ML20212N068: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20212N068
| number = ML20212N068
| issue date = 03/06/1987
| issue date = 03/06/1987
| title = Informs That NRC 870128 Ltr Did Not Provide Reviewed Position Re Util Denial of Alleged Violation 3(B) Noted in Insp Repts 50-348/85-08 & 50-364/85-08.Denial of Alleged Violation Affirmed & Reviewed Position Requested
| title = Informs That NRC Did Not Provide Reviewed Position Re Util Denial of Alleged Violation 3(B) Noted in Insp Repts 50-348/85-08 & 50-364/85-08.Denial of Alleged Violation Affirmed & Reviewed Position Requested
| author name = Mcdonald R
| author name = Mcdonald R
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NA-87-0130, NA-87-130, NUDOCS 8703120337
| document report number = NA-87-0130, NA-87-130, NUDOCS 8703120337
| title reference date = 01-28-1987
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
Line 25: Line 26:


==SUBJECT:==
==SUBJECT:==
Inspection Report Nos. 50-348/85-08 and 50-364/85-08 RE:            NRC ' letter dated January 28, 1987 The referenced letter made comments concerning your evaluation of Alabama Power Company's denial of alleged violation 3 (B) which is -
Inspection Report Nos. 50-348/85-08 and 50-364/85-08 RE:            NRC ' {{letter dated|date=January 28, 1987|text=letter dated January 28, 1987}} The referenced letter made comments concerning your evaluation of Alabama Power Company's denial of alleged violation 3 (B) which is -
documented in the referenced ' inspection report.              By letter dated March 20,1985, Alabama Power Company denied this alleged violation.
documented in the referenced ' inspection report.              By {{letter dated|date=March 20, 1985|text=letter dated March 20,1985}}, Alabama Power Company denied this alleged violation.
Your letter- of January 28, 1987, did not provide your reviewed position on the alleged violation. Alabama Power Company continues to deny this alleged violation and requests that you provide us with your reviewed position.
Your letter- of January 28, 1987, did not provide your reviewed position on the alleged violation. Alabama Power Company continues to deny this alleged violation and requests that you provide us with your reviewed position.
Yours very    - ,
Yours very    - ,
b R. P. Mcdonald RPM /JGS :mab/G-87.2 cc:      Dr. J. N. Grace Mr. L. B. Long Mr. W. H. Bradford File
b R. P. Mcdonald RPM /JGS :mab/G-87.2 cc:      Dr. J. N. Grace Mr. L. B. Long Mr. W. H. Bradford File
{W 31{0            QO          8                                                          I O O}}
{W 31{0            QO          8                                                          I O O}}

Latest revision as of 04:17, 5 May 2021

Informs That NRC Did Not Provide Reviewed Position Re Util Denial of Alleged Violation 3(B) Noted in Insp Repts 50-348/85-08 & 50-364/85-08.Denial of Alleged Violation Affirmed & Reviewed Position Requested
ML20212N068
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/06/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NA-87-0130, NA-87-130, NUDOCS 8703120337
Download: ML20212N068 (1)


Text

o -

y

[ Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 -

Telephone 205 250-1835 g

AlabamaPower R. P. Mcdonald

' Senior Vice President - ###M 8M NA-87-0130-March 6,1987 Docket No. 50-348 Docket No. 50-364

~ U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Inspection Report Nos. 50-348/85-08 and 50-364/85-08 RE: NRC ' letter dated January 28, 1987 The referenced letter made comments concerning your evaluation of Alabama Power Company's denial of alleged violation 3 (B) which is -

documented in the referenced ' inspection report. By letter dated March 20,1985, Alabama Power Company denied this alleged violation.

Your letter- of January 28, 1987, did not provide your reviewed position on the alleged violation. Alabama Power Company continues to deny this alleged violation and requests that you provide us with your reviewed position.

Yours very - ,

b R. P. Mcdonald RPM /JGS :mab/G-87.2 cc: Dr. J. N. Grace Mr. L. B. Long Mr. W. H. Bradford File

{W 31{0 QO 8 I O O