Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010
ML24088A192
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/28/2024
From: Lionel Rodriguez
NRC/RGN-III/DORS/RPB2
To: Penfield R
Energy Harbor Nuclear Corp
References
IR 2024010
Download: ML24088A192 (1)


See also: IR 05000440/2024010

Text

Rod Penfield

Site Vice President

Energy Harbor Nuclear Corp.

Perry Nuclear Power Plant

10 Center Road, P.O. Box 97

Perry, OH 44081

SUBJECT: PERRY NUCLEAR POWER PLANT - REQUEST FOR INFORMATION

FOR NRC LICENSE RENEWAL INSPECTION: INSPECTION REPORT

05000440/2024010

Dear Rod Penfield:

On July 15, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a license renewal

inspection at Perry Nuclear Power Plant. This inspection will be performed in accordance with

NRC Inspection Procedure 71002, License renewal Inspection.

The inspection will evaluate Perrys initial license renewal program plans and implementation to

ensure they are consistent with the requirements of Title 10 of the Code of Federal Regulations

(10 CFR), Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power

Plants, and Perrys license renewal application. The inspection will include an evaluation of

aging management programs that are planned or in place. The inspection will also include a

review of information and documentation required by 10 CFR 54.

The inspection will include 2 onsite weeks and will consist of 5-6 NRC inspectors (including the

lead inspector). The current inspection schedule is as follows:

  • Preparation week: July 8 - 12, 2024
  • Onsite weeks: Week 1: July 15 - 19, 2024

Week 2: July 29 - August 2, 2024

Experience with previous baseline inspections of similar depth and length has shown that this

type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee

staff. To minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for information.

It is important that all these documents are up-to-date and complete to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

  • The first group lists information necessary prior to the inspection. This information

should be provided to the lead inspector by May 27, 2024. March 28, 2024

R. Penfield 2

  • The second group of documents requested are those items needed to support our

in-office preparation activities. This set of documents should be provided to the lead

inspector by July 5, 2024. During the in-office preparation activities, the team may

identify additional information needed to support the inspection.

  • The third group includes supporting information to be provided throughout the onsite

inspection. Specifically, corrective action documents and answers to questions

developed during the inspection are requested to be provided as the documents are

generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

The lead inspector for this inspection is Lionel Rodriguez. We understand that our licensing

contact for this inspection is George Dujanovic of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9609 or via email at Lionel.Rodriguez@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Lionel Rodriguez

Senior Reactor Inspector

Engineering Branch 1

Division of Operating Reactor Safety

Docket No. 05000440

License No. NPF-58

Enclosure:

License Renewal Inspection

Request for Information

cc w/ encl: Distribution via LISTSERV

Signed by Rodriguez, Lionel

on 03/28/24

R. Penfield 3

Letter to Rod Penfield from Lionel Rodriguez dated March 28, 2024.

SUBJECT: PERRY NUCLEAR POWER PLANT - REQUEST FOR INFORMATION FOR

NRC LICENSE RENEWAL INSPECTION: INSPECTION REPORT

05000440/2024010

DISTRIBUTION:

Farrah Gaskins

RidsNrrPMPerry Resource

RidsNrrDorlLpl3

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

David Curtis

R3-DORS

ADAMS Accession Number: ML24088A192

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME LRodriguez:gmp

DATE 03/28/2024

OFFICIAL RECORD COPY

LICENSE RENEWAL INSPECTION

REQUEST FOR INFORMATION

I. ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number: 05000440/2024010

Onsite Inspection Dates: July 15 - 19, 2024 and July 29 - August 2, 2024

Inspection Procedure: IP 71002, License Renewal Inspection

Lionel Rodriguez, Senior Reactor Inspector

Lead Inspector: RIII/DORS/EB1

630-829-9609

Lionel.Rodriguez@nrc.gov

Kevin Barclay, Senior Reactor Inspector, RIII/DORS/EB1

Teammates: Ijaz Jesse Hafeez, Senior Reactor Inspector, RIII/DORS/EB2

Matthew Domke, Reactor Inspector, RIII/DORS/ERPB

Megan Gangewere, Reactor Inspector, RIII/DORS/EB1

II. INSPECTION LOGISTICS

Email the following inspection logistics to the lead inspector by July 5, 2024, or

sooner:

1. Inspection room name/number, directions from the main access facility, and

phone number;

2. Interview room name/number;

3. Response team contact information (names and phone numbers) and team roles

(e.g., management sponsor, lead, inspector counterpart);

4. Any site access/badging actions needed for each inspector;

5. Any dosimetry actions needed for each inspector;

6. Entrance meeting time and location;

7. Confirmation that the team will have access to a licensee computer

with a nearby printer;

8. Confirmation that the team will have Wi-Fi access;

9. Cafeteria location and hours;

10.Inspection response team normal working hours;

11.Any potential resource conflicts during the inspection (e.g., emergency

drills and all-staff meetings); and

12. Current management and engineering organizational chart.

Enclosure

INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions

regarding this information request. Provide the information electronically in pdf

files, Excel, or other searchable formats, preferably via an electronic sharing

service (CERTREC, ShareFile, Box, etc.). Specific Excel formats for various

enclosure items may be requested to assist in inspection sample selection. If you

do not have access to any of these services or similar, we can provide you

access to Box, which can be used to upload/download and share documents.

The files should contain descriptive names and be indexed and hyperlinked to

facilitate ease of use. Information in lists should contain enough information to

be easily understood by someone who has knowledge of light water reactor

technology.

1. Information Requested Prior to the Inspection (May 27, 2024)

The following information is requested by May 27, 2024.

1.1. The original License Renewal (LR) application and all amendments to

the application as of May 20, 2024.

1.2. All responses to NRC Requests for Information submitted as of May

20, 2024.

1.3. LR application development instructions (scoping and screening,

aging management reviews, operating experience reviews, etc.).

1.4. LR process instructions (developing aging management review report,

developing the aging management programs, working with the

database, etc.).

1.5. Listing of plant systems noting if the system has been screened in

scope or out of scope for LR.

1.6. For each Aging Management Program (AMP) and in-scope structure,

system, or component (SSC) provide:

1.6.1 LR scoping/boundary drawing(s);

1.6.2 program basis documents;

1.6.3 references specified in the AMP;

1.6.4 existing procedures (including draft procedures) implementing

the AMP;

1.6.5 a minimum of 10 years of operating experience related to the

AMP;

2

1.6.6 and identify the industry operating experience data bases (e.g.,

INPO, NRC generic communications, vendor notifications, etc.)

searched, and how these searches were conducted to identify

aging effects managed by the AMP.

1.7. Risk-Ranking of the top 500 components from your site-specific

probabilistic safety analysis (PSA) sorted by Birnbaum Worth. Include

values for Risk Achievement Worth, Risk-Reduction Worth, and

Fussell-Veseley. Please provide the ranking in an excel spreadsheet

that contains the importance measures and the description of the

basic event (e.g., not just the basic event designator).

1.8. Risk-ranking of the top 500 components (i.e., Large Early Release

Frequency (LERF)) from your site-specific PSA similar to the request in

item 1.5. (Provide in excel format.)

1.9. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical

Requirements Manual.

1.10. Plant system piping and instrumentation diagrams (P&IDs).

1.11. Electronic copies of simplified plant drawings (if available). Note: these

may be uncontrolled documents such as big notes, training diagrams,

etc.

1.12. Any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

2. Information Requested for In-Office Preparation Activities (July 5, 2024)

The following information is requested by July 5, 2024, to facilitate inspection

preparation.

2.1. As a follow-up to item 1.1 above, provide a copy of all amendments

(if any) to your LR Application submitted after May 20, 2024.

2.2. As a follow-up to item 1.2 above, provide a copy of all responses

(if any) to NRC Requests for Information submitted after May 20,

2024.

2.3. Updates (if any) to the information previously provided in items 1.5 and 1.6

above.

2.4. Provide a list of contact information of individuals responsible for each AMP.

3. Information Requested to be Provided Throughout the Inspection:

3.1. Any corrective action documents generated as a result of the teams

questions during this inspection as the documents are generated.

3

3.2. List of questions and/or document requests submitted by the team and

their status (e.g., open, closed) sorted by inspector. Provide daily by

2:00 p.m. to each inspector. It is recommended to provide the lead

inspector with a master list sorted by inspector and each inspector with

a list containing only the items originated by that inspector.

If you have questions regarding the information requested, please contact the lead inspector.

4