ML20205C238: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:- . | ||
4 | |||
~ ' | |||
4. | |||
SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 UNIT 1 | |||
~ | |||
DATE 2/2/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 MONTH January 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 o | |||
\ | |||
2 0 18 0 3 0 19 o 4 0 20 0 5 0 21 0 6 0 22 0 | |||
7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 SPF 51.005.01-5 Rev. 2 B703300139 870131 PDR ADOCK 05000322 R PDR 1 | |||
{ | |||
_ _ - _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - ) | |||
O SHOREHAM NUCLEAR POWER STATION | |||
, OPERATING DATA REPORT DOCKET No. 50-322 i | |||
UNIT 1 DATE 2/2/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 OPERATING STATUS | |||
: l. Reporting Period: 1/87 Gross hours in Reporting Period 744 | |||
: 2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): J | |||
: 3. Power Level to which Restricted (if any) (MWe-Net): N/A 4 Reasons for Restriction (if any): | |||
This month Yr to Date Cumulative 1 | |||
: 5. Number of Hours Reactor was Critical........... 0 0 0 | |||
. 6. Reactor Reserve Shutdown Hours................. 744 744 744 | |||
: 7. Hours Generator on Line........................ 0 0 0 | |||
: 8. Unit Reserve Shutdown Hours.................... 0 0 0- | |||
: 9. Gross Thermal Energy Generated (MWH)........... 0 0 0 | |||
: 10. Gross Electrical Energy Generated (MWH)........ 0 0 0 | |||
: 11. Net Electrical Energy Generated (MWH) . . . . . . . . . . 0- 0 0 | |||
: 12. Reactor Service Factor......................... N/A | |||
: 13. Reactor Availability Factor.................... N/A | |||
; 14. Unit Service Factor............................ N/A | |||
: 15. Unit Availability Factor....................... N/A | |||
: 16. Unit Capacity Factor (Using MDC)............... N/A | |||
. 17. Unit Capacity Factor (Using Design MWe) . . .'. . . . . N/A | |||
: 18. Unit Forced Outage Rate.................>....... N/A | |||
: 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
Post 5% Power Ascension Test Program Out, age, 9/1/86 to 7/1/87, 10 months | |||
: 20. If Shut Down at end of Report Period, Estimated Date of Startup: 7/1/87 | |||
: 21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/1/86 8/26/86 j COMMERCIAL OPERATION 9/1/87 SPF 51.005.01-6 Rev. 2 | |||
--- . - . , , - , , - , , , . , -,v-- , , - . - - - , . . , . - - , .,-,,-,..---,,,,.<-n - | |||
t SHOREHAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS | |||
* DOCRET No. 50-322 UNIT 1 DATE 2/2/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 REPORT MONTH January 1987 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS 2 860831 S 744 4- Post 5% 1 - Controlled Shutdown Power Ascension Test Program - | |||
Outage | |||
==SUMMARY== | |||
: Post 5% Power Ascension Test Program continued during the month a | |||
SPF 51.005.01-7 Rev. 2 e | |||
/ | |||
p+a , es%. m sem e .v. # | |||
( g | |||
,E LONG ISLAND LIGHTING COMPANY 2 --a- s .. w . s o u.,. SHOREHAM NUCLE AR POWER ST ATION | |||
* P.O Box 628 = WADING RIVE R, NEW YORK 11792 TE L. (516) 929 8300 February 2, 1987 PM-87-021 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 | |||
==Dear Sir:== | |||
In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station January Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant. | |||
If you have any questions, please contact us. | |||
Very truly yours, Pf a W.E. Ste} er, Jr. | |||
Plant Manager WES/km Enclosure cc: Dr. Thomas Murley, Regional Administrator Clt.y Warren , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 l | |||
l t | |||
f(t | |||
: T E.2y F'C- 868 2.2}} |
Revision as of 06:00, 30 December 2020
ML20205C238 | |
Person / Time | |
---|---|
Site: | Shoreham File:Long Island Lighting Company icon.png |
Issue date: | 01/31/1987 |
From: | Dreyfuss J, Steiger W LONG ISLAND LIGHTING CO. |
To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
References | |
PM-87-021, PM-87-21, NUDOCS 8703300139 | |
Download: ML20205C238 (4) | |
Text
- .
4
~ '
4.
SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 UNIT 1
~
DATE 2/2/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 MONTH January 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 o
\
2 0 18 0 3 0 19 o 4 0 20 0 5 0 21 0 6 0 22 0
7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 SPF 51.005.01-5 Rev. 2 B703300139 870131 PDR ADOCK 05000322 R PDR 1
{
_ _ - _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - )
O SHOREHAM NUCLEAR POWER STATION
, OPERATING DATA REPORT DOCKET No. 50-322 i
UNIT 1 DATE 2/2/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 OPERATING STATUS
- l. Reporting Period: 1/87 Gross hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt): 121.8 Max. Depend. Capacity (MWe-Net): 839 Design Electrical Rating (MWe-Net): J
- 3. Power Level to which Restricted (if any) (MWe-Net): N/A 4 Reasons for Restriction (if any):
This month Yr to Date Cumulative 1
- 5. Number of Hours Reactor was Critical........... 0 0 0
. 6. Reactor Reserve Shutdown Hours................. 744 744 744
- 7. Hours Generator on Line........................ 0 0 0
- 8. Unit Reserve Shutdown Hours.................... 0 0 0-
- 9. Gross Thermal Energy Generated (MWH)........... 0 0 0
- 10. Gross Electrical Energy Generated (MWH)........ 0 0 0
- 11. Net Electrical Energy Generated (MWH) . . . . . . . . . . 0- 0 0
- 12. Reactor Service Factor......................... N/A
- 13. Reactor Availability Factor.................... N/A
- 14. Unit Service Factor............................ N/A
- 15. Unit Availability Factor....................... N/A
- 16. Unit Capacity Factor (Using MDC)............... N/A
. 17. Unit Capacity Factor (Using Design MWe) . . .'. . . . . N/A
- 18. Unit Forced Outage Rate.................>....... N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Post 5% Power Ascension Test Program Out, age, 9/1/86 to 7/1/87, 10 months
- 20. If Shut Down at end of Report Period, Estimated Date of Startup: 7/1/87
- 21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/1/86 8/26/86 j COMMERCIAL OPERATION 9/1/87 SPF 51.005.01-6 Rev. 2
--- . - . , , - , , - , , , . , -,v-- , , - . - - - , . . , . - - , .,-,,-,..---,,,,.<-n -
t SHOREHAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS
- DOCRET No. 50-322 UNIT 1 DATE 2/2/87 COMPLETED BY J. Dreyfuss TELEPHONE (516)929-8300 REPORT MONTH January 1987 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS 2 860831 S 744 4- Post 5% 1 - Controlled Shutdown Power Ascension Test Program -
Outage
SUMMARY
- Post 5% Power Ascension Test Program continued during the month a
SPF 51.005.01-7 Rev. 2 e
/
p+a , es%. m sem e .v. #
( g
,E LONG ISLAND LIGHTING COMPANY 2 --a- s .. w . s o u.,. SHOREHAM NUCLE AR POWER ST ATION
- P.O Box 628 = WADING RIVE R, NEW YORK 11792 TE L. (516) 929 8300 February 2, 1987 PM-87-021 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shoreham Nuclear Power Station January Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
Very truly yours, Pf a W.E. Ste} er, Jr.
Plant Manager WES/km Enclosure cc: Dr. Thomas Murley, Regional Administrator Clt.y Warren , Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 l