ML081720231
Jump to navigation
Jump to search
| ML081720231 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 03/03/2008 |
| From: | Mcneil D NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Shared Package | |
| ML081010290 | List: |
| References | |
| 50-237/08-301, 50-249/08-301 | |
| Download: ML081720231 (2) | |
Text
LIST OF PROVIDED REFERENCES FOR CANDIDATES FOR THE DRESDEN INITIAL EXAMINATION MARCH 2008
LIST OF PROVIDED REFERENCES
- 1. Dresden Emergency Operating Procedure (DEOP) flow charts, with entry conditions blanked out.
- 2. DOP 1600-02, Torus Water Level Control; Revision 15
- 3. Dresden Technical Specifications LCO 3.5.1, Emergency Core Cooling Systems (ECCS) and Isolation Condenser (IC) -Operating, with less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Times blanked out; Amendment No. 21 2/204
- 4. Dresden Technical Specifications LCO 3.3.1.2, SRM Instrumentation, with less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Times blanked out; Amendment No. 185/180
- 5. Hot Matrix and Cold ShutdownlRefueling Matrix from EP-AA-1004, Radiological Emergency Plan Annex for Dresden Station; Revision 23
- 6. Dresden Technical Specifications LCO 3.6.4.3, Standby Gas Treatment System, with less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Times blanked out; Amendment No. 221/212
- 7. DOA 4400-06, 2/3 Cribhouse Screen Plugging
- 8. Dresden Technical Specifications Bases 3.3.1.I, RPS Instrumentation