATING STRATEGIES

1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 03/06/2017 03/10/2017 TFPI

- TRIENNIAL FIRE PROTECTION INSPECTION

1, 2 IP Fire Protection [Triennial]

7111105T 03/20/2017 03/24/2017 1, 2 IP Fire Protection [Triennial]

7111105T 04/03/2017 04/07/2017 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 05/01/2017 05/05/2017 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/31/2016 07:00:00 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah Inspection / Activity Plan 09/01/2016 - 06/30/2018 RP

- RAD HAZARDS

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/01/2017 05/05/2017 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 06/05/2017 06/09/2017 1, 2 IP Problem Identification and Resolution 71152B 06/19/2017 06/23/2017 RP

- RP PUBLIC RADIATION SAFETY

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/10/2017 07/14/2017 1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/10/2017 07/14/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/10/2017 07/14/2017 1, 2 IP Performance Indicator Verification 71151 07/10/2017 07/14/2017 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 09/11/2017 09/15/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/11/2017 09/15/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 09/11/2017 09/15/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/11/2017 09/15/2017 1, 2 IP Performance Indicator Verification 71151 09/11/2017 09/15/2017 OL EXAM

- INITIAL LICENSE EXAM PREP

1 SEQUOYAH DECEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23503 10/30/2017 11/03/2017 OL EXAM

- INITIAL LICENSE EXAM

1 SEQUOYAH DECEMBER 2017 INITIAL EXAM AT POWER FACILITIES V23503 12/04/2017 12/15/2017 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 05/14/2018 05/18/2018 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 05/21/2018 05/25/2018 MODS

- PLANT MODIFICATIONS INSPECTION

1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 06/11/2018 06/15/2018 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 06/25/2018 06/29/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.