ML100620987

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan 03/01/2010 - 06/30/2011
ML100620987
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/03/2010
From:
Reactor Projects Region 2 Branch 6
To:
Shared Package
ML100620982 List:
References
Download: ML100620987 (2)


Text

Page 1 of 2 Sequoyah 03/03/2010 07:10:13 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM - WEEK 2 4 1 02/22/2010 03/05/2010 V23287 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 8 1, 2 03/01/2010 03/05/2010 IP 7111121 Component Design Bases Inspection 1, 2 03/15/2010 03/19/2010 IP 7111121 Component Design Bases Inspection 1, 2 03/29/2010 04/02/2010 IP 7111121 Component Design Bases Inspection 1, 2 04/12/2010 04/16/2010 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL EXAM PREP 5 1 08/02/2010 08/06/2010 V23308 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 1 5 1 09/06/2010 09/10/2010 V23308 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 2 5 1 09/20/2010 10/01/2010 V23308 SEQUOYAH/AUGUST 2010 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 1 1 1, 2 09/27/2010 10/01/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/27/2010 10/01/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/27/2010 10/01/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/27/2010 10/01/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 10/04/2010 10/08/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RX COOLANT SYSTEM DM BUTT WELDS 1 1 10/04/2010 10/08/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 10/18/2010 10/22/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/18/2010 10/22/2010 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/18/2010 10/22/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/18/2010 10/22/2010 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL- TRANSPORATION 1 1, 2 11/15/2010 11/19/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 11/15/2010 11/19/2010 IP 7111401 Exercise Evaluation 1, 2 11/15/2010 11/19/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 11/15/2010 11/19/2010 IP 71151 Performance Indicator Verification TI-177 - GAS INTRUSION 2 1, 2 11/29/2010 12/03/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Sequoyah 03/03/2010 07:10:13 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL RQ - REQUAL INSPECTION 2 1, 2 12/06/2010 12/10/2010 IP 7111111B Licensed Operator Requalification Program TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 6 1, 2 01/24/2011 01/28/2011 IP 7111105T Fire Protection [Triennial]

1, 2 02/07/2011 02/11/2011 IP 7111105T Fire Protection [Triennial]

OL EXAM - INITIAL EXAM - WEEK 2 2 1 01/23/2011 01/30/2011 V23354 SEQUOYAH/AUGUST 2011 EXAM AT POWER FACILITIES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 03/07/2011 03/11/2011 IP 71152B Identification and Resolution of Problems 1, 2 03/21/2011 03/25/2011 IP 71152B Identification and Resolution of Problems EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 05/02/2011 05/06/2011 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 05/09/2011 05/13/2011 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure