IR 05000220/2011001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 21: | Line 21: | ||
[[Issue date::March 5, 2012]] | [[Issue date::March 5, 2012]] | ||
Mr. Kenneth Langdon, Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 | Mr. Kenneth Langdon, Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63 | ||
Lycoming, NY 13093 | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR NINE MILE POINT NUCLEAR STATION UNITS 1 AND 2 (REPORT 05000220/2011001 AND 05000410/2011001) | SUBJECT: ANNUAL ASSESSMENT LETTER FOR NINE MILE POINT NUCLEAR STATION UNITS 1 AND 2 (REPORT 05000220/2011001 AND 05000410/2011001) | ||
Line 29: | Line 31: | ||
cycle performance review of Nine Mile Point Nuclear Station (NMPNS) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan. | cycle performance review of Nine Mile Point Nuclear Station (NMPNS) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan. | ||
The NRC determined that overall, NMPNS Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at NMPNS Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | The NRC determined that overall, NMPNS Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at NMPNS Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC | ||
=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspections, we plan on conducting Inspection Procedure 71004, "Power Uprate." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC=s | The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspections, we plan on conducting Inspection Procedure 71004, "Power Uprate." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC | ||
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at (610) 337-5233 with any questions you have regarding this letter. | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-220, 50-410 License Nos. DPR-63, NFP-69 | Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects | ||
Docket Nos. 50-220, 50-410 License Nos. DPR-63, NFP-69 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Nine Mile Point Inspection / Activity Plan cc w/ encl: Distribution via ListServ | Nine Mile Point Inspection / Activity Plan | ||
cc w/ encl: Distribution via ListServ | |||
ML12061A297 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME NPerry/via email GDentel DATE 02/28 /12 03/1/12 | |||
Page 1 of 2 03/01/2012 14:31:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 01/01/2012 | |||
-06/30/2013 11/7EXAM-NMP2 INITIAL OL EXAM 4 2 FY12-NMP2 INITIAL OPERATOR LICENSING EXAM U01841 02/20/2012 02/24/2012 2 FY12-NMP2 INITIAL OPERATOR LICENSING EXAM U01841 03/19/2012 03/30/2012 71124-RAD HAZARD ACCESS /ALARA 1 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 2 IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 7111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR 7111108G 04/16/2012 04/20/2012 IP 60854-ISFSI U1 CRANE INSPECTION FOR DNMS 1 1 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 04/10/2012 04/13/2012 71124-HP INSPECTION 01 02 03 04 1 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/23/2012 04/26/2012 2 IP Occupational ALARA Planning and Controls 71124.02 04/23/2012 04/26/2012 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/23/2012 04/26/2012 2 IP Occupational Dose Assessment 71124.04 04/23/2012 04/26/2012 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 9 1, 2 IP Fire Protection [Triennial] | |||
7111105T 06/04/2012 06/08/2012 1, 2 IP Fire Protection [Triennial] | |||
7111105T 06/18/2012 06/22/2012 ISFSI-ISFSI TESTING 1 1, 2 IP Operation Of An ISFSI 60855 06/01/2012 10/31/2012 71124-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/25/2012 06/29/2012 TI 182-DEGRADATION OF UNDERGROUND PIPING 1 1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/25/2012 06/29/2012 EP PROGR-EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing 7111402 07/16/2012 07/20/2012 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/16/2012 07/20/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/16/2012 07/20/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/16/2012 07/20/2012 71124-AIRBORNE RAD & DOSE ASSESSMENT 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/23/2012 07/26/2012 1 IP Occupational Dose Assessment 71124.04 07/23/2012 07/26/2012 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 03/01/2012 14:31:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 01/01/2012 | |||
-06/30/2013 71004-FAC INSP POWER UPRATE 1 1, 2 IP Power Uprate 71004 08/06/2012 08/10/2012 7111111B-NMP1 ON-SITE RQL INSP W/ P/F RESULTS 2 1 IP Licensed Operator Requalification Program 7111111B 11/12/2012 11/16/2012 71124-RAD MONT INSTRUMENTATION 1 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/24/2012 09/27/2012 71124-RAD EFFLUENT MONITOR TREATMENT PI & ISFS 1 1, 2 IP Operation Of An ISFSI 60855 11/26/2012 11/29/2012 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/26/2012 11/29/2012 1 IP Occupational Exposure Control Effectiveness 71151-OR01 11/26/2012 11/29/2012 2 IP RETS/ODCM Radiological Effluent 71151-PR01 11/26/2012 11/29/2012 11/12EXM-NMP1 INITIAL EXAM 4 1 FY13-NMP1 INITIAL OPERATOR LICENSING EXAM U01861 04/15/2013 04/19/2013 1 FY13-NMP1 INITIAL OPERATOR LICENSING EXAM U01861 05/13/2013 05/24/2013 71124-RAD HAZARD ACCESS/ALARA 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/25/2013 02/28/2013 1 IP Occupational ALARA Planning and Controls 71124.02 02/25/2013 02/28/2013 71124-HP INSPECTION IP 71124.01, .02, .03 &.04 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/01/2013 04/04/2013 1 IP Occupational ALARA Planning and Controls 71124.02 04/01/2013 04/04/2013 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/01/2013 04/04/2013 1 IP Occupational Dose Assessment 71124.04 04/01/2013 04/04/2013 7111108G-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR 7111108G 04/08/2013 04/12/2013 71124-RAD ENVIRONMENTAL MONITORING PROGRAM 1 1 IP Radiological Environmental Monitoring Program 71124.07 05/05/2013 05/10/2013 EP EX-EP EXERCISE EVALUATION 5 1, 2 IP Exercise Evaluation 7111401 06/17/2013 06/21/2013 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/17/2013 06/21/2013 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} |
Revision as of 04:16, 30 July 2018
ML12061A297 | |
Person / Time | |
---|---|
Site: | Nine Mile Point, Perry |
Issue date: | 03/05/2012 |
From: | Dentel G T Reactor Projects Branch 1 |
To: | Langdon K Nine Mile Point |
References | |
IR-11-001 | |
Download: ML12061A297 (5) | |
Text
March 5, 2012
Mr. Kenneth Langdon, Vice President Nine Mile Point Nuclear Station, LLC P.O. Box 63
Lycoming, NY 13093
SUBJECT: ANNUAL ASSESSMENT LETTER FOR NINE MILE POINT NUCLEAR STATION UNITS 1 AND 2 (REPORT 05000220/2011001 AND 05000410/2011001)
Dear Mr. Langdon:
On February 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
cycle performance review of Nine Mile Point Nuclear Station (NMPNS) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, NMPNS Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at NMPNS Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC
=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspections, we plan on conducting Inspection Procedure 71004, "Power Uprate." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5233 with any questions you have regarding this letter.
Sincerely,/RA/
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects
Docket Nos. 50-220, 50-410 License Nos. DPR-63, NFP-69
Enclosure:
Nine Mile Point Inspection / Activity Plan
cc w/ encl: Distribution via ListServ
ML12061A297 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME NPerry/via email GDentel DATE 02/28 /12 03/1/12
Page 1 of 2 03/01/2012 14:31:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 01/01/2012
-06/30/2013 11/7EXAM-NMP2 INITIAL OL EXAM 4 2 FY12-NMP2 INITIAL OPERATOR LICENSING EXAM U01841 02/20/2012 02/24/2012 2 FY12-NMP2 INITIAL OPERATOR LICENSING EXAM U01841 03/19/2012 03/30/2012 71124-RAD HAZARD ACCESS /ALARA 1 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 2 IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 7111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR 7111108G 04/16/2012 04/20/2012 IP 60854-ISFSI U1 CRANE INSPECTION FOR DNMS 1 1 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 04/10/2012 04/13/2012 71124-HP INSPECTION 01 02 03 04 1 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/23/2012 04/26/2012 2 IP Occupational ALARA Planning and Controls 71124.02 04/23/2012 04/26/2012 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/23/2012 04/26/2012 2 IP Occupational Dose Assessment 71124.04 04/23/2012 04/26/2012 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 9 1, 2 IP Fire Protection [Triennial]
7111105T 06/04/2012 06/08/2012 1, 2 IP Fire Protection [Triennial]
7111105T 06/18/2012 06/22/2012 ISFSI-ISFSI TESTING 1 1, 2 IP Operation Of An ISFSI 60855 06/01/2012 10/31/2012 71124-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/25/2012 06/29/2012 TI 182-DEGRADATION OF UNDERGROUND PIPING 1 1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/25/2012 06/29/2012 EP PROGR-EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing 7111402 07/16/2012 07/20/2012 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/16/2012 07/20/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/16/2012 07/20/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/16/2012 07/20/2012 71124-AIRBORNE RAD & DOSE ASSESSMENT 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/23/2012 07/26/2012 1 IP Occupational Dose Assessment 71124.04 07/23/2012 07/26/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 03/01/2012 14:31:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 01/01/2012
-06/30/2013 71004-FAC INSP POWER UPRATE 1 1, 2 IP Power Uprate 71004 08/06/2012 08/10/2012 7111111B-NMP1 ON-SITE RQL INSP W/ P/F RESULTS 2 1 IP Licensed Operator Requalification Program 7111111B 11/12/2012 11/16/2012 71124-RAD MONT INSTRUMENTATION 1 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/24/2012 09/27/2012 71124-RAD EFFLUENT MONITOR TREATMENT PI & ISFS 1 1, 2 IP Operation Of An ISFSI 60855 11/26/2012 11/29/2012 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/26/2012 11/29/2012 1 IP Occupational Exposure Control Effectiveness 71151-OR01 11/26/2012 11/29/2012 2 IP RETS/ODCM Radiological Effluent 71151-PR01 11/26/2012 11/29/2012 11/12EXM-NMP1 INITIAL EXAM 4 1 FY13-NMP1 INITIAL OPERATOR LICENSING EXAM U01861 04/15/2013 04/19/2013 1 FY13-NMP1 INITIAL OPERATOR LICENSING EXAM U01861 05/13/2013 05/24/2013 71124-RAD HAZARD ACCESS/ALARA 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/25/2013 02/28/2013 1 IP Occupational ALARA Planning and Controls 71124.02 02/25/2013 02/28/2013 71124-HP INSPECTION IP 71124.01, .02, .03 &.04 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/01/2013 04/04/2013 1 IP Occupational ALARA Planning and Controls 71124.02 04/01/2013 04/04/2013 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/01/2013 04/04/2013 1 IP Occupational Dose Assessment 71124.04 04/01/2013 04/04/2013 7111108G-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR 7111108G 04/08/2013 04/12/2013 71124-RAD ENVIRONMENTAL MONITORING PROGRAM 1 1 IP Radiological Environmental Monitoring Program 71124.07 05/05/2013 05/10/2013 EP EX-EP EXERCISE EVALUATION 5 1, 2 IP Exercise Evaluation 7111401 06/17/2013 06/21/2013 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/17/2013 06/21/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.