ML22235A756
| ML22235A756 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 05/14/2021 |
| From: | Chuck Zoia NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co LLC, Exelon Generation Co |
| Zoia C | |
| Shared Package | |
| ML20136A310 | List: |
| References | |
| Download: ML22235A756 (2) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Date of NRC Developed Exam: 4-19-2021 Operating Test No.: 2021-301 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO#1 RX 2
1 1
1 0 NOR 2
1 1
1 1 I/C 3, 5, 8
5, 7 5
4 4 2 MAJ 7, 9 6, 8 4
2 2 1 TS 0
2 2 RO#2 RX 1
1 1
1 0 NOR 1
1 2
1 1 1 I/C 4, 6 4, 5 3, 4 6
4 4 2 MAJ 7, 9 6, 7 6, 8 6
2 2 1 TS 0
2 2 RO#3 RX 2
1 1
1 0 NOR 2
1 2
1 1 1 I/C 3, 5, 8
3, 8 3, 4 7
4 4 2 MAJ 7, 9 6, 7 6, 8 6
2 2 1 TS 0
2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Date of NRC Developed Exam: 4-19-2021 Operating Test No.: 2021-301 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I#1 RX 1
2 2
3 1
1 0 NOR 2
1 2
1 1 1 I/C 3, 4, 5, 6, 8
3, 8 3, 4, 5, 7 11 4
4 2 MAJ 7, 9 6, 7 6, 8 6
2 2 1 TS 3, 4, 5
3, 5 5
0 2 2 SRO-I#2 RX 1
2 2
3 1
1 0 NOR 2
1 2
1 1 1 I/C 3, 4, 5, 6, 8
3, 4, 5, 8 5, 7 11 4
4 2 MAJ 7, 9 6, 7 6, 8 6
2 2 1 TS 3, 4, 5
3, 4 5
0 2 2 SRO-I#3 RX 1
2 2
1 1 0 NOR 1
1 2
1 1 1 I/C 4, 6 4, 5 3, 4, 5, 7 8
4 4 2 MAJ 7, 9 6, 7 6, 8 6
2 2 1 TS 3, 5 2
0 2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.