August 31, 2022
SUBJECT:
UPDATED INSPECTION PLAN FOR NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 (REPORTS 05000220/2022005 AND 05000410/2022005)
Dear David Rhoades:
The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Nine Mile Point Nuclear Station, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI)1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management2.
In response to the COVID19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-
1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.
2 The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. specific conditions, and it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.3
For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5120 with any questions you have regarding this letter.
Sincerely, Erin E. Carfang, Chief Projects Branch 1 Division of Operating Reactor Safety
Docket Nos.
05000220 and 05000410 License Nos. DPR-63 and NPF-69
Enclosure:
Nine Mile Point Inspection Plan
cc w/encl: Distribution via ListServ
3This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021.
Erin E.
Carfang Digitally signed by Erin E.
Carfang Date: 2022.08.31 08:56:07 -04'00'
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME SHaney ECarfang
DATE 08/30/22 08/30/22
Site Inspection Activity Plan Nine Mile Point 07/01/2022 - 06/30/2024 Unit Start End Activity CAC Title Staff Count EP PROGRAM INSPECTION - NINE MILE POINT
1,2 8/8/2022 8/12/2022 IP 71114.02 000717 Alert and Notification System Testing 1,2 8/8/2022 8/12/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 8/8/2022 8/12/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/8/2022 8/12/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 8/8/2022 8/12/2022 IP 71151 001397 Performance Indicator Verification Access Auth, Access Control, FFD, SPR, PI-NMP
1,2 8/8/2022 8/10/2022 IP 71130.01 000733 Access Authorization 1,2 8/8/2022 8/10/2022 IP 71130.02 000734 Access Control 1,2 8/8/2022 8/10/2022 IP 71130.08 000740 Fitness For Duty Program 1,2 8/8/2022 8/10/2022 IP 71130.09 001656 Security Plan Changes 1,2 8/8/2022 8/10/2022 IP 71151 001338 Performance Indicator Verification Design Basis Assurance Inspection - Power Operated Valves - Nine Mile Point Units 1 and 2
1,2 10/17/2022 10/21/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1,2 10/31/2022 11/4/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements NMP1 Requal Inspection with P/F Results
1 11/14/2022 11/18/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
11/14/2022 11/18/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP Performance Indicators
1,2 12/7/2022 12/8/2022 IP 71151 000746 Performance Indicator Verification FY23 NMP1 Initial Licensing Examination
1 12/11/2022 12/16/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1/29/2023 2/10/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
RP In-Plant Airborne / Occ. Dose Control 71124.03/.04
1,2 1/30/2023 2/3/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 1/30/2023 2/3/2023 IP 71124.04 000728 Occupational Dose Assessment RP Rad Instrumentation 71124.05
1,2 2/20/2023 2/24/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation Inservice Inspection - NMP Unit 1
1 3/20/2023 3/24/2023 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
RP Rad Hazard Assessment and Control 71124.01
Prepared on 8/24/2022 2:55:46 PM 1 of 3 Enclosure
Site Inspection Activity Plan 1,2 3/20/2023 3/24/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls FY23 NMP2 Initial License Examination
2 3/19/2023 3/24/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
4/16/2023 4/28/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
1,2 5/8/2023 5/12/2023 IP 71152B 000747 Problem Identification and Resolution 1,2 5/22/2023 5/26/2023 IP 71152B 000747 Problem Identification and Resolution Cyber Security - Nine Mile Point
1,2 6/12/2023 6/16/2023 IP 71130.10 000741 Cybersecurity RP Radwaste and Transportation 71124.08
1,2 8/7/2023 8/11/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation FORCE-ON-FORCE PLANNING AND EXERCISE - NMP
1,2 8/28/2023 9/1/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 9/25/2023 9/29/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Comprehensive Engineering Team Inspection - Nine Mile Point Unit 1 and 2
1,2 9/11/2023 9/15/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1,2 9/25/2023 9/29/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1,2 10/2/2023 10/6/2023 IP 71114.01 000716 Exercise Evaluation 1,2 10/2/2023 10/6/2023 IP 71151 001397 Performance Indicator Verification Nine Mile Point 2 Requal Inspection with P/F Results
2 10/29/2023 11/3/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
10/29/2023 11/3/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance FY24 NMP2 Initial License Examination
2 10/8/2023 10/13/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
11/5/2023 11/10/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Access Control, Equipment, Sec Trng, Sec Plan Review, PI-NMP
1,2 11/13/2023 11/17/2023 IP 71130.02 000734 Access Control 1,2 11/13/2023 11/17/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 11/13/2023 11/17/2023 IP 71130.07 000739 Security Training 1,2 11/13/2023 11/17/2023 IP 71130.09 001656 Security Plan Changes 1,2 11/13/2023 11/17/2023 IP 71151 001338 Performance Indicator Verification RP Perf Ind Verification 71151
1,2 12/11/2023 12/15/2023 IP 71151 000746 Performance Indicator Verification Prepared on 8/24/2022 2:55:46 PM 2 of 3
Site Inspection Activity Plan Inservice Inspection - Nine Mile Point Unit 2
2 3/11/2024 3/15/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1,2 3/11/2024 3/15/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Material Control and Accounting - Nine Mile Point
1,2 5/13/2024 5/17/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)
Focused Engineering Inspection - Aging Related
1,2 6/10/2024 6/14/2024 IP 71111.21N.04 Age Related Focused Engineering Inspection 1,2 6/24/2024 6/28/2024 IP 71111.21N.04 Age Related Focused Engineering Inspection Prepared on 8/24/2022 2:55:46 PM 3 of 3