Mhth-Al:bima Pow:r Company 600 North 18th Street Post Offace Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835

'7 ~I W 30 A10 : P D L

senioMce"ee'sioeni Mkmhe the southern ehrinc system January 28, 1987 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Comission Region II, Suite 2900 101 Marietta Street, N. W.

Atlanta, Georgia 30323 Attention: Mr. David M. Verrelli Gentlemen:

Joseph M. Farley Nuclear Plant NRC Inspection Report Nos. 50-348/86-28 and 50-364/86-28 In response to your letter of December 30, 1986, provided herein are planned corrective actions for the exercise weaknesses identified during the December Emergency Exercise.

Exercise weakness 50-348/86-28-02, 50-364/86-28-02: Failure to include in the initial protective action recommendation following declaration of the General Emergency the 22.5 sectors immediately adjacent to the principal zone exposed to the plume.

FNP will revise FNP-O-EIP-9, " Radiation Exposure Estimation and Classification of Emergencies", to provide additional guidance for evacuation and sheltering of the general public to ensure consideration is given to sectors adjacent to plume location when making protective action recommendations. This action will be completed by February 13, 1986.

l Exercise weaknass 50-348/86-28-03, 50-364/86-28-03: RMT 1 failed to implement the requirements of Procedure FNP-O-EIP-4 and demonstrated a lack of adequate training.

FNP will provide expanded RMT training to address specifically the weaknesses noted during the 1986 Emergency Exercise and to include field monitoring experience. The training is scheduled to be completed by July 1987.

I If there are any questions, please advise.

Ver trul your,

)

\\

y

'b R. P. Mcdonald RPM:emb 6-3C I