UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 4, 2014 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (REPORT 05000327/2013001 AND 05000328/2013001)
Dear Mr. Shea:
On February 19, 2014, the NRC completed its end-of-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2013, through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that the performance at Sequoyah Nuclear Plant Units 1 and 2 during the most recent quarter was within the Degraded Cornerstone Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one or more greater than Green Security Cornerstone inputs and two White findings in the Mitigating Systems Cornerstone in the first Quarter of 2013.
On September 27, 2013, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The NRC determined that the inspection objectives of inspection procedure (IP) 95001 were satisfied and the greater than Green security finding was closed.
On December 13, 2013, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area. Based on the results of this inspection, the NRC determined that your staff adequately addressed the causes for both White findings.
Therefore, both findings are considered closed and Sequoyah Units 1 and 2 transitioned to the Licensee Response Column of the NRCs ROP Action Matrix on January 1, 2014.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
J. Shea 2
The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, and IP 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Alternative Dispute Resolution.
Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Jonathan Bartley at 404-997-4607 with any questions you have regarding this letter.
Sincerely,
/RA/
Victor M. McCree Regional Administrator Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79
Enclosure:
Sequoyah Inspection/Activity Plan (03/01/2014 - 06/30/2015) cc distribution via Listserv
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:ORA SIGNATURE JDH /RA/
JHB /RA/
RPC /RA/
LDW /RA/
NAME JHamman JBartley RCroteau LWert DATE 02/24/2014 02/24/2014 02/24/2014 02/27/2014 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
J. Shea 3
Letter to Joseph W. Shea from Victor M. McCree dated March 4, 2014
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (REPORT 05000327/2013001 AND 05000328/2013001)
DISTRIBUTION:
C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource Institute of Nuclear Power Operations (INPO)
ROP Assessment
Page 1 of 2 03/04/2014 08:49:37 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah Inspection / Activity Plan 03/01/2014 - 06/30/2015 TI-182
- TI-182 BURIED PIPING/TANK - PHASE 2 1
1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 04/02/2014 04/04/2014 RP
- RP OCCUPATIONAL BASELINE 2
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/12/2014 05/16/2014 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/12/2014 05/16/2014 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/12/2014 05/16/2014 1, 2 IP Occupational Dose Assessment 71124.04 05/12/2014 05/16/2014 1, 2 IP Radiation Monitoring Instrumentation 71124.05 05/12/2014 05/16/2014 1, 2 IP Performance Indicator Verification 71151 05/12/2014 05/16/2014 ISI
- UNIT 2 IN-SERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 05/19/2014 05/23/2014 SGISI
- UNIT 2 SG IN-SERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 05/26/2014 05/30/2014 RP
- RP OCCUPATIONAL BASELINE WEEK2 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/02/2014 06/06/2014 1, 2 IP Occupational ALARA Planning and Controls 71124.02 06/02/2014 06/06/2014 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/02/2014 06/06/2014 1, 2 IP Occupational Dose Assessment 71124.04 06/02/2014 06/06/2014 1, 2 IP Radiation Monitoring Instrumentation 71124.05 06/02/2014 06/06/2014 1, 2 IP Performance Indicator Verification 71151 06/02/2014 06/06/2014 EP
- EP EXERCISE 3
1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/17/2014 11/21/2014 1, 2 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 11/17/2014 11/21/2014 1, 2 IP Performance Indicator Verification 71151 11/17/2014 11/21/2014 OL RQ
- REQUAL INSP 2
1, 2 IP Licensed Operator Requalification Program 7111111B 12/01/2014 12/05/2014 RP
- RP PUBLIC RAD SAFETY BASELINE 2
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/26/2015 01/30/2015 1, 2 IP Radiological Environmental Monitoring Program 71124.07 01/26/2015 01/30/2015 1, 2 IP Performance Indicator Verification 71151 01/26/2015 01/30/2015 RP
- RAD HAZARDS ANALYSIS AND TRANSPORTATION 2
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/02/2015 03/06/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 03/02/2015 03/06/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 03/04/2014 08:49:37 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Sequoyah Inspection / Activity Plan 03/01/2014 - 06/30/2015 RP
- RAD HAZARDS ANALYSIS AND TRANSPORTATION 2
1, 2 IP Performance Indicator Verification 71151 03/02/2015 03/06/2015 ISI
- UNIT 1 IN-SERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 04/20/2015 04/24/2015 SGISI
- UNIT 1 SG IN-SERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 4
1, 2 IP Problem Identification and Resolution 71152B 06/08/2015 06/12/2015 1, 2 IP Problem Identification and Resolution 71152B 06/22/2015 06/26/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure