{{#Wiki_filter:MISCELLANEOUS CORRESPONDENCE FOR THE DRESDEN INITIAL EXAM - MARCH 2008 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 February 27,2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555  
{{#Wiki_filter:MISCELLANEOUS CORRESPONDENCE
                            -
FOR THE DRESDEN INITIAL EXAM MARCH 2008
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 February 27,2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555


==SUBJECT:==
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION OPERATOR LICENSING EXAMINATION APPROVAL  
DRESDEN NUCLEAR POWER STATION OPERATOR LICENSING EXAMINATION APPROVAL


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Dresden Nuclear Power Station. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. George Graff, Training Director.
Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the weeks of March 3 and 10, 2008. The NRC staff will administer the operating tests during the week of March 3 and 10, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-I021 for content, operational, and discrimination validity.
By administering this examination, you also agree that it meets NUREG-I021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility.
If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.
Please contact your Chief Examiner, Mr. Dell R. McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. 


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htttx//www.nrc.oov/readinQ-rm/adams.html.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Dresden Nuclear Power Station.
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. George Graff, Training Director. Note that any examination waivers and application denials have been addressed in separate correspondence.
DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.aov/readina-rm/adams.html.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the weeks of March 3 and 10, 2008. The NRC staff will administer the operating tests during the week of March 3 and 10, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-I021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-I021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos.
Please contact your Chief Examiner, Mr. Dell R. McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\DRE 02-08 DRS OL exam approval.doc Publicly Available Non-Publicly Available 0 Sensitive 0 Non-Sensitive OFFICIAL RECORD COPY In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.aov/readina-rm/adams.html.
 
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department DOCUMENT NAME: G:\DRS\Work in Progress\DRE 02-08 DRS OL exam approval.doc Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive OFFICIAL RECORD COPY Letter to Charles G. Pardee from Hironori Peterson dated February 27, 2008.  
C. Pardee                                      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htttx//www.nrc.oov/readinQ-rm/adams.html.
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc:   Site Vice President - Dresden Nuclear Power Station
                        -
Plant Manager Dresden Nuclear Power Station RegulatoryAssurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and RegulatoryAffairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department
 
C. Pardee                                      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.aov/readina-rm/adams.html.
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237;50-249 License Nos. DPR-19; DPR-25 cc:     Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\DRE 02-08 DRS OL exam approval.doc Publicly Available       Non-PubliclyAvailable    0 Sensitive 0 Non-Sensitive OFFICIAL RECORD COPY
 
C. Pardee                                        In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.aov/readina-rm/adams.html.
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc:     Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department DOCUMENT NAME: G:\DRS\Work in Progress\DRE 02-08 DRS OL exam approval.doc PubliclyAvailable    0 Non-Publicly Available     0 Sensitive 0 Non-Sensitive OFFICIAL RECORD COPY
 
Letter to Charles G. Pardee from Hironori Peterson dated February 27, 2008.


==SUBJECT:==
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION OPERATOR LICENSING EXAMINATION APPROVAL ADAMS Distribution:
DRESDEN NUCLEAR POWER STATION OPERATOR LICENSING EXAMINATIONAPPROVAL ADAMS Distribution:
TEB RAG1 CXG 1 RidsNrrDirslrib MAS KGO JKH3 CJP3 CAAI DRPlll DRSlll PLBI TXN NLS UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 December 3,2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555  
TEB RAG1 CXG1 RidsNrrDirslrib MAS KGO JKH3 CJP3 CAAI DRPlll DRSlll PLBI TXN NLS
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 December 3,2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555


==Dear Mr. Crane:==
==Dear Mr. Crane:==
In a telephone conversation on November 16,2007, between Mr. F. Ferrero, Senior Instructor, and Mr. Dell McNeil, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Dresden Nuclear Power Station the weeks of March 3 and March 10, 2007.
 
In addition, the NRC will make an examination validation visit to your facility the week of February 11,2007.
In a telephone conversation on November 16,2007, between Mr. F. Ferrero, Senior Instructor, and Mr. Dell McNeil, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Dresden Nuclear Power Station the weeks of March 3 and March 10, 2007. In addition, the NRC will make an examination validation visit to your facility the week of February 11,2007.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it was necessary for your staff to furnish the examination outlines by October 22, 2007. Your staff has already provided the examination outlines.
To meet the above schedule, it was necessary for your staff to furnish the examination outlines by October 22, 2007. Your staff has already provided the examination outlines. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due during the week of January 7,2007. Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations ( I O CFR 55..40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due during the week of January 7,2007. Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations (IO CFR 55..40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.
Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C.
 
3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53). US. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-001 8), Office of Management and Budget, Washington, D.C. 20503-0001.
C. Crane                                        (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Thank you for your cooperation in this matter. Mr. Ferrero has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Dell McNeil at 630-829-9737, or me at 630-829-9707.
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.qov/readina-rm/adams.html (the Public Electronic Reading Room). V Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 DISTRIBUTION See next page (OMB) approval number 31 50-0090), medical certifications (OMB approval number 31 50-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Papenvork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), US. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018).
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53). US. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-001 8), Office of Management and Budget, Washington, D.C. 20503-0001.
Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Thank you for your cooperation in this matter. Mr. Ferrero has been advised of the policies and guidelines referenced in this letter.
Thank you for your cooperation in this matter. Mr. Ferrero has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Dell McNeil at 630-829-9737, or me at 630-829-9707.
If you have any questions regarding the NRC's examination procedures and guidelines, please contact Dell McNeil at 630-829-9737, or me at 630-829-9707.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.qov/readina-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.aov/readina-rm/adams.html (the Public Electronic Reading Room).
V Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 DISTRIBUTION See next page
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 DISTRIBUTION See next page DOCUMENT NAME: G:\OL BPS\RevSLtr 1 bps.wpd 0 Publicly Available 0 Non-Publicly Available Sensitive 0 Non-Sensitive To recelve a coovof this document. Indicate In the concurrence box "C" = Coovwlthout attach/encl "E" = Coov Letter to Christopher M. Crane from Hironori Peterson dated December 3.2007.  
 
C. Crane                                            (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Papenvork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), US. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018). Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Ferrero has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Dell McNeil at 630-829-9737, or me at 630-829-9707.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.aov/readina-rm/adams.html(the Public Electronic Reading Room).
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 DISTRIBUTION See next page DOCUMENT NAME: G:\OL BPS\RevSLtr 1 bps.wpd 0 Publicly Available     0 Non-Publicly Available   Sensitive   0 Non-Sensitive To recelve a coovof this document. Indicate In the concurrence box "C" = Coovwlthout attach/encl "E" = Coov
 
Letter to Christopher M. Crane from Hironori Peterson dated December 3.2007.


==SUBJECT:==
==SUBJECT:==
ARRANGEMENTS FOR THE ADMINISTRATION OF LICENSING EXAMINATIONS AT DRESDEN NUCLEAR POWER STATION cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatoly Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. Symonds, Training Department Operating Group Operating Group Operating Group Letter to Christopher M. Crane from Hironori Peterson dated December 3, 2007.  
ARRANGEMENTS FOR THE ADMINISTRATION OF LICENSING EXAMINATIONS AT DRESDEN NUCLEAR POWER STATION cc:     Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatoly Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services
                              -
Senior Vice President Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. Symonds, Training Department
 
Letter to Christopher M. Crane from Hironori Peterson dated December 3, 2007.


==SUBJECT:==
==SUBJECT:==
ARRANGEMENTS FOR THE ADMINISTRATION OF LICENSING EXAMINATIONS AT DRESDEN NUCLEAR POWER STATION cc w/encl:
ARRANGEMENTS FOR THE ADMINISTRATION OF LICENSING EXAMINATIONSAT DRESDEN NUCLEAR POWER STATION cc w/encl:                         -
Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. Symonds, Training Department Operating Group Operating Group Operating Group DISTRIBUTION:
Site Vice President Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager RegulatoryAssurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group
TEB RAG 1 JFWI MMT RidsNrrDirslrib MAS KGO JKH3 CJP3 CAAl DRPlll DRSlll PLBl TXN NLS
                                    -
Manager Licensing Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. Symonds, Training Department DISTRIBUTION:
TEB RAG1 JFWI MMT RidsNrrDirslrib MAS KGO JKH3 CJP3 CAAl DRPlll DRSlll PLBl TXN NLS


August 13,2007 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289  
August 13,2007 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289


==Subject:==
==Subject:==
Response to NRC Regulatory Issue Summary 2007-17 "Preparation and Scheduling of Operator Licensing Examinations"  
Response to NRC Regulatory Issue Summary 2007-17 "Preparation and Scheduling of Operator Licensing Examinations"


==Reference:==
==Reference:==
NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations," dated July 12,2007 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested in operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 2011. Attachments 1 through 10 provide responses to RIS 2007-17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
In calendar year 2009, 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual site examinationthat involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where necessary.
The operator licensing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818.
Respectfully, Darin M. Benyak            I Director - Licensing and Regulatory Affairs
August 13,2007 U. S. Nuclear Regulatory Commission Page 3  - Completed NRC Form 536 for Braidwood Station  -Completed NAC Form 536 for Byron Station  - Completed NRC Form 536 for Clinton Power Station  -Completed NRC Form 536 for Dresden Nuclear Power Station  -Completed NRC Form 536 for LaSalle County Station  -Completed NAC Form 536 for Limerick Generating Station  - Completed NRC Form 536 for Oyster Creek Generating Station  - Completed NAC Form 536 for Peach Bottom Atomic Power Station  - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1
Response to RIS 2007-17                                                                            Attachment 1 Page 1 of 1 OPERATOR LICENSING EXAMINATION DATA Braidwood Station, Units 1 and 2                                            111 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 I
A. PROPOSED E X M N A T I O N PREPARATION SCHEDULE PROPOSED NUMBER                  CY=            CY              CY a            CY 2011 ESTIMATED NUMBER OF UCENSEE-PREPARED                  0              1              0                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0              0              0                0 EXAMINATIONS PROPOSED NUMBER                  CY 2008        CY  =          CY-              CY I1        NUMBER OF REACTOR OPERATORS I      0        I      1 I            0        l        6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OFSENIOR REACTOR I        0    1    1      3    1      0      I      l2 OPERATORS-UPGRADE                  0              1              0                2 NUMBEROFSENIOR REAClOR OPERATORS-LlhltlED                0              0                0                0 I          PROWEDDATES              I                I              I PRIMARY DATE            I                                                1    414/2011 ALTERNATE DATE                                10/19/09                        511W011 PROPOSED                        C Y m                                    cy azQ NUMBER      MARCH        JUNE    SEPTEMBER DECEMBER    MARCH      JUNE    SEPTEMBER  DECEMBER ESTIMAlED NUMBEROF        0          14          0        0          0        0          0            18 CANDIDATES
Response to RIS 2007-17                                                                                  Attachment 2 Page 1 of 1 11,s NUCLEAR REGULATORY COMMISSION FACILIT)                                                                                    NRC REGION Byron Station, Units 1 and 2                                                        I11 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 PROPOSED NUMBER                      cy rn                CY=        C Y D            C Y U ESTIMATEDNUMBEROF LICENSEEPREPARED                      0                  0            1                  1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS I
I 1          I I
o    I I
0        I I
o B. INITIAL OPERATOR LICENSE EXAMINATIONS NUMBER OF REACTOR OPERATORS                          8                  0            8                5 NUMBER OF SENIOR REACTOR OPUUTORS-LNSTANT                        5                  0            6                7 NUMBER OFSENIOR REACTOR OPERATORS-UPGRADE NUMBEROFSENIOR REACTOR I          i        I        O    I      '      I          O OPERATORS-LIMlTED                      0                  0            0                0 PROPOSED DATES PRIMARY DATF                    5/19/2008                        6/20/2010          8/7/2011 ALTERNATE DAI            I    5/26/2008      1              I 06/27/2010    I    8/14/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cy2008                                          CY a MARCH      JUNE          SEPTEMBER    DECEMBER      MARCH  JUNE    SEmEMBER      DECEMBER ESTIMATED NUMBEROF          0          0              0            0          14      0          0              0 XNDIDATES
Response to RIS 2007-17                                                                    Atlachment 3 Page 1 of 1 PROPOSED NUMBER                -2ePB          CY  a        CY  a          CY 2911 FSTIMATU) NUMBER OF LICENSEEPREPARED                  0              1              0              1 EXAMINATIONS STMATED NUMBER OF NRC-PREPARED                  0              0              0              0 EXAMINATIONS NUMBER OF REACTOR OPERATORS            I        O      I                      0      I      6 NUMBEROFSENIOR REACTOR OPERATORS-INSTANT        I        O      I      3      l      0 NUMBER OFSENlOR REACTOR OPERATORS-UPORADE                  0              3              0              3 NUMBER OFSENIOR REACTOR OPERATORS-LIMITED                0              0              0              0 PROPOSED DATES          I                I              I              I PRMARY DATE                            I  8/24/2009  I              I  8/22/2011 ALTERNATE DATE                          I  8/17/2009  I              I  6/29/2011 PROPOSED a2008                                  CY NUMBER      MARCH      JUNE    SEPTEMBER DECEMBER    MARCH    JUNE    SEPTEMBER  DECEMBER FSTIMAED NUMBER OF      0          9          0      0          0      0          0          0 CANDIDAIES
Response to RIS 2007-17                                                                        Attachment 5 Page 1 of 1 OPERATOR LICENSING EXAMINATION DATA FACILITY                                                                          NRC REGION LaSalle County Station, Units 1 and 2                                      111 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 PROPOSED NUMBER                  CY=              CY 2Qe9    CY2p19          CY 21211 ESTIMATED NUMBER OF UCENSEEPREPARED                    1              0            1                0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARE0                    0                0            0                0 EXAMINATIONS NUMBER OF REACTOR OPERATORS                      4              0            4                0 I      NUMBER OFSENIOR R E A m R OPERATORS-INSTANT        I                                              I        o NUMBEROFSENIOR RF.ACIDR OPERATORS-UffiRADE                0              0            2                0 NUMBER OF SENIOR REACTOR OPERATORSLLMmD                    0              0            0                0 PROPOSED DATES PRIMARY D A E              8/18/2008                    9/14/2010 ALTERNATE DATE        I    8/25/2008    I            I 9/21/2010    I cy m                                    CY PROPOSED NUMBER      MARCH      JUNE    SEPTEMBER  DECEMBER    MARCH  JUNE    SEFIEMBER    DECEMBER ESTIMATED NUMBER OF      0          0          0          0          0      12        0              0 CANDIDATES
Response to RIS 2007-17                                                                        Attachment 6 Page 1 of 1 Limerick Generating Station, Units 1 and 2                                I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 PROPOSED NUMBER                CY=            CY            C Y U          CY I 1 l o ESTIMATED NUMBER OF LICENSEEPREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  1                0            0              0 EXAMINATIONS PROPOSED NUMBER                CY a            CY            CY=              C Y U NUMBER OF REACTOR OPERATORS                    3                0            9              0 NUMBER OFSENlORREACrOR OPERATORS-INSTANT I 1 l I o l g l o NUMBER OF SENIOR RWCrOR OPERATORS-UFCRADE        I        2      1        0      I      1      I      o NUMBER OFSENIOR REACTOR 0                "            0              0 OPERATORS-LIM-PROPOSED DATES PRIMARY DATE              10l20l2000                    1Ol04l2010        NIA ALTERNATE DATE              1Ol27l2000            .        1011w2010          NIA CY g!Qg                                  cy 2m PROPOSED NUMBER      MARCH    I  JUNE    SEPTEMBER  DECEMBER    MARCH    JUNE    SEmEUBER  DECEMBER ESTIMATED NUMBEROF        0          0          0          0          0      10        0            0 XNDIDAIES
Response to RIS 2007-17                                                                Attachment 7 Page 1 of 1 FACILITY                                                                  NRCRECION Oyster Creek Generating Station                                  I Facility Operating License No. DPR-16 NRC Docket No. 50-219 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER NRC-PREPARE NUMBEROFREAClOR PRIMARY DATE ALTERNATE DATE PROWED                          CY                                cy m NliMBER      MARCH  I  JUNE    SEPTEMBER  DECEMBER MARCH JUNE  SEPTEMBER  DECEMBER ESnUATED NUMBEROF      16          0          0        0      16    0        0          16 CANDDATES
Response to RIS 2007-17                                                                            Attachment 8 Page 1 of 1 FACILITY                                                                              NRCRECION Peach Bottom Atomic Power Station, Units 2 and 3                              I Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                  cum              cum            C Y W            cum ESTIMATED NUMBER OF LICENSEE-PREPARED                  1          1 and 1 LSRO          1                0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                0              0                0 EXAMINATIONS NUMBER OPERATORS OF REACTOR        l        4      l        0      l      4 I        0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT                  9                7              10                0 NUMBER OF SENIOR REACTOR OPERATORS-UFGRADE                  2                2              2                0 NUMBER OFSENIOR REACTOR OPERATORS-LlMflED        l        o        1        6      1      0        1        0 PROPOSED DATE5 12/7/2009 PRIMARY DATE                                                12/6/2010 12/6/2008    7/27/2009 .LSRO ALTERNATE DATE              12/15/2008      12/1412009    12/1w2010 CY gQQ@                                    CY PROPOSED ,
m&lBER MARCH            JUNE    SEPTEMBER  DECEMBER    MARCH    JUNE    SEFTEMBUI  DECEMBER ESTLMATED NUMBER OF      0          0          7        0            0        0          14          0 CANDIDATES


NRC Regulatory Issue Summary 2007-1 7, "Preparation and Scheduling of Operator Licensing Examinations," dated July 12,2007 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested in operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 201 1. Attachments 1 through 10 provide responses to RIS 2007-17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2009, 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment
Response to RIS 2007.17                                                                                          Attachment 9 Page 1 of 1 NRC FORM 324                    u s N W L F A R ui.CUL*TOII  CWMISSIrn                                    FXYlYES IM1131IM
: 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where necessary. The operator licensing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818.
  ,*la,,,
Respectfully, Darin M. Benyak I Director - Licensing and Regulatory Affairs August 13,2007 U. S. Nuclear Regulatory Commission Page 3 Attachment 1 - Completed NRC Form 536 for Braidwood Station Attachment 2 -Completed NAC Form 536 for Byron Station Attachment 3 - Completed NRC Form 536 for Clinton Power Station Attachment 4 -Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NAC Form 536 for Limerick Generating Station Attachment 7 - Completed NRC Form 536 for Oyster Creek Generating Station Attachment 8 - Completed NAC Form 536 for Peach Bottom Atomic Power Station Attachment 9 - Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 10 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 Response to RIS 2007-17 PROPOSED NUMBER ESTIMATED NUMBER OF UCENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS Attachment 1 Page 1 of 1 CY= CY CY a CY 2011 0 1 0 1 0 0 0 0 OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 CY 2008 CY = CY- CY 111 0 0 NUMBER OFSENIOR REACTOR OPERATORS-UPGR ADE NUMBEROFSENIOR REAClOR OPERATORS-LlhltlED I A. PROPOSED EXMNATION PREPARATION SCHEDULE 1 0 2 0 0 0 ALTERNATE DATE 10/19/09 511 W011 I0I1I0l6 NUMBER OF REACTOR OPERATORS I PROPOSED NUMBER NUMBEROF ESTIMAlED CANDIDATES I 011310 I l2 1 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT CYm cy azQ MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0 14 0 0 0 0 0 18 I I I PROWEDDATES I PRIMARY DATE I 1 414/2011 Response to RIS 2007-17 Attachment 2 Page 1 of 1 PROPOSED NUMBER ESTIMATEDNUMBEROF LICENSEEPREPARED EXAMINATIONS 11,s NUCLEAR REGULATORY COMMISSION cy rn CY= CYD CYU 0 0 1 1 FACILIT) 8 5 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPUUTORS-LNSTANT Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 0 8 5 0 6 7 NRC REGION I11 0 NUMBEROFSENIOR REACTOR OPERATORS-LIMlTED 0 0 0 I 1 Io I 0 Io ESTIMATED NUMBER OF NRC-PREPARED PROPOSED DATES PRIMARY DATF EXAMINATIONS I I I I B. INITIAL OPERATOR LICENSE EXAMINATIONS 5/19/2008 6/20/2010 8/7/2011 PROPOSED NUMBEROF ESTIMATED XNDIDATES IiIOI'IO NUMBER OFSENIOR REACTOR OPERATORS-UPGRADE cy2008 CY a MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEmEMBER DECEMBER 0 0 0 0 14 0 0 0 ALTERNATE DAI* I 5/26/2008 1 I 06/27/2010 I 8/14/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Response to RIS 2007-17 PROPOSED NUMBER FSTIMATU)
OPERATOR LICENSING EXAMINATION DATA FACILITY                                                                                            NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2                                           111 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254and 50-265 PROPOSED NUMBER                        C Y m                  CY=          CY 2010            CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED                          0                   1              1                  0 EXAMINATIONS
NUMBER OF LICENSEEPREPARED EXAMINATIONS
                                                                                                                            -
*STMATED NUMBER OF NRC-PREPARED EXAMINATIONS Atlachment 3 Page 1 of 1 -2ePB CY a CY a CY 2911 0 1 0 1 0 0 0 0 0 0 NUMBER OFSENlOR REACTOR OPERATORS-UPORADE NUMBER OFSENIOR REACTOR OPERATORS-LIMITED I OI 0 I 6 NUMBER OF REACTOR OPERATORS 3 0 3 0 0 0 I OI3l0 NUMBEROFSENIOR REACTOR OPERATORS-INSTANT PROPOSED NUMBER NUMBER OF FSTIMAED CANDIDAIES a2008 CY MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0 9 0 0 0 0 0 0 PROPOSED DATES I I I I PRMARY DATE I 8/24/2009 I I 8/22/2011 ALTERNATE DATE I 8/17/2009 I I 6/29/2011 
ESTIMATED NUMBEROF NRC-PREPARED                            0                   0             0                   0 EXAMINATIONS NUMBER OF REACTOR OPERATORS                             0                  4              6                  0 NUMBEROFSWIOR REACTOR OmmRs-rnsTANT                              0                   11             8                  0 NUMBER OF SENIOR REACTOR OPERATORS-UFGRADE                            0                    1              1                   0 NUMBER OFSENIOR REACTOR OPERATORS-LIMiTED            l              o          I        o      I        o          I           o        I PROPOSED DATES PRIMARY DATE                                            1011a009      1011w2010 ALTERNATZ DATE I                         I   10/23/2009 I  10/25/2010     I                     I C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE
                                                                                                                  ~~
I CY=                                                  cy PROPOSED MARCH JUNE       SEPTEMBER           DECEMBER     MARCH     NNE      SEPTEMBER   DECEMBER ESTIMATED NUMBEROF CANDIDATES I I I
0 I
16      1 I
0      II 0
I       I           I           I               I


Response to RIS 2007-17 FACILITY LaSalle County Station, Units 1 and 2 Facility Operating License Nos.
Response to RIS 2007-17                                                                           Attachment 10 Page 1 of 1 FACILITY                                                                              NRC REGION Three Mile island Nuclear Station, Unit 1                                       I Facility Operating License No. DPR-50 NRC Docket No.50-289 A. PROPOSED EXAMINATIONPREPARATIONSCHEDULE PROPOSED NUMBER                   CY            CY  =        C Y W              CY ESTIMATED NUMBER OF LICENSEEPREPARED                  0               1           0                   1 FXMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                     0               0             0                   0 EXAMINATIONS PROPOSED NUMBER             I    CY=       I   CY2QQ9    I C Y W              CY NUMBER  OF REACTOR OPERATORS              I o I 1 o I                           0 NUMBEROFSENIOR REACTOR OPERATORS-INSTANT                                  6 I     0 NUMBEROFSWl0RREACIY)R OPERATORS-UPCRADE                   0              1             0                   1 NUMBER OFSENIOR REACTOR OPERATORS-LMmD                      0               0             0                   0 PROF'OSED DATES           I               I             I               I PRMARY DAIE             I               I   5/25/2009 I               1     5/30/2011 ALTERNATE DATE I                1   6/1/2009 I               I ~   6/6/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (WE) SCHEDULE PROPOSED CY                                      CY g!@
NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Attachment 5 Page 1 of 1 NRC REGION 111 OPERATOR LICENSING EXAMINATION DATA PROPOSED NUMBER CY= CY 2Qe9 ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARE0 EXAMINATIONS UCENSEEPREPARED 1 0 0 0 CY2p19 CY 21211 1 0 0 0 4 NUMBER OF REACTOR OPERATORS 0 4 0 I Io I NUMBER OFSENIOR REAmR OPERATORS-INSTANT 0 0 NUMBEROFSENIOR RF.ACIDR OPERATORS-UffiRADE 2 0 0 0 NUMBER OF SENIOR REACTOR OPERATORSLLMmD 0 0 ALTERNATE DATE PROPOSED DATES PRIMARY DAE I 8/25/2008 I 8/18/2008 9/14/2010 I 9/21/2010 I cym PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER NUMBER OF 0 0 0 0 ESTIMATED CANDIDATES CY MARCH JUNE SEFIEMBER DECEMBER 0 12 0 0 Response to RIS 2007-17 PROPOSED NUMBER CY= Attachment 6 Page 1 of 1 CY CYU CY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos.
NUMBER       MARCH        JUNE      SEPTEMBER DECEMBER    MARCH    JUNE    SEPTEMBER      DECEMBER ESTIMAED NUMBEROF       16          0            0        0            0      0          0              0 CANDIDATES}}
50-352 and 50-353 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS I 1 0 0 0 PROPOSED NUMBER CY a 3 NUMBER OF REACTOR OPERATORS ESTIMATED NUMBER OF LICENSEEPREPARED EXAMINATIONS CY CY= CYU 0 9 0 I1 0 NUMBER OFSENIOR REACTOR OPERATORS-LIM-PROPOSED DATES lo " 0 0 PRIMARY DATE ALTERNATE DATE I1lIolglo NUMBER OFSENlORREACrOR OPERATORS-INSTANT 10l20l2000 1 Ol04l2010 NIA 1 Ol27l2000 1011 w2010 NIA . I 210 I 1 Io NUMBER OF SENIOR RWCrOR OPERATORS-UFCRADE PROPOSED NUMBER CY g!Qg cy 2m MARCH I JUNE SEPTEMBER DECEMBER MARCH JUNE SEmEUBER DECEMBER NUMBEROF ESTIMATED XNDIDAIES 0 0 0 0 0 10 0 0 Response to RIS 2007-17 FACILITY Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Attachment 7 Page 1 of 1 NRCRECION I PROWED NliMBER I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY cy m MARCH I JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER PROPOSED NUMBER NRC-PREPARE NUMBEROFREAClOR PRIMARY DATE ALTERNATE DATE NUMBEROF ESnUATED CANDDATES 16 0 0 0 16 0 0 16 Response to RIS 2007-17 FACILITY Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Attachment 8 Page 1 of 1 NRCRECION I PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS A. PROPOSED EXAMINATION PREPARATION SCHEDULE cum cum CYW cum 1 1 and 1 LSRO 1 0 0 0 0 0 9 2 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UFGR ADE 0 I NUMBER OPERATORS OF REACTOR l4l0l 4 7 10 0 2 2 0 PROPOSED DATE5 PRIMARY DATE ALTERNATE DATE lo161010 NUMBER OFSENIOR REACTOR OPERATORS-LlMflED 12/7/2009 12/6/2010 12/6/2008 7/27/2009 . LSRO 12/15/2008 12/1 412009 12/1 w2010 PROPOSED m&lBER NUMBER OF ESTLMATED CANDIDATES CY gQQ@ CY , MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEFTEMBUI DECEMBER 0 0 7 0 0 0 14 0 Response to RIS 2007.17 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Attachment 9 Page 1 of 1 FXYlYES IM1131IM 111 NRC FORM 324 ,*la,,, us NWLFAR ui.CUL*TOII CWMISSIrn PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBEROF NRC-PREPARED EXAMINATIONS OPERATOR LICENSING EXAMINATION DATA CYm CY= CY 2010 CY 2011 0 1 1 0 0 0 0 0 - FACILITY 0 0 0 NUMBER OF REACTOR OPERATORS NUMBEROFSWIOR REACTOR OmmRs-rnsTANT NUMBER OF SENIOR REACTOR OPERATORS-UFGRADE NRC REGION 4 6 0 11 8 0 1 1 0 PROPOSED DATES PRIMARY DATE 1011 a009 1011 w2010 PROPOSED loIoIoIoI NUMBER OFSENIOR REACTOR OPERATORS-LIMiTED
~~ CY= cy MARCH I JUNE SEPTEMBER DECEMBER MARCH NNE SEPTEMBER DECEMBER I I 10/23/2009 I 10/25/2010 I I ALTERNATZ DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I ESTIMATED NUMBEROF I 0 I 16 1 0 I 0 CANDIDATES I I I I I I I I I Response to RIS 2007-17 Attachment 10 Page 1 of 1 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEEPREPARED FXMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS FACILITY Three Mile island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY CY = CYW CY 0 1 0 1 0 0 0 0 NRC REGION I 0 0 NUMBEROFSWl0RREACIY)R OPERATORS-UPCRADE NUMBER OFSENIOR REACTOR OPERATORS-LMmD 1 0 1 0 0 0 PROPOSED NUMBER I CY= I CY2QQ9 I CYW CY CY CY g!@ NUMBER OPERATORS OF REACTOR IoI1oI 0 MARCH JUNE SEPTEMBER DECEMBER 16 0 0 0 0 I 6 NUMBEROFSENIOR REACTOR OPERATORS-INSTANT MARCH JUNE SEPTEMBER DECEMBER 0 0 0 0 PROF'OSED DATES I I I I PRMARY DAIE I I 5/25/2009 I 1 5/30/2011 I ALTERNATE DATE 1 6/1/2009 I I ~ 6/6/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (WE) SCHEDULE PROPOSED NUMBER ESTIMAED NUMBEROF CANDIDATES}}

Revision as of 16:40, 14 November 2019

Miscellaneous Correspondence for the Dresden Initial Examination - March 2008
ML081720217
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/03/2008
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML081010290 List:
References
50-237/08-301, 50-249/08-301
Download: ML081720217 (24)


Text

MISCELLANEOUS CORRESPONDENCE

-

FOR THE DRESDEN INITIAL EXAM MARCH 2008

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 February 27,2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Pardee:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Dresden Nuclear Power Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. George Graff, Training Director. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the weeks of March 3 and 10, 2008. The NRC staff will administer the operating tests during the week of March 3 and 10, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-I021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-I021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Dell R. McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htttx//www.nrc.oov/readinQ-rm/adams.html.

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station

-

Plant Manager Dresden Nuclear Power Station RegulatoryAssurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and RegulatoryAffairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department

C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.aov/readina-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237;50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\DRE 02-08 DRS OL exam approval.doc Publicly Available Non-PubliclyAvailable 0 Sensitive 0 Non-Sensitive OFFICIAL RECORD COPY

C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.aov/readina-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission G. Graff, Training Department DOCUMENT NAME: G:\DRS\Work in Progress\DRE 02-08 DRS OL exam approval.doc PubliclyAvailable 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive OFFICIAL RECORD COPY

Letter to Charles G. Pardee from Hironori Peterson dated February 27, 2008.

SUBJECT:

DRESDEN NUCLEAR POWER STATION OPERATOR LICENSING EXAMINATIONAPPROVAL ADAMS Distribution:

TEB RAG1 CXG1 RidsNrrDirslrib MAS KGO JKH3 CJP3 CAAI DRPlll DRSlll PLBI TXN NLS

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 December 3,2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Dear Mr. Crane:

In a telephone conversation on November 16,2007, between Mr. F. Ferrero, Senior Instructor, and Mr. Dell McNeil, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Dresden Nuclear Power Station the weeks of March 3 and March 10, 2007. In addition, the NRC will make an examination validation visit to your facility the week of February 11,2007.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it was necessary for your staff to furnish the examination outlines by October 22, 2007. Your staff has already provided the examination outlines. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due during the week of January 7,2007. Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations ( I O CFR 55..40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget

C. Crane (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53). US. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-001 8), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Ferrero has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Dell McNeil at 630-829-9737, or me at 630-829-9707.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.qov/readina-rm/adams.html (the Public Electronic Reading Room).

V Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 DISTRIBUTION See next page

C. Crane (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Papenvork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), US. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018). Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Ferrero has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Dell McNeil at 630-829-9737, or me at 630-829-9707.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.aov/readina-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 DISTRIBUTION See next page DOCUMENT NAME: G:\OL BPS\RevSLtr 1 bps.wpd 0 Publicly Available 0 Non-Publicly Available Sensitive 0 Non-Sensitive To recelve a coovof this document. Indicate In the concurrence box "C" = Coovwlthout attach/encl "E" = Coov

Letter to Christopher M. Crane from Hironori Peterson dated December 3.2007.

SUBJECT:

ARRANGEMENTS FOR THE ADMINISTRATION OF LICENSING EXAMINATIONS AT DRESDEN NUCLEAR POWER STATION cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatoly Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services

-

Senior Vice President Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. Symonds, Training Department

Letter to Christopher M. Crane from Hironori Peterson dated December 3, 2007.

SUBJECT:

ARRANGEMENTS FOR THE ADMINISTRATION OF LICENSING EXAMINATIONSAT DRESDEN NUCLEAR POWER STATION cc w/encl: -

Site Vice President Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager RegulatoryAssurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group

-

Manager Licensing Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. Symonds, Training Department DISTRIBUTION:

TEB RAG1 JFWI MMT RidsNrrDirslrib MAS KGO JKH3 CJP3 CAAl DRPlll DRSlll PLBl TXN NLS

August 13,2007 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2007-17 "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations," dated July 12,2007 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested in operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 2011. Attachments 1 through 10 provide responses to RIS 2007-17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009, 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual site examinationthat involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where necessary.

The operator licensing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818.

Respectfully, Darin M. Benyak I Director - Licensing and Regulatory Affairs

August 13,2007 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station -Completed NAC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station -Completed NRC Form 536 for Dresden Nuclear Power Station -Completed NRC Form 536 for LaSalle County Station -Completed NAC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NAC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2007-17 Attachment 1 Page 1 of 1 OPERATOR LICENSING EXAMINATION DATA Braidwood Station, Units 1 and 2 111 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 I

A. PROPOSED E X M N A T I O N PREPARATION SCHEDULE PROPOSED NUMBER CY= CY CY a CY 2011 ESTIMATED NUMBER OF UCENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS PROPOSED NUMBER CY 2008 CY = CY- CY I1 NUMBER OF REACTOR OPERATORS I 0 I 1 I 0 l 6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OFSENIOR REACTOR I 0 1 1 3 1 0 I l2 OPERATORS-UPGRADE 0 1 0 2 NUMBEROFSENIOR REAClOR OPERATORS-LlhltlED 0 0 0 0 I PROWEDDATES I I I PRIMARY DATE I 1 414/2011 ALTERNATE DATE 10/19/09 511W011 PROPOSED C Y m cy azQ NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMAlED NUMBEROF 0 14 0 0 0 0 0 18 CANDIDATES

Response to RIS 2007-17 Attachment 2 Page 1 of 1 11,s NUCLEAR REGULATORY COMMISSION FACILIT) NRC REGION Byron Station, Units 1 and 2 I11 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 PROPOSED NUMBER cy rn CY= C Y D C Y U ESTIMATEDNUMBEROF LICENSEEPREPARED 0 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS I

I 1 I I

o I I

0 I I

o B. INITIAL OPERATOR LICENSE EXAMINATIONS NUMBER OF REACTOR OPERATORS 8 0 8 5 NUMBER OF SENIOR REACTOR OPUUTORS-LNSTANT 5 0 6 7 NUMBER OFSENIOR REACTOR OPERATORS-UPGRADE NUMBEROFSENIOR REACTOR I i I O I ' I O OPERATORS-LIMlTED 0 0 0 0 PROPOSED DATES PRIMARY DATF 5/19/2008 6/20/2010 8/7/2011 ALTERNATE DAI I 5/26/2008 1 I 06/27/2010 I 8/14/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cy2008 CY a MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEmEMBER DECEMBER ESTIMATED NUMBEROF 0 0 0 0 14 0 0 0 XNDIDATES

Response to RIS 2007-17 Atlachment 3 Page 1 of 1 PROPOSED NUMBER -2ePB CY a CY a CY 2911 FSTIMATU) NUMBER OF LICENSEEPREPARED 0 1 0 1 EXAMINATIONS STMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS NUMBER OF REACTOR OPERATORS I O I 0 I 6 NUMBEROFSENIOR REACTOR OPERATORS-INSTANT I O I 3 l 0 NUMBER OFSENlOR REACTOR OPERATORS-UPORADE 0 3 0 3 NUMBER OFSENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES I I I I PRMARY DATE I 8/24/2009 I I 8/22/2011 ALTERNATE DATE I 8/17/2009 I I 6/29/2011 PROPOSED a2008 CY NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER FSTIMAED NUMBER OF 0 9 0 0 0 0 0 0 CANDIDAIES

Response to RIS 2007-17 Attachment 5 Page 1 of 1 OPERATOR LICENSING EXAMINATION DATA FACILITY NRC REGION LaSalle County Station, Units 1 and 2 111 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 PROPOSED NUMBER CY= CY 2Qe9 CY2p19 CY 21211 ESTIMATED NUMBER OF UCENSEEPREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARE0 0 0 0 0 EXAMINATIONS NUMBER OF REACTOR OPERATORS 4 0 4 0 I NUMBER OFSENIOR R E A m R OPERATORS-INSTANT I I o NUMBEROFSENIOR RF.ACIDR OPERATORS-UffiRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORSLLMmD 0 0 0 0 PROPOSED DATES PRIMARY D A E 8/18/2008 9/14/2010 ALTERNATE DATE I 8/25/2008 I I 9/21/2010 I cy m CY PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEFIEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 6 Page 1 of 1 Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 PROPOSED NUMBER CY= CY C Y U CY I 1 l o ESTIMATED NUMBER OF LICENSEEPREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 0 0 0 EXAMINATIONS PROPOSED NUMBER CY a CY CY= C Y U NUMBER OF REACTOR OPERATORS 3 0 9 0 NUMBER OFSENlORREACrOR OPERATORS-INSTANT I 1 l I o l g l o NUMBER OF SENIOR RWCrOR OPERATORS-UFCRADE I 2 1 0 I 1 I o NUMBER OFSENIOR REACTOR 0 " 0 0 OPERATORS-LIM-PROPOSED DATES PRIMARY DATE 10l20l2000 1Ol04l2010 NIA ALTERNATE DATE 1Ol27l2000 . 1011w2010 NIA CY g!Qg cy 2m PROPOSED NUMBER MARCH I JUNE SEPTEMBER DECEMBER MARCH JUNE SEmEUBER DECEMBER ESTIMATED NUMBEROF 0 0 0 0 0 10 0 0 XNDIDAIES

Response to RIS 2007-17 Attachment 7 Page 1 of 1 FACILITY NRCRECION Oyster Creek Generating Station I Facility Operating License No. DPR-16 NRC Docket No. 50-219 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER NRC-PREPARE NUMBEROFREAClOR PRIMARY DATE ALTERNATE DATE PROWED CY cy m NliMBER MARCH I JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESnUATED NUMBEROF 16 0 0 0 16 0 0 16 CANDDATES

Response to RIS 2007-17 Attachment 8 Page 1 of 1 FACILITY NRCRECION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cum cum C Y W cum ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 and 1 LSRO 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS NUMBER OPERATORS OF REACTOR l 4 l 0 l 4 I 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 7 10 0 NUMBER OF SENIOR REACTOR OPERATORS-UFGRADE 2 2 2 0 NUMBER OFSENIOR REACTOR OPERATORS-LlMflED l o 1 6 1 0 1 0 PROPOSED DATE5 12/7/2009 PRIMARY DATE 12/6/2010 12/6/2008 7/27/2009 .LSRO ALTERNATE DATE 12/15/2008 12/1412009 12/1w2010 CY gQQ@ CY PROPOSED ,

m&lBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEFTEMBUI DECEMBER ESTLMATED NUMBER OF 0 0 7 0 0 0 14 0 CANDIDATES

Response to RIS 2007.17 Attachment 9 Page 1 of 1 NRC FORM 324 u s N W L F A R ui.CUL*TOII CWMISSIrn FXYlYES IM1131IM

,*la,,,

OPERATOR LICENSING EXAMINATION DATA FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 111 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254and 50-265 PROPOSED NUMBER C Y m CY= CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS

-

ESTIMATED NUMBEROF NRC-PREPARED 0 0 0 0 EXAMINATIONS NUMBER OF REACTOR OPERATORS 0 4 6 0 NUMBEROFSWIOR REACTOR OmmRs-rnsTANT 0 11 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UFGRADE 0 1 1 0 NUMBER OFSENIOR REACTOR OPERATORS-LIMiTED l o I o I o I o I PROPOSED DATES PRIMARY DATE 1011a009 1011w2010 ALTERNATZ DATE I I 10/23/2009 I 10/25/2010 I I C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE

~~

I CY= cy PROPOSED MARCH I JUNE SEPTEMBER DECEMBER MARCH NNE SEPTEMBER DECEMBER ESTIMATED NUMBEROF CANDIDATES I I I

0 I

16 1 I

0 II 0

I I I I I

Response to RIS 2007-17 Attachment 10 Page 1 of 1 FACILITY NRC REGION Three Mile island Nuclear Station, Unit 1 I Facility Operating License No. DPR-50 NRC Docket No.50-289 A. PROPOSED EXAMINATIONPREPARATIONSCHEDULE PROPOSED NUMBER CY CY = C Y W CY ESTIMATED NUMBER OF LICENSEEPREPARED 0 1 0 1 FXMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS PROPOSED NUMBER I CY= I CY2QQ9 I C Y W CY NUMBER OF REACTOR OPERATORS I o I 1 o I 0 NUMBEROFSENIOR REACTOR OPERATORS-INSTANT 6 I 0 NUMBEROFSWl0RREACIY)R OPERATORS-UPCRADE 0 1 0 1 NUMBER OFSENIOR REACTOR OPERATORS-LMmD 0 0 0 0 PROF'OSED DATES I I I I PRMARY DAIE I I 5/25/2009 I 1 5/30/2011 ALTERNATE DATE I 1 6/1/2009 I I ~ 6/6/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (WE) SCHEDULE PROPOSED CY CY g!@

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMAED NUMBEROF 16 0 0 0 0 0 0 0 CANDIDATES