IR 05000482/2013301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 21: Line 21:
[[Issue date::September 12, 2013]]
[[Issue date::September 12, 2013]]


Matthew W. Sunseri, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
Matthew W. Sunseri, President and  
 
Chief Executive Officer  
 
Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839


SUBJECT: WOLF CREEK GENERATING STATION - NRC EXAMINATION REPORT 05000482/2013301
SUBJECT: WOLF CREEK GENERATING STATION - NRC EXAMINATION REPORT 05000482/2013301
Line 28: Line 32:
On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Wolf Creek Generating Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on July 25, 2013, with yourself and other members of your staff. A telephonic exit meeting was conducted on August 8, 2013, with Mr. James Knapp, who was provided the NRC licensing decisions.
On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Wolf Creek Generating Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on July 25, 2013, with yourself and other members of your staff. A telephonic exit meeting was conducted on August 8, 2013, with Mr. James Knapp, who was provided the NRC licensing decisions.


The examination included the evaluation of six applicants for reactor operator licenses and one applicant for an instant senior reactor operator license. The license examiners determined that all seven applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued. There were ten post examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 summarizes post examination comment resolution. No findings were identified during this examination.
The examination included the evaluation of six applicants for reactor operator licenses and one applicant for an instant senior reactor operator license. The license examiners determined that all seven applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued. There were ten post examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 summarizes post examination comment resolution.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
No findings were identified during this examination.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
 
enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
Sincerely,/RA/
Line 39: Line 48:


===w/Attachment:===
===w/Attachment:===
Supplemental Information 2. NRC Post Examination Comment Resolution cc: Electronic Distribution for Wolf Creek Nuclear Generating Station
Supplemental Information 2. NRC Post Examination Comment Resolution  
 
cc: Electronic Distribution for Wolf Creek Nuclear Generating Station  
 
ML13255A296 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: DGS Publicly Available Non-Sensitive Non-publicly Available Sensitive OE:OB SOE:OB SOE:OB C:PB C:OB SHedger KClayton DStrickland NOKeefe VGaddy /RA/ /RA/ /RA/ /RA/ /RA/ 9/11/13 9/10/13 9/10/13 9/11/13 9/12/13 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 50-482 License: NPF-42 Report: 05000482/2013301 Licensee: Wolf Creek Nuclear Operating Corporation Facility Wolf Creek Generating Station Location: 1550 Oxen Lane NE Burlington, Kansas Dates: June 17, 2013 - August 8, 2013 Inspectors: D. Strickland, Senior Operations Engineer K. Clayton, Senior Operations Engineer
 
S. Hedger, Operations Engineer Approved By: Vince Gaddy, Chief Operations Branch
 
Division of Reactor Safety


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
ER05000482/2013301; June 17, 2013 - August 8, 2013; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Examination Development
ER05000482/2013301; June 17, 2013 - August 8, 2013; Wolf Creek Generating Station; Initial  
 
Operator Licensing Examination Report; Examination Development  


NRC examiners evaluated the competency of six applicants for reactor operator licenses and one applicant for an instant senior reactor operator license at Wolf Creek Generating Station.
NRC examiners evaluated the competency of six applicants for reactor operator licenses and one applicant for an instant senior reactor operator license at Wolf Creek Generating Station.
Line 51: Line 70:


===A. NRC-Identified and Self-Revealing Findings===
===A. NRC-Identified and Self-Revealing Findings===
None   
None   


===B. Licensee-Identified Violations===
===B. Licensee-Identified Violations===
None
None


Line 78: Line 99:
No findings were identified.
No findings were identified.


NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration. NRC examiners determined that the written examination initially submitted by the licensee was not within the range of acceptability expected for a proposed examination.
NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
 
NRC examiners determined that the written ex amination initially submitted by the licensee was not within the range of acceptability expected for a proposed examination.


There were 38 questions categorized as unsatisfactory per NUREG-1021 requirements, with the two most common issues being knowledge/ability mismatch or two or more distracters that were not credible. Additionally, there were 36 questions that needed editorial changes, and 26 questions that were satisfactory as originally submitted.
There were 38 questions categorized as unsatisfactory per NUREG-1021 requirements, with the two most common issues being knowledge/ability mismatch or two or more distracters that were not credible. Additionally, there were 36 questions that needed editorial changes, and 26 questions that were satisfactory as originally submitted.


Consistent with the corporate notification letter sent to licensees at the start of examination development for each examination, future unsatisfactory examination submittals may cause the examinations to be rescheduled or cancelled. The licensee wrote Condition Report 00073742 to address these exam development issues.
Consistent with the corporate notification letter sent to licensees at the start of examination development for each examinati on, future unsatisfactory examination submittals may cause the examinations to be rescheduled or cancelled. The licensee wrote Condition Report 00073742 to address these exam development issues.


===.3 Operator Knowledge and Performance===
===.3 Operator Knowledge and Performance===


====a. Scope====
====a. Scope====
On July 19, 2013, the licensee proctored the administration of the written examinations to all seven applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis and post examination comments to the NRC on August 2, 2013. The NRC examination team administered the various portions of the operating tests to all ten applicants on the week of July 22, 2013.
On July 19, 2013, the licensee proctored the administration of the written examinations to all seven applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis and post examination comments to the NRC on August 2, 2013.
 
The NRC examination team administered the various portions of the operating tests to all ten applicants on the week of July 22, 2013.


====b. Findings====
====b. Findings====
Line 99: Line 124:


====a. Scope====
====a. Scope====
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
The NRC examiners observed simulator performanc e with regard to plant fidelity during examination validation and administration.


====b. Findings====
====b. Findings====
Line 113: Line 138:


===.6 Facility Post Examination Comments===
===.6 Facility Post Examination Comments===
The facility provided the NRC chief examiner with ten post administration comments on the written examination. These comments are included in Enclosure 2 to this report and in ADAMS under as Accession Number ML 13248A545.  
 
The facility provided the NRC chief examiner with ten post administration comments on the written examination. These comments are included in Enclosure 2 to this report and in ADAMS under as Accession Number ML 13248A545.
 
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, Including Exit==
==4OA6 Meetings, Including Exit==
The chief examiner presented the preliminary examination results to Mr. Al Camp, Plant Manager, and other members of the staff on July 25, 2013. A telephonic exit was conducted on August 8, 2013, between Mr. Duane Strickland, Chief Examiner, and Mr. James Knapp, Supervisor, Operations Training.
The chief examiner presented the preliminary examination results to Mr. Al Camp, Plant Manager, and other members of the staff on July 25, 2013. A telephonic exit was conducted on August 8, 2013, between Mr. Duane Strickland, Chief Examiner, and Mr. James Knapp, Supervisor, Operations Training.


Line 132: Line 160:
James Knapp, Supervisor, Operations Training
James Knapp, Supervisor, Operations Training
Edward Ray, Manager Training
Edward Ray, Manager Training
Terry Damashek, Supervisor Operations Support Training Brendan Ryan, Initial Licensing Supervising Instructor Robert Acree, Simulator Fidelity Coordinator
Terry Damashek, Supervisor Operations Support Training Brendan Ryan, Initial Licensing Supervising Instructor
Robert Acree, Simulator Fidelity Coordinator
George Smith, Initial Licensing Supervising Instructor  
George Smith, Initial Licensing Supervising Instructor  


===NRC Personnel===
===NRC Personnel===
Charles Peabody, Senior Resident Inspector
Charles Peabody, Senior Resident Inspector  


==ADAMS DOCUMENTS REFERENCED==
==ADAMS DOCUMENTS REFERENCED==
Line 144: Line 173:
: Accession No.
: Accession No.
: ML 13248A547 - FINAL OPERATING TEST  
: ML 13248A547 - FINAL OPERATING TEST  
: NRC Review of WC Written Post-Examination Comments
: NRC Review of WC Written Post-Examination Comments Note:
: Note:
: A complete text of the licensee's post examination analysis and comments can be found in ADAMS under Accession Number ML13248A545.
: A complete text of the licensee's post examination analysis and comments can be found in ADAMS under Accession Number ML13248A545.
: QUESTION 2
: QUESTION 2
: Given the following plant conditions:  
: Given the following plant conditions:  
  * The Unit is operating at 68% power  
  * The Unit is operating at 68% power  
* The crew is responding to a control bank D rod inadvertent withdrawal  
* The crew is responding to a control bank D rod inadvertent withdrawal  
* The control rods are placed in manual and the withdrawal stops  
* The control rods are placed in manual and the withdrawal stops  
* The reactor did not trip * Control rod M4 indicates 6 steps above the rest of the bank
* The reactor did not trip * Control rod M4 indicates 6 steps above the rest of the bank Which ONE of the following sets of parameters describes the effect of this malfunction?  
: Which ONE of the following sets of parameters describes the effect of this malfunction?  
: A. QPTR goes down, Delta T goes up.
: A. QPTR goes down, Delta T goes up.
: B. QPTR goes down, Delta T stays the same. C. QPTR goes up, Delta T goes up. D. QPTR goes up, Delta T stays the same.
: B. QPTR goes down, Delta T stays the same. C. QPTR goes up, Delta T goes up. D. QPTR goes up, Delta T stays the same.
: Key Answer:
: Key Answer:
: D
: D
: Licensee Comments for Question 2:
: Licensee Comments for Question 2
:
: Q2 The stem does not specify a time frame, thus the Applicant is left with two options, both an initial effect and a long term or steady state effect of the stem conditions.
: Q2 The stem does not specify a time frame, thus the Applicant is left with two options, both an initial effect and a long term or steady state effect of the stem conditions.
: Therefore the Applicants could interpret 'D' as correct based on the textbook theory (GFES) or 'C' as correct based on actual plant response.
: Therefore the Applicants could interpret 'D' as correct based on the textbook theory (GFES) or 'C' as correct based on actual plant response.
Line 181: Line 210:


   - 2 -
   - 2 -
: NRC Resolution of Question 2:
: NRC Resolution of Question 2
:
: WC recommended that response C be accepted for this question based on plant response for a small positive reactivity addition they had experienced in the plant.
: WC recommended that response C be accepted for this question based on plant response for a small positive reactivity addition they had experienced in the plant.
: In addition, answer D was the expected correct answer based on classroom theory taught to the applicants.
: In addition, answer D was the expected correct answer based on classroom theory taught to the applicants.
: The non-
: The non-
specified time frame, initial response vs. a longer term response, lead the applicants to choose a different answer.
specified time frame, initial response vs. a longer term response, lead the applicants to choose a different answer.
: The NRC Region IV staff agrees with this position and therefore both answer C and answer D are accepted for this question in accordance with
: The NRC Region IV staff ag rees with this position and therefore both answer C and answer D are accepted for this question in accordance with
: ES-403 D.1.c.
: ES-403 D.1.c.
: QUESTION 9
: QUESTION 9
: Given the following plant conditions:  * A large LOCA has occurred * RCS is at saturation with system pressure matching Containment pressure  
: Given the following plant conditions:  
  * A large LOCA has occurred * RCS is at saturation with system pressure matching Containment pressure  
* RHR train flows are: 'A' flow is 3350gpm, 'B' flow is 3150 gpm  
* RHR train flows are: 'A' flow is 3350gpm, 'B' flow is 3150 gpm  
* RWST is 8% and dropping slowly
* RWST is 8% and dropping slowly What is the expected configuration for the Residual Heat Removal Pumps under these conditions AND what parameter is used to determine subsequent RHR pump configuration?  
: What is the expected configuration for the Residual Heat Removal Pumps under these conditions AND what parameter is used to determine subsequent RHR pump configuration?
: A. Operating at rated flow of both pumps.
: A. Operating at rated flow of both pumps.
: RCS Pressure is > 325 psig
: RCS Pressure is > 325 psig  
: B. Operating at rated flow of both pumps. RCS Hot Leg Temperature > 360F and at least One RHR Pump Running  
: B. Operating at rated flow of both pumps. RCS Hot Leg Temperature > 360F and at least One RHR Pump Running  
: C. Operating at near run out conditions.
: C. Operating at near run out conditions.
: RCS Pressure is > 325 psig
: RCS Pressure is > 325 psig  
: D. Operating at near run out conditions.
: D. Operating at near run out conditions.
: RCS Hot Leg Temperature > 360F and at least One RHR Pump Running Key Answer:
: RCS Hot Leg Temperature > 360F and at least One RHR Pump Running  
: Key Answer:
: A  
: A  
: Licensee Comments for Question 9:
: Licensee Comments for Question 9
:
: Q9
: Q9
: The question should be deleted because it contains information in the stem that was unclear and confused the Applicants, which is listed as a reason to accept post-exam changes per
: The question should be deleted because it contains information in the stem that was unclear and confused the Applicants, which is listed as a reason to accept post-exam changes  
 
per
: ES-403 D.1.b.
: ES-403 D.1.b.
: Request:
: Request:
: Delete Q9 from the exam.
: Delete Q9 from the exam.
: It is acceptable per NUREG 1021; section,
: It is acceptable per NUREG 1021; section,
: ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the necessary information.
: ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the  
 
necessary information.
: Context:
: Context:
: Stem:
: Stem:
Line 216: Line 252:
: Additionally, the Applicants were unsure as to plant lineup   
: Additionally, the Applicants were unsure as to plant lineup   
   - 3 -  status due to the "RWST dropping" slowly.
   - 3 -  status due to the "RWST dropping" slowly.
: This could be due to a leak on the tank, ECCS alignment, check valve problem, or containment spray alignment issue.
: This could be due to a leak on the tank, ECCS
alignment, check valve problem, or containment spray alignment issue.
: NRC Resolution of Question 9:
: NRC Resolution of Question 9:
: At WC, actual RHR flows in this configuration is not indicated on the RHR pump flow meters.
: At WC, actual RHR flows in this configuration is not indicated on the RHR pump flow meters.
: Additional RHR flow from operating the SIP's and CCP's in the piggy-back mode must be added to the RHR pump flow meters to obtain actual flow.
: Additional RHR flow from operating the SIP's and CCP's in the piggy-back mode must be added to the RHR pump flow meters to obtain actual fl ow.
: The RHR pump flows given in the stem was not realistic.
: The RHR pump flows given in the stem was not realistic.
: In addition, due to the Large Break LOCA in progress, there was no expectation of RCS pressure increasing to >325 psig.
: In addition, due to the Large Break LOCA in progress, there was no expectation of RCS pressure increasing to >325 psig.
Line 225: Line 262:
: ES-403 D.1.b.
: ES-403 D.1.b.
: QUESTION 10
: QUESTION 10
: Given the following plant conditions:  * PRT conditions are normal for 100% power  
: Given the following plant conditions:  
  * PRT conditions are normal for 100% power  
* The Unit was operating at 100% power when the turbine tripped * The reactor failed to automatically trip but was manually tripped * All other systems operated as expected  
* The Unit was operating at 100% power when the turbine tripped * The reactor failed to automatically trip but was manually tripped * All other systems operated as expected  
* The Emergency procedures have been performed and the plant stabilized  
* The Emergency procedures have been performed and the plant stabilized  
* It was noted that on the transient RCS pressure reached 2370 psig
* It was noted that on the transient RCS pressure reached 2370 psig Which ONE of the following represents the expected status of the PRT AND the actions that must be taken to restore it to normal limits?  
: Which ONE of the following represents the expected status of the PRT AND the actions that must be taken to restore it to normal limits?  
: A. PRT Pressure - 40 psig - High Vent excess pressure to the Gas Decay tanks.
: A. PRT Pressure - 40 psig - High Vent excess pressure to the Gas Decay tanks.
: B. PRT Pressure - 14 psig - High Recirc through the RCDT Hx and reduce pressure.
: B. PRT Pressure - 14 psig - High Recirc through the RCDT Hx and reduce pressure.
Line 235: Line 272:
: D. PRT Temperature - 220°F - High Add water to cool the tank and drain to the RCDT to maintain level.
: D. PRT Temperature - 220°F - High Add water to cool the tank and drain to the RCDT to maintain level.
: Key Answer:
: Key Answer:
: A
: A  
: Licensee Comments for Question 10:
: Licensee Comments for Question 10
:
: Q10
: Q10
: The stem lacked some operational validity in that the PRT high temp would have been reached and the stem lacked info on the duration that the PORV was open.
: The stem lacked some operational validity in that the PRT high temp would have been reached and the stem lacked info on the duration that the PORV was open.
: Because the stem did not provide all the necessary info, per
: Because the stem  
 
did not provide all the necessary info, per
: NUREG-1021 Section
: NUREG-1021 Section
: ES-403 D.1.b, it should be deleted from the examination.
: ES-403 D.1.b, it should be deleted from the examination.
Line 245: Line 285:
: Delete Q10 from the exam.
: Delete Q10 from the exam.
: It is acceptable per NUREG 1021; Section
: It is acceptable per NUREG 1021; Section
: ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the necessary information.
: ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the  
 
necessary information.
   - 4 -
   - 4 -
: Context:
: Context:
Line 254: Line 296:
: The amount of PORV cycling is dependent on the timing of the manual reactor trip relative to the turbine trip.
: The amount of PORV cycling is dependent on the timing of the manual reactor trip relative to the turbine trip.
: All that can be discerned from the stem is that the PORV cycled.
: All that can be discerned from the stem is that the PORV cycled.
: NRC Resolution of Question 10:
: NRC Resolution of Question 10
:
: The stem of the question did not provide operational validity.
: The stem of the question did not provide operational validity.
: Actual expected plant conditions should be given, not expect the applicants to determine plant conditions based on incomplete information.
: Actual expected plant conditions should be given, not expect the applicants to determine plant conditions based on incomplete information.
Line 260: Line 303:
: ES-403 D.1.b.
: ES-403 D.1.b.
: QUESTION 22
: QUESTION 22
: Given the following plant conditions:  * A Large Break LOCA has occurred  
: Given the following plant conditions:  
  * A Large Break LOCA has occurred  
* All RCP's are stopped  
* All RCP's are stopped  
* ECCS and ESF systems functioned as designed * RCS pressure equals Containment pressure * The operating crew is ready to transition out of EMG E-0, REACTOR TRIP OR SAFETY INJECTION  
* ECCS and ESF systems functioned as designed * RCS pressure equals Containment pressure * The operating crew is ready to transition out of EMG E-0, REACTOR TRIP OR SAFETY  
: RCP #1 Seal Leakoff is . . .
: INJECTION  
: RCP #1 Seal Leakoff is . . .  
: A. NOT OCCURRING.
: A. NOT OCCURRING.
: B. OCCURRING and flowing to the Pressurizer Relief Tank.
: B. OCCURRING and flowing to the Pressurizer Relief Tank.
Line 269: Line 314:
: D. OCCURRING and flowing to the Volume Control Tank.
: D. OCCURRING and flowing to the Volume Control Tank.
: Key Answer:
: Key Answer:
: B
: B  
: Licensee Comments for Question 22:
: Licensee Comments for Question 22
:
: Q22
: Q22
: It is proposed to delete the question due to a stem that did not provide all the necessary information.
: It is proposed to delete the question due to a stem that did not provide all the necessary information.
Line 298: Line 344:
: Seal injection continues, but the flow is diverted to the low pressure RCS, especially since the #1 seal faces are likely closed.
: Seal injection continues, but the flow is diverted to the low pressure RCS, especially since the #1 seal faces are likely closed.
: The only way to provide enough backpressure to lift the relief is for seal injection flow to be so large that the thermal barrier labyrinth seals to provide the backpressure.
: The only way to provide enough backpressure to lift the relief is for seal injection flow to be so large that the thermal barrier labyrinth seals to provide the backpressure.
: NRC Resolution of Question 22:
: NRC Resolution of Question 22
:
: The amount of seal injection flow following a Large Break LOCA determines whether or not seal leakoff is occurring.
: The amount of seal injection flow following a Large Break LOCA determines whether or not seal leakoff is occurring.
: This information was not given in the stem.
: This information was not given in the stem.
Line 305: Line 352:
: ES-403  
: ES-403  
: D.1.c.
: D.1.c.
: QUESTION 33
: QUESTION 33
: Why is it worse for an Anticipated Transient Without Scram event to occur at low power at the Beginning Of Life (BOL) conditions?  
: Why is it worse for an Anticipated Transient Without Scram event to occur at low power at the Beginning Of Life (BOL) conditions?  
: A. The additional burnable poisons provide LESS heat conduction at lower power; therefore, the fuel pin outer clad temperatures are HIGHER.
: A. The additional burnable poisons provide LESS heat conduction at lower power; therefore, the fuel pin outer clad temperatures are HIGHER.
Line 313: Line 360:
: The high boron concentration causes the emergency boration to be LESS EFFECTIVE; therefore, taking a LONGER time to achieve adequate Shutdown Margin (SDM).
: The high boron concentration causes the emergency boration to be LESS EFFECTIVE; therefore, taking a LONGER time to achieve adequate Shutdown Margin (SDM).
: Key Answer:
: Key Answer:
: B
: B  
: Licensee Comments for Question 33:
: Licensee Comments for Question 33
:
: Q33 The stem is unclear.
: Q33 The stem is unclear.
: The stem doesn't ask for the "principal" reason why an ATWS is worse at low power at BOL vs. EOL, thus answer 'D' could also be argued as correct.
: The stem doesn't ask for the "principal" reason why an ATWS is worse at low power at BOL vs. EOL, thus answer 'D' could also be argued as correct.
: Request:
: Request:
: Accept two correct answers for Q33.
: Accept two correct answers fo
r Q33.
: It is acceptable per NUREG 1021; Section
: It is acceptable per NUREG 1021; Section
: ES-403 D.1.c to accept two correct answers.
: ES-403 D.1.c to accept two correct answers.
Line 330: Line 379:
: Although this is not the principal success path in EMG
: Although this is not the principal success path in EMG
: FR-S1, RESPONSE TO NUCLEAR PWR GENERATION/ATWS, it is a secondary action to add negative reactivity that is always performed.
: FR-S1, RESPONSE TO NUCLEAR PWR GENERATION/ATWS, it is a secondary action to add negative reactivity that is always performed.
: NRC Resolution of Question 33:
: NRC Resolution of Question 33
:
: There are multiple reasons why an ATWS is worse at low power BOL.
: There are multiple reasons why an ATWS is worse at low power BOL.
: The stem did not ask for the major reason, leaving more than 1 correct reason.
: The stem did not ask for the major reason, leaving more than 1 correct reason.
: NRC Region IV staff agrees that both B and D responses are correct and therefore both answer B and answer D are accepted for this question in accordance with
: NRC Region IV staff agrees that both B and D responses are correct and therefore both answer B and answer D are accepted for this question in accordance with
: ES-403 D.1.c.
: ES-403 D.1.c.
: QUESTION 38
: QUESTION 38
: Given the following plant conditions:  * The Unit has experienced a steamline break  
: Given the following plant conditions:  
* None of the main steam isolation valves can be closed * EMG C-21, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS, has been implemented Which ONE of the following describes the reason for performing Attachment B, Main Steam Header Isolation - Local?
  * The Unit has experienced a steamline break  
* None of the main steam isolation valves can be closed * EMG C-21, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS, has been implemented  
: Which ONE of the following describes the reason for performing Attachment B, Main Steam Header Isolation - Local?  
: A. Isolation of both steam supply lines to the TDAFP is allowed, regardless of the status of the other sources of feed flow to the SGs, since no secondary heat sink is intact.
: A. Isolation of both steam supply lines to the TDAFP is allowed, regardless of the status of the other sources of feed flow to the SGs, since no secondary heat sink is intact.
: B. To restore integrity to at least one SG in order to transition to EMG E-2, FAULTED STEAM GENERATOR ISOLATION, via the foldout page.
: B. To restore integrity to at least one SG in order to transition to EMG E-2, FAULTED STEAM GENERATOR ISOLATION, via the foldout page.
Line 344: Line 396:
: Key Answer:
: Key Answer:
: B  
: B  
: Licensee Comments for Question 38:
: Licensee Comments for Question 38
:
: Q38
: Q38
: It is proposed to delete this question due to an unclear stem.
: It is proposed to delete this question due to an unclear stem.
Line 361: Line 414:
: Other:
: Other:
: TNA 2013-1345-1, Condition Report
: TNA 2013-1345-1, Condition Report
: 00072233 and Procedure Change Request 58807
: 00072233 and Procedure Change Request 58807  
 
were written.
were written.
: NRC Resolution of Question 38:   
: NRC Resolution of Question 38
:   
: This question was written with the expectation that an attempt would be made in Attachment B to locally close the MSIV's.
: This question was written with the expectation that an attempt would be made in Attachment B to locally close the MSIV's.
: Due to the replacement of WC MSIV's with a different model valve, there is no procedural step or method to locally close the MSIV's.
: Due to the replacem ent of WC MSIV's with a different model valve, there is no procedural step or method to locally close the MSIV's.
: Based on there being no clear answer, the NRC Region IV staff agrees with this position and therefore this question was deleted from the written examination.
: Based on there being no clear answer, the NRC Region IV staff agrees with this position and therefore this question was deleted from the written examination.
: QUESTION 65
: QUESTION 65
Line 376: Line 431:
: Key Answer:
: Key Answer:
: C  
: C  
: Licensee Comments for Question 65:
: Licensee Comments for Question 65
:
: Q65 Distractor 'B' could also be argued as correct based on an unclear stem not based on actual plant practices.
: Q65 Distractor 'B' could also be argued as correct based on an unclear stem not based on actual plant practices.
: Request:
: Request:
: Accept two correct answers for Q65.
: Accept two correct answers fo
r Q65.
: It is acceptable per NUREG 1021; Section
: It is acceptable per NUREG 1021; Section
: ES-403 D.1.c to accept two correct answers.
: ES-403 D.1.c to accept two correct answers.
Line 386: Line 443:
: Context:
: Context:
: It is proposed that distractor 'B' should be accepted in addition to answer 'C' based on a question with an unclear stem that confused the Applicants based on actual plant practices.
: It is proposed that distractor 'B' should be accepted in addition to answer 'C' based on a question with an unclear stem that confused the Applicants based on actual plant practices.
: Answer 'C' is correct in that a self-reading dosimeter and continuous surveillance by RP with a means of communication.
: Answer 'C' is correct in that a self-reading dosimeter and continuous surveillance by RP with a  
 
means of communication.
: The justification for distractor 'B' being incorrect was that it does not contain the reference to the device being monitored by Health Physics nor communications.
: The justification for distractor 'B' being incorrect was that it does not contain the reference to the device being monitored by Health Physics nor communications.
: However these conditions are implied since the only remote monitoring system at Wolf Creek is Teledose, which reads out at the RADs camera console at Access Control, with various options for local communication  
: However these conditions are implied since the only remote monitoring system at Wolf Creek is Teledose, which reads out at the RADs camera console at Access Control, with various options for local communication  
Line 394: Line 453:
: HP lead in the field.)
: HP lead in the field.)
: By simply obtaining the dosimetry, the field operator has met the requirements since the other requirements are part of that process.
: By simply obtaining the dosimetry, the field operator has met the requirements since the other requirements are part of that process.
: NRC Resolution of Question 65:   
: NRC Resolution of Question 65
:   
: Actual plant practices for entry into a 'Locked High Radiation Area' are similar to response B, while the proposed answer C is described in procedure
: Actual plant practices for entry into a 'Locked High Radiation Area' are similar to response B, while the proposed answer C is described in procedure
: AP 25A-200.
: AP 25A-200.

Revision as of 05:16, 4 July 2018

Er 05000482-13-301; June 17, 2013 - August 8, 2013; Wolf Creek Generating Station; Initial Operator Licensing Examination Report; Examination Development
ML13255A296
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/12/2013
From: Vincent Gaddy
Operations Branch IV
To: Sunseri M W
Wolf Creek
References
50-482/13-301
Download: ML13255A296 (17)


Text

September 12, 2013

Matthew W. Sunseri, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - NRC EXAMINATION REPORT 05000482/2013301

Dear Mr. Sunseri:

On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Wolf Creek Generating Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on July 25, 2013, with yourself and other members of your staff. A telephonic exit meeting was conducted on August 8, 2013, with Mr. James Knapp, who was provided the NRC licensing decisions.

The examination included the evaluation of six applicants for reactor operator licenses and one applicant for an instant senior reactor operator license. The license examiners determined that all seven applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued. There were ten post examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 summarizes post examination comment resolution.

No findings were identified during this examination.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Vince Gaddy, Chief Operations Branch Division of Reactor Safety Docket: 50-482 License: NPF-42

Enclosure:

1. NRC Examination Report 05000482/2013301

w/Attachment:

Supplemental Information 2. NRC Post Examination Comment Resolution

cc: Electronic Distribution for Wolf Creek Nuclear Generating Station

ML13255A296 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: DGS Publicly Available Non-Sensitive Non-publicly Available Sensitive OE:OB SOE:OB SOE:OB C:PB C:OB SHedger KClayton DStrickland NOKeefe VGaddy /RA/ /RA/ /RA/ /RA/ /RA/ 9/11/13 9/10/13 9/10/13 9/11/13 9/12/13 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 50-482 License: NPF-42 Report: 05000482/2013301 Licensee: Wolf Creek Nuclear Operating Corporation Facility Wolf Creek Generating Station Location: 1550 Oxen Lane NE Burlington, Kansas Dates: June 17, 2013 - August 8, 2013 Inspectors: D. Strickland, Senior Operations Engineer K. Clayton, Senior Operations Engineer

S. Hedger, Operations Engineer Approved By: Vince Gaddy, Chief Operations Branch

Division of Reactor Safety

SUMMARY OF FINDINGS

ER05000482/2013301; June 17, 2013 - August 8, 2013; Wolf Creek Generating Station; Initial

Operator Licensing Examination Report; Examination Development

NRC examiners evaluated the competency of six applicants for reactor operator licenses and one applicant for an instant senior reactor operator license at Wolf Creek Generating Station.

The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on July 19, 2013. NRC examiners administered the operating tests on the week of July 22, 2013.

The examiners determined that all seven of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.

A. NRC-Identified and Self-Revealing Findings

None

B. Licensee-Identified Violations

None

REPORT DETAILS

OTHER ACTIVITIES (OA)

4OA5 Other Activities (Initial Operator License Examination)

.1 License Applications

a. Scope

NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.

b. Findings

No findings were identified.

.2 Examination Development

a. Scope

NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.

b. Findings

No findings were identified.

NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.

NRC examiners determined that the written ex amination initially submitted by the licensee was not within the range of acceptability expected for a proposed examination.

There were 38 questions categorized as unsatisfactory per NUREG-1021 requirements, with the two most common issues being knowledge/ability mismatch or two or more distracters that were not credible. Additionally, there were 36 questions that needed editorial changes, and 26 questions that were satisfactory as originally submitted.

Consistent with the corporate notification letter sent to licensees at the start of examination development for each examinati on, future unsatisfactory examination submittals may cause the examinations to be rescheduled or cancelled. The licensee wrote Condition Report 00073742 to address these exam development issues.

.3 Operator Knowledge and Performance

a. Scope

On July 19, 2013, the licensee proctored the administration of the written examinations to all seven applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis and post examination comments to the NRC on August 2, 2013.

The NRC examination team administered the various portions of the operating tests to all ten applicants on the week of July 22, 2013.

b. Findings

No findings were identified.

All seven applicants passed all portions of the operating test. All of the applicants passed the written examination. The final written examinations and post-examination analysis and comments may be accessed in the ADAMS system under the accession numbers noted in the attachment. Post examination comments formally submitted by the licensee are included in the Enclosure 2 of this report.

The examination team noted a generic weakness during the administration of the Job Performance Measure associated with the ability to complete a Containment Purge Isolation. Three out of seven applicants initially closed two incorrect dampers, prior to closing the correct dampers. There was also a generic weakness noted in the completion of the Job Performance Measure associated with a task on the Radiation Monitoring Panel. Two of seven operators had problems with the operation of the RM11R panel. The licensee wrote Condition Report 00072089 to address the Radiation Monitoring Panel issue.

.4 Simulation Facility Performance

a. Scope

The NRC examiners observed simulator performanc e with regard to plant fidelity during examination validation and administration.

b. Findings

No findings were identified.

.5 Examination Security

a. Scope

The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.

b. Findings

No findings were identified.

.6 Facility Post Examination Comments

The facility provided the NRC chief examiner with ten post administration comments on the written examination. These comments are included in Enclosure 2 to this report and in ADAMS under as Accession Number ML 13248A545.

4OA6 Meetings, Including Exit

The chief examiner presented the preliminary examination results to Mr. Al Camp, Plant Manager, and other members of the staff on July 25, 2013. A telephonic exit was conducted on August 8, 2013, between Mr. Duane Strickland, Chief Examiner, and Mr. James Knapp, Supervisor, Operations Training.

All proprietary information and materials used during the examination were returned to the licensee.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

Al Camp, Plant Manager

Steve Henry, Operations Manager Shane Battenfield, Operations Instructor Kenneth Fredrickson, Licensing

James Knapp, Supervisor, Operations Training

Edward Ray, Manager Training

Terry Damashek, Supervisor Operations Support Training Brendan Ryan, Initial Licensing Supervising Instructor

Robert Acree, Simulator Fidelity Coordinator

George Smith, Initial Licensing Supervising Instructor

NRC Personnel

Charles Peabody, Senior Resident Inspector

ADAMS DOCUMENTS REFERENCED

Accession No.

ML 13248A540- FINAL WRITTEN EXAMS (Delayed release until July 26, 2015) Accession No.
ML 13248A545 - POST EXAM ANALYSIS
Accession No.
ML 13248A547 - FINAL OPERATING TEST
NRC Review of WC Written Post-Examination Comments Note:
A complete text of the licensee's post examination analysis and comments can be found in ADAMS under Accession Number ML13248A545.
QUESTION 2
Given the following plant conditions:
  • The Unit is operating at 68% power
  • The crew is responding to a control bank D rod inadvertent withdrawal
  • The control rods are placed in manual and the withdrawal stops
  • The reactor did not trip * Control rod M4 indicates 6 steps above the rest of the bank Which ONE of the following sets of parameters describes the effect of this malfunction?
A. QPTR goes down, Delta T goes up.
B. QPTR goes down, Delta T stays the same. C. QPTR goes up, Delta T goes up. D. QPTR goes up, Delta T stays the same.
Key Answer:
D
Licensee Comments for Question 2
Q2 The stem does not specify a time frame, thus the Applicant is left with two options, both an initial effect and a long term or steady state effect of the stem conditions.
Therefore the Applicants could interpret 'D' as correct based on the textbook theory (GFES) or 'C' as correct based on actual plant response.
Request:
Accept two correct answers for Q2.
It is acceptable per NUREG 1021; section
ES-403 D.1.c to accept two correct answers.
Context:
Answer 'D' states that QPTR goes up, and Delta T remains the same.
This was the correct answer based on a reactor core power tilt from the misaligned rod, and that turbine load is not being changed.
Distractor 'C' states that QPTR goes up and Delta T goes up.
This answer is correct based on actual plant operation.
When plant power is stable, we operate the turbine in open-loop control, which results in a fixed turbine control valve position.
The positive reactivity addition results in an increase in RCS temperature.
The increase in RCS temperature increases SG pressure.
The increase in SG pressure results in a higher steam flow and higher power.
There is some negative offset due to the smaller Cp at higher temperatures affecting delta-T, but this is nearly insignificant.
This effect is demonstrated by actual plant behavior during dilutions to maintain reactor power.
Although this is very small and not visible on analog indications, our control band at full power is 3 MWt (0.1%).
Therefore the Applicants witnessed this plant response multiple times during their time on shift.
The effect would be much larger depending on the actual amount of rod withdrawal prior to placing rods in manual.

- 2 -

NRC Resolution of Question 2
WC recommended that response C be accepted for this question based on plant response for a small positive reactivity addition they had experienced in the plant.
In addition, answer D was the expected correct answer based on classroom theory taught to the applicants.
The non-

specified time frame, initial response vs. a longer term response, lead the applicants to choose a different answer.

The NRC Region IV staff ag rees with this position and therefore both answer C and answer D are accepted for this question in accordance with
ES-403 D.1.c.
QUESTION 9
Given the following plant conditions:
  • A large LOCA has occurred * RCS is at saturation with system pressure matching Containment pressure
  • RHR train flows are: 'A' flow is 3350gpm, 'B' flow is 3150 gpm
  • RWST is 8% and dropping slowly What is the expected configuration for the Residual Heat Removal Pumps under these conditions AND what parameter is used to determine subsequent RHR pump configuration?
A. Operating at rated flow of both pumps.
RCS Pressure is > 325 psig
B. Operating at rated flow of both pumps. RCS Hot Leg Temperature > 360F and at least One RHR Pump Running
C. Operating at near run out conditions.
RCS Pressure is > 325 psig
D. Operating at near run out conditions.
RCS Hot Leg Temperature > 360F and at least One RHR Pump Running
Key Answer:
A
Licensee Comments for Question 9
Q9
The question should be deleted because it contains information in the stem that was unclear and confused the Applicants, which is listed as a reason to accept post-exam changes

per

ES-403 D.1.b.
Request:
Delete Q9 from the exam.
It is acceptable per NUREG 1021; section,
ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the

necessary information.

Context:
Stem:
Post-exam feedback indicated that the Applicants thought RHR flows were low based on plant conditions, expecting a higher flow rate.
They also commented that "near run out" is a vague term.
Several expressed confusion since RCS pressure was already less than 325 psig and incapable of repressurization.
Additionally, the Applicants were unsure as to plant lineup

- 3 - status due to the "RWST dropping" slowly.

This could be due to a leak on the tank, ECCS

alignment, check valve problem, or containment spray alignment issue.

NRC Resolution of Question 9:
At WC, actual RHR flows in this configuration is not indicated on the RHR pump flow meters.
Additional RHR flow from operating the SIP's and CCP's in the piggy-back mode must be added to the RHR pump flow meters to obtain actual fl ow.
The RHR pump flows given in the stem was not realistic.
In addition, due to the Large Break LOCA in progress, there was no expectation of RCS pressure increasing to >325 psig.
Based on multiple confusing conditions given in the stem, the NRC Region IV staff agrees with this position and therefore this question was deleted from the written examination in accordance with
ES-403 D.1.b.
QUESTION 10
Given the following plant conditions:
  • PRT conditions are normal for 100% power
  • The Unit was operating at 100% power when the turbine tripped * The reactor failed to automatically trip but was manually tripped * All other systems operated as expected
  • The Emergency procedures have been performed and the plant stabilized
  • It was noted that on the transient RCS pressure reached 2370 psig Which ONE of the following represents the expected status of the PRT AND the actions that must be taken to restore it to normal limits?
A. PRT Pressure - 40 psig - High Vent excess pressure to the Gas Decay tanks.
B. PRT Pressure - 14 psig - High Recirc through the RCDT Hx and reduce pressure.
C. PRT Temperature - 220°F - High Recirc through the RCDT Hx and vent excess pressure to the Gas Decay tanks.
D. PRT Temperature - 220°F - High Add water to cool the tank and drain to the RCDT to maintain level.
Key Answer:
A
Licensee Comments for Question 10
Q10
The stem lacked some operational validity in that the PRT high temp would have been reached and the stem lacked info on the duration that the PORV was open.
Because the stem

did not provide all the necessary info, per

NUREG-1021 Section
ES-403 D.1.b, it should be deleted from the examination.
Request:
Delete Q10 from the exam.
It is acceptable per NUREG 1021; Section
ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the

necessary information.

- 4 -

Context:
Stem:
Post-examination feedback indicated that the Applicants could not discern the amount of time that the PORV was open from the stem conditions and could not determine the amount of mass and energy added to the PRT.
They expected the PRT to be in alarm for both pressure and temperature for any significant PORV operation.
They stated that there was not enough information to answer the question.
The amount of PORV cycling is dependent on the timing of the manual reactor trip relative to the turbine trip.
All that can be discerned from the stem is that the PORV cycled.
NRC Resolution of Question 10
The stem of the question did not provide operational validity.
Actual expected plant conditions should be given, not expect the applicants to determine plant conditions based on incomplete information.
Based on incomplete and confusing conditions given in the stem, the NRC Region IV staff agrees with this position and, therefore, this question was deleted from the written examination in accordance with
ES-403 D.1.b.
QUESTION 22
Given the following plant conditions:
  • A Large Break LOCA has occurred
  • All RCP's are stopped
  • ECCS and ESF systems functioned as designed * RCS pressure equals Containment pressure * The operating crew is ready to transition out of EMG E-0, REACTOR TRIP OR SAFETY
INJECTION
RCP #1 Seal Leakoff is . . .
A. NOT OCCURRING.
B. OCCURRING and flowing to the Pressurizer Relief Tank.
C. OCCURRING and flowing to the Reactor Coolant Drain Tank.
D. OCCURRING and flowing to the Volume Control Tank.
Key Answer:
B
Licensee Comments for Question 22
Q22
It is proposed to delete the question due to a stem that did not provide all the necessary information.
If seal flows are normal, then distractor 'A' is correct.
If seal flow is excessive, then answer 'B' is correct.
Both 'C' & 'D' are incorrect under all conditions.
Because answers 'A' &

'B' are mutually exclusive, deletion is recommended rather than accepting two answers.

Request:
Delete Q22 from the exam.
It is acceptable per NUREG 1021; section
ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the necessary information.
It is acceptable per NUREG 1021; section
ES-403 D.1.c to delete a question with two answers that are mutually exclusive.

- 5 -

Context:
Answer 'B' is that seal return is occurring and flowing to the PRT.
This is normally the case following
CIS-A with the RCS pressurized.
However, the stem indicates that a large break
LOCA is in progress with RCS equal to Containment pressure.
The relief valve to the PRT, BG-
21, lifts at 150 psig, which is unlikely unless seal injection flow is excessive.
Distractor 'A' is that seal return is not occurring.
Based on plant conditions in the stem, #1 seal leakoff is unlikely to be occurring.
Since the stem states that RCS and Containment pressure are matched, there is insufficient pressure to lift the relief.
Seal injection continues, but the flow is diverted to the low pressure RCS, especially since the #1 seal faces are likely closed.
The only way to provide enough backpressure to lift the relief is for seal injection flow to be so large that the thermal barrier labyrinth seals to provide the backpressure.
NRC Resolution of Question 22
The amount of seal injection flow following a Large Break LOCA determines whether or not seal leakoff is occurring.
This information was not given in the stem.
The possible correct answers are mutually exclusive, based on the assumption the applicant uses.
Based on not giving the value for seal injection in the stem, the NRC Region IV staff agrees with this position and, therefore, this question was deleted from the written examination in accordance with
ES-403
D.1.c.
QUESTION 33
Why is it worse for an Anticipated Transient Without Scram event to occur at low power at the Beginning Of Life (BOL) conditions?
A. The additional burnable poisons provide LESS heat conduction at lower power; therefore, the fuel pin outer clad temperatures are HIGHER.
B. The Power Coefficient is LESS NEGATIVE at lower power; therefore, it provides MINIMUM negative feedback.
C. The higher SG pressures at lower power remove heat from the RCS at a LOWER RATE; therefore, RCS temperatures RISE to a higher level.
D.
The high boron concentration causes the emergency boration to be LESS EFFECTIVE; therefore, taking a LONGER time to achieve adequate Shutdown Margin (SDM).
Key Answer:
B
Licensee Comments for Question 33
Q33 The stem is unclear.
The stem doesn't ask for the "principal" reason why an ATWS is worse at low power at BOL vs. EOL, thus answer 'D' could also be argued as correct.
Request:
Accept two correct answers fo

r Q33.

It is acceptable per NUREG 1021; Section
ES-403 D.1.c to accept two correct answers.

- 6 -

Context:
Answer 'B' is correct due to the small value of the power coefficient.
This is predominantly due to the moderator temperature coefficient (MTC) being only slightly negative or slightly positive under BOL conditions.
Therefore, the RCS heatup following turbine trip will not significantly reduce reactor power.
Distractor 'D' is that the higher boron concentration makes emergency boration less effective.
Although this is not the principal success path in EMG
FR-S1, RESPONSE TO NUCLEAR PWR GENERATION/ATWS, it is a secondary action to add negative reactivity that is always performed.
NRC Resolution of Question 33
There are multiple reasons why an ATWS is worse at low power BOL.
The stem did not ask for the major reason, leaving more than 1 correct reason.
NRC Region IV staff agrees that both B and D responses are correct and therefore both answer B and answer D are accepted for this question in accordance with
ES-403 D.1.c.
QUESTION 38
Given the following plant conditions:
  • The Unit has experienced a steamline break
Which ONE of the following describes the reason for performing Attachment B, Main Steam Header Isolation - Local?
A. Isolation of both steam supply lines to the TDAFP is allowed, regardless of the status of the other sources of feed flow to the SGs, since no secondary heat sink is intact.
B. To restore integrity to at least one SG in order to transition to EMG E-2, FAULTED STEAM GENERATOR ISOLATION, via the foldout page.
C. Valves are closed in any order to restore integrity to all SGs as early as possible.
D. The Operator is allowed to place the Condenser Steam Dump valves to CLOSE only if the selected valve is NOT accessible for local isolation.
Key Answer:
B
Licensee Comments for Question 38
Q38
It is proposed to delete this question due to an unclear stem.
EMG C-21 step 1 attempts to isolate one Steam Generator.
Attachment B is entered in response to the inability to isolate one Steam Generator and directs the Operator to isolate the Main Steam Header.

- 7 -

Request:
Delete Q38 from the exam.
It is acceptable per NUREG 1021; section
ES-403 D.1.b to delete a question with an unclear stem that confused the Applicant or did not provide all the necessary information.
Context:
Stem asks for an answer that is not supported by the background document.
There is no information in the background document of EMG C-21 to support the answer provided.
Performance of Attachment B will not result in one or more intact steam generators.
Other:
TNA 2013-1345-1, Condition Report
00072233 and Procedure Change Request 58807

were written.

NRC Resolution of Question 38
This question was written with the expectation that an attempt would be made in Attachment B to locally close the MSIV's.
Due to the replacem ent of WC MSIV's with a different model valve, there is no procedural step or method to locally close the MSIV's.
Based on there being no clear answer, the NRC Region IV staff agrees with this position and therefore this question was deleted from the written examination.
QUESTION 65
In addition to a Record Dose Dosimeter (RDD), which ONE of the following describes a
MINIMUM acceptable monitoring method for personnel entering a 'Locked High Radiation Area'?
A. A radiation monitoring device that continuously monitors the radiation dose rate in the area AND alarms when the dose rate alarm setpoint is reached.
B. Radiation monitoring device that continuously transmits dose rate AND cumulative dose to a remote receiver.
C. Self-reading dosimeter AND continuous surveillance by radiation protection, via a closed circuit television with a means of communication with each person in the area.
D. Self-reading dosimeter AND an operable area radiation monitor for the general area.
Key Answer:
C
Licensee Comments for Question 65
Q65 Distractor 'B' could also be argued as correct based on an unclear stem not based on actual plant practices.
Request:
Accept two correct answers fo

r Q65.

It is acceptable per NUREG 1021; Section
ES-403 D.1.c to accept two correct answers.

- 8 -

Context:
It is proposed that distractor 'B' should be accepted in addition to answer 'C' based on a question with an unclear stem that confused the Applicants based on actual plant practices.
Answer 'C' is correct in that a self-reading dosimeter and continuous surveillance by RP with a

means of communication.

The justification for distractor 'B' being incorrect was that it does not contain the reference to the device being monitored by Health Physics nor communications.
However these conditions are implied since the only remote monitoring system at Wolf Creek is Teledose, which reads out at the RADs camera console at Access Control, with various options for local communication

(radio, Gaitronics, etc.).

In order to obtain Teledose dosimetry, the RADs console operator must check it out to the individual.
The RADs console operator will not let the individual leave until it is verified that the device is communicating with the console and the means of field communication are established with the individual (radio, Gaitronics, or direct coverage by the
HP lead in the field.)
By simply obtaining the dosimetry, the field operator has met the requirements since the other requirements are part of that process.
NRC Resolution of Question 65
Actual plant practices for entry into a 'Locked High Radiation Area' are similar to response B, while the proposed answer C is described in procedure
AP 25A-200.
Due to the confusion to the applicants based on actual practice compared to procedural description,
NRC Region IV staff agrees that both B and C responses are correct and therefore both answer B and answer C are accepted for this question in accordance with
ES-403 D.1.c.