Form 5.1-1 Post Examination Check Sheet
ML23160A171
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/09/2023
From:
NRC/RGN-III/DORS/OB
To:
Constellation Energy Generation
Gregory Roach
Shared Package
ML22007A051 List:
References
Download: ML23160A171 (1)


Text

Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: Dresden Dates of Examination: April 10-17, 2023 Activity Description Date Complete

1. *Received post examination package from facility licensee and verified complete. (ES-4.4) 05/01/2023
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 05/05/2023
3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.

(ES-3.6) 05/17/2023

4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 05/17/2023
5. Completed licensing official review.

05/22/2023

6. Mailed licenses, preliminary results, and pass letters.

05/22/2023

7. Notified facility licensee of results.

05/18/2023

8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

05/30/2023

9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

N/A

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).

06/09/2023

  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.