Notification of Conduct of a Fire Protection Team Inspection
ML21088A268
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/30/2021
From: Glenn Dentel
Division of Reactor Safety I
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
Download: ML21088A268 (7)


Text

[Type here]

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 30, 2021 Mr. David P. Rhoades Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

NINE MILE POINT NUCLEAR STATION - NOTIFICATION OF CONDUCT OF A FIRE PROTECTION TEAM INSPECTION

Dear Mr. Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct a fire protection team inspection at your Nine Mile Point Nuclear Station, starting in July 2021. The inspection will be conducted in accordance with Inspection Procedure 71111 Attachment 21N.05, Fire Protection Team Inspection (FPTI), dated June 12, 2019. The inspection team will be led by Ms. Carey Bickett, a Senior Reactor Inspector from the NRC Region I Office.

The inspection will verify that plant structures, systems, and components, and/or administrative controls credited in the approved fire protection program can perform their licensing basis function.

The schedule for the inspection is as follows:

  • Information Gathering Visit: July 13 - 15, 2021
  • Onsite Inspection: Weeks of July 26, 2021 and August 9, 2021 The purpose of the information gathering visit is to obtain information and documentation needed to support the inspection and to become familiar with the stations fire protection program, fire protection features, post-fire safe shutdown capabilities, and plant layout. During the information gathering visit, the team leader will select the specific samples to be reviewed during the inspection weeks. The information gathering visit may be conducted remotely due to the pandemic situation.

The enclosure lists the types of documents that will be needed prior to the information gathering visit. Please provide the referenced information to the Region I office by July 2, 2021.

Following sample selection, additional documents will be requested specific to those samples.

Your cooperation and support during this inspection will be appreciated.

If you have questions concerning this inspection, or the inspection team's information request or logistical needs, please contact Ms. Carey Bickett, Team Leader at (610) 337-5317, or via e-mail at carey.bickett@nrc.gov.

D. Rhoades 2 This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, X /RA/

Signed by: Glenn T. Dentel Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and NPF-69

Enclosure:

Fire Protection Team Inspection Supporting Documentation cc: Distribution via LISTSERV

ML21088A268 Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS NAME CBickett/cab GDentel DATE 3/29/21 3/30/21 Fire Protection Team Inspection Supporting Documentation If you have any questions regarding this information request, please contact Ms. Carey Bickett at (610) 337-5317 or via e-mail at carey.bickett@nrc.gov.

Electronic format is preferred. If electronic media is made available via an internet-based document management system, then document access must allow inspectors to download, save, and print the documents in the NRC's Regional office. Additionally, word-searchable documents are preferred, if available. Paper records (hard copy) are acceptable. At the end of the inspection, the documents in the teams possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such, this generic document request is not meant to imply that any specific plant is required to have all the listed documents. It is recognized that some documents listed below may not be available for your plant. In addition, the document titles listed below are based on typical industry document names; your plant specific document titles may vary.

Note that following sample selection, additional documents will be requested specific to those samples.

Please provide these documents to the inspection team leader in the Region I Office by July 2, 2021:

Nine Mile Point Unit 1

1. Copy of the Nuclear Safety Capability Assessment
2. Copy of the Fire Hazards Analysis Report and/or NFPA 805 Design Basis Document
3. Copy of the Fire Probabilistic Risk Assessment (Fire PRA) summary document, or full PRA document if summary is not available
4. Copy of the NFPA 805 transition report, developed in accordance with NEI 04-02
5. Post-Fire Human Reliability Assessment calculation
6. Copy of any plant change evaluations completed since July 2018 (NFPA 805 Section 2.4.4)
7. Copy of any fire protection engineering equivalency evaluations completed since July 2018.

(NFPA 805 Section 2.2.7)

8. Copy of any other fire protection program design basis documents, if available
9. List of Unit 1 change packages associated with any fire protection system, fire protection program, safe shutdown system, or nuclear safety capability modifications completed since July 2018. Include a short description and/or title of each change.
10. List of all Unit 1 fire protection system impact screening reviews for any design changes, modifications, or temporary modifications completed since July 2018 (e.g., LS-AA-128 review, etc.). Include a short description and/or title of each review.

Enclosure

11. List of current Unit 1 fire protection system impairments, including description
12. List of Unit 1 recovery actions and associated program procedure for validation of recovery actions, if not included above
13. Thermal-hydraulic calculation or analysis that determines the time requirements for time-critical operator actions and/or recovery actions, if not included above
14. Copy of the Unit 1 Updated Final Safety Analysis Report (sections associated with fire protection at a minimum)
15. Copy of the Unit 1 Technical Requirements Manual (sections associated with fire protection as a minimum)
16. Copy of station procedures used for fire safe shutdown from inside and outside of the Unit 1 control room (e.g., alarm response procedure, procedure for shutdown from the remote shutdown panel, etc.)
17. Copy of basis documents for the procedures in Item 16, if available.
18. List of open and closed Unit 1 issue reports related to post-fire safe shutdown or alternative shutdown issues on since July 2018 (e.g., issues affecting safe shutdown analysis, fire hazards analysis, safe shutdown operating procedures and/or training, timeline evaluations for operator actions, etc.). Include the issue report number and a brief description.
19. List of open and closed Unit 1 issue reports for fire protection system issues (e.g., fire pumps, detection, suppression, etc.) since July 2018. Include the issue report number and a brief description.
20. List of open and closed Unit 1 issue reports related to the fire brigade or fire drills since July 2018. Include the issue report number and a brief description.
21. Copies of Unit 1 procedures, work orders, preventive maintenance tasks, or other documents which implement the commitments made as part of the Unit 1 license extension related to fire protection.

Nine Mile Point Unit 2

22. Post-Fire Safe Shutdown or Alternative Shutdown Analysis
23. List of post-fire safe shutdown components (i.e., safe shutdown equipment list), if not already included in item (1) above
24. Unit 2 Fire Hazards Analysis Report
25. Fire Probabilistic Risk Assessment (Fire PRA) Summary Document for Unit 2. If a Fire PRA is not available, please provide the Individual Plant Examination for External Events (Fire Chapter Only)
26. Unit 2 Fire Protection Design Basis Document(s), if available Enclosure
27. List of all Unit 2 fire protection system impact screening reviews for any design changes, modifications, or temporary modifications completed since July 2018 (e.g., a Generic Letter 86-10 review, LS-AA-128 review, etc.). Include a short description and/or title of each review.
28. List of Unit 2 fire protection system, post-fire safe shutdown, or alternative shutdown design changes completed since July 2018. Include a short description and/or title of each change.
29. List of all Unit 2 Generic Letter 86-10 evaluations completed since July 2018. Include a short description and/or title of each evaluation.
30. List of the top 25 highest fire CDF scenarios, if available.
31. List of current Unit 2 fire protection system impairments, including description
32. List of Unit 2 time-critical operator actions and associated program procedure
33. Thermal-hydraulic calculation or analysis that determined the time requirements for Unit 2 time-critical operator actions
34. Copy of the Unit 2 Updated Final Safety Analysis Report (sections associated with fire protection as a minimum)
35. Copy of the Unit 2 Technical Requirements Manual (sections associated with fire protection as a minimum)
36. Copy of station procedures used for fire safe shutdown from inside and outside of the Unit 2 control room (e.g., alarm response procedure, procedure for shutdown from the remote shutdown panel, etc.)
37. Copy of basis documents for the procedures in Item 36, if available.
38. List of open and closed Unit 2 issue reports for post-fire safe shutdown or alternative shutdown issues since July 2018 (e.g., issues affecting safe shutdown analysis, fire hazards analysis, safe shutdown operating procedures and/or training, timeline evaluations for operator actions, etc.). Include the issue report number and a brief description.
39. List of open and closed Unit 2 issue reports for fire protection system issues (e.g., fire pumps, detection, suppression, etc.) since July 2018. Include the issue report number and a brief description.
40. List of open and closed Unit 2 issue reports related to the fire brigade or fire drills since July 2018. Include the issue report number and a brief description.

Common Documents

41. Fire Protection Program and/or Fire Protection Plan Document(s), if not already included above. If these documents are unit-specific, please provide documents for both units.

Enclosure

42. Fire Protection Program implementing procedures, if not already included above. This could include procedures for programs such as transient combustible controls, hot work, changes to the fire protection program, etc. If these procedures are unit-specific, please provide procedures for both units.
43. Copies of any fire protection-related self-assessments or audits performed since July 2018.
44. Copies of the following issue reports:

4168498 4172933 4177242 4177602 4171603 4173143 4177243 4177679 4172378 4173174 4177301 4177717 4172682 4173216 4177325 4177730 4172929 4177236 4177360 4177789

45. Copy of the Corrective Action Program Procedure(s)

Enclosure