ML23320A247: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:November 17, 2023 LICENSEE:      Constellation Energy Generation, LLC FACILITIES: Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant
 
==SUBJECT:==
 
==SUMMARY==
OF NOVEMBER 14, 2023, PUBLIC PRE-APPLICATION MEETING WITH CONSTELLATION ENERGY GENERATION, LLC ON ADOPTION OF TSTF-591 (EPID L-2023-LRM-0098)
On November 14, 2023, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Constellation Energy Generation, LLC (CEG, the licensee) via teleconference. The purpose of this meeting was to discuss CEGs plans to submit license amendment requests (LARs) to adopt Technical Specifications Task Force (TSTF)
Traveler TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program for Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant (collectively, the CEG facilities). The meeting notice and agenda dated November 1, 2023, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML23306A104, and CEGs meeting handout is available at ML23317A071. A list of attendees is enclosed.
The licensee presented information regarding the schedule and contents of the upcoming LARs to adopt TSTF-591 for the CEG facilities. The licensee indicated that it seeks to:
: 1. Align to Regulatory Guide 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities, Revision 3, dated December 2020 (ML20238B871), within the technical specifications (TS) section 5.5, Programs and Manual, specific to the RICT Program for the CEG facilities;
: 2. Establish at each facilities a RICT Upgrade Reporting Program; and
: 3. Align those facilities with current reference to RG 1.200, Revision 2 (ML090410014), in the respective operating license condition related to the adoption of Title 10 of the Code of Federal Regulations (10 CFR), section 50.69., Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors, with the changes related to adoption of TSTF-591.
 
CEG indicated that it plans to submit the LARs requests no later than January 2024. The NRC staff recommended that the application address the following regarding Probabilistic Risk Assessment (PRA) models and history the CEG facilities:
: 1. PRA modeled hazards remain the same for those approved for adoption of 10 CFR 50.69 and TSTF-505, Provide Risk-Informed Extended Completion Times -
RITSTF [Risk-Informed TSTF] Initiative 4b, (ML18183A493) (i.e., no interjection of new PRA models to be review for PRA acceptability for use in the risk-informed programs).
: 2. Any changes to the PRA models that incorporate a Newly Developed Method that has not been approved for use by the NRC or upgrade that has not been peer reviewed.
The NRC staff appreciated that the licensee held the meeting early in the development process so that any staff comments could be considered in the application.
No members of the public had questions or comments during the meeting. No regulatory decisions were made at this meeting. Please direct any inquiries to me at 301-415-2855, or Scott.Wall@nrc.gov.
Sincerely,
                                            /RA/
Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-277, 50-278, 50-254, 50-265, and 50-244
 
==Enclosure:==
 
List of Attendees cc: Listserv
 
LIST OF ATTENDEES NOVEMBER 14, 2023, PUBLIC MEETING WITH CONSTELLATION ENERGY GENERATION, LLC PLANNED LICENSE AMENDMENT REQUEST RELATED TO TSTF-591 Name                                      Organization Scott Wall                                Nuclear Regulatory Commission (NRC)
Hipo Gonzalez                            NRC Bob Pascarelli                            NRC Jen Whitman                              NRC Andrea Russell                            NRC Adrienne Brown                            NRC Michelle Honcharik                        NRC Ed Miller                                NRC Justin Poole                              NRC Michael Marshall                          NRC Sujata Goetz                              NRC V Sreenivas                              NRC Audrey Klett                              NRC Richard Guzman                            NRC Elena Herrera Torres                      NRC Stephen Flickinger                        Constellation Energy Generation, LLC (CEG)
Roy Linthicum                            CEG David Passehl                            CEG Philip Tarpinian                          CEG Jeff Stone                                CEG Victoria Anderson                        Nuclear Energy Institute (NEI)
Enclosure
 
ML23320A247 OFFICE NRR/DORL/LPL3/PM              NRR/DORL/LPL3/LA        NRR/DORL/LPL3/BC NAME      SWall                    SRohrer                  JWhited DATE      11/15/2023                11/16/2023              11/17/2023 OFFICE    NRR/DORL/LPL3/PM NAME      SWall DATE      11/17/2023}}

Revision as of 23:24, 11 December 2023

Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591
ML23320A247
Person / Time
Site: Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle  Constellation icon.png
Issue date: 11/17/2023
From: Scott Wall
Plant Licensing Branch III
To: Rhoades D
Constellation Energy Generation
Wall, SP
References
EPID L-2023-LLR=0098
Download: ML23320A247 (1)


Text

November 17, 2023 LICENSEE: Constellation Energy Generation, LLC FACILITIES: Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant

SUBJECT:

SUMMARY

OF NOVEMBER 14, 2023, PUBLIC PRE-APPLICATION MEETING WITH CONSTELLATION ENERGY GENERATION, LLC ON ADOPTION OF TSTF-591 (EPID L-2023-LRM-0098)

On November 14, 2023, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Constellation Energy Generation, LLC (CEG, the licensee) via teleconference. The purpose of this meeting was to discuss CEGs plans to submit license amendment requests (LARs) to adopt Technical Specifications Task Force (TSTF)

Traveler TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program for Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant (collectively, the CEG facilities). The meeting notice and agenda dated November 1, 2023, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML23306A104, and CEGs meeting handout is available at ML23317A071. A list of attendees is enclosed.

The licensee presented information regarding the schedule and contents of the upcoming LARs to adopt TSTF-591 for the CEG facilities. The licensee indicated that it seeks to:

1. Align to Regulatory Guide 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities, Revision 3, dated December 2020 (ML20238B871), within the technical specifications (TS) section 5.5, Programs and Manual, specific to the RICT Program for the CEG facilities;
2. Establish at each facilities a RICT Upgrade Reporting Program; and
3. Align those facilities with current reference to RG 1.200, Revision 2 (ML090410014), in the respective operating license condition related to the adoption of Title 10 of the Code of Federal Regulations (10 CFR), section 50.69., Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors, with the changes related to adoption of TSTF-591.

CEG indicated that it plans to submit the LARs requests no later than January 2024. The NRC staff recommended that the application address the following regarding Probabilistic Risk Assessment (PRA) models and history the CEG facilities:

1. PRA modeled hazards remain the same for those approved for adoption of 10 CFR 50.69 and TSTF-505, Provide Risk-Informed Extended Completion Times -

RITSTF [Risk-Informed TSTF] Initiative 4b, (ML18183A493) (i.e., no interjection of new PRA models to be review for PRA acceptability for use in the risk-informed programs).

2. Any changes to the PRA models that incorporate a Newly Developed Method that has not been approved for use by the NRC or upgrade that has not been peer reviewed.

The NRC staff appreciated that the licensee held the meeting early in the development process so that any staff comments could be considered in the application.

No members of the public had questions or comments during the meeting. No regulatory decisions were made at this meeting. Please direct any inquiries to me at 301-415-2855, or Scott.Wall@nrc.gov.

Sincerely,

/RA/

Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-277, 50-278, 50-254, 50-265, and 50-244

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES NOVEMBER 14, 2023, PUBLIC MEETING WITH CONSTELLATION ENERGY GENERATION, LLC PLANNED LICENSE AMENDMENT REQUEST RELATED TO TSTF-591 Name Organization Scott Wall Nuclear Regulatory Commission (NRC)

Hipo Gonzalez NRC Bob Pascarelli NRC Jen Whitman NRC Andrea Russell NRC Adrienne Brown NRC Michelle Honcharik NRC Ed Miller NRC Justin Poole NRC Michael Marshall NRC Sujata Goetz NRC V Sreenivas NRC Audrey Klett NRC Richard Guzman NRC Elena Herrera Torres NRC Stephen Flickinger Constellation Energy Generation, LLC (CEG)

Roy Linthicum CEG David Passehl CEG Philip Tarpinian CEG Jeff Stone CEG Victoria Anderson Nuclear Energy Institute (NEI)

Enclosure

ML23320A247 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NAME SWall SRohrer JWhited DATE 11/15/2023 11/16/2023 11/17/2023 OFFICE NRR/DORL/LPL3/PM NAME SWall DATE 11/17/2023