ML22195A127
| ML22195A127 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 12/03/2021 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Baker R | |
| Shared Package | |
| ML21055A861 | List: |
| References | |
| 21-0062 | |
| Download: ML22195A127 (1) | |
Text
ES-201 Facility:
Date of Examination:
Developed:
Written:
Facility:
NRC:
//
Operating:
Facility:
NRC:
Days from Exam Target Date*
Chief Examiner's Initials
-240 03/06/2021 RDB
-210 04/05/2021 RDB
-210 04/05/2021 RDB
-210 04/05/2021 RDB
-210 04/05/2021 RDB
-195 04/20/2021 RDB
-150 06/04/2021 RDB
-136 06/18/2021 RDB
-75 08/20/2021 RDB
-60 09/07/2021 RDB
-60 09/03/2021 RDB
-50 09/10/2021 09/20/2021 RDB
-35 09/20/2021 RDB
-35 09/20/2021 RDB
-30 10/02/2021 RDB
-14 10/12/2021 RDB
-7 10/12/2021 RDB
-7 10/12/2021 RDB
-7 10/12/2021 RDB
-7 10/26/2021 RDB
-7 10/26/2021 RDB Exam Date:
11/01/2021
- 16. Request facility licensee management feedback on the examination (C.2.l).
- 17. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).
- 18. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
- 19. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
- Target dates are based on facility prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case by case basis in coordination with the facility licensee.
11a. Operating test review completed (C.3.f).
11b. Written exam review completed (C.3.f).
12b. The NRC and the facility licensee conduct exam preparatory week.
- 13. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).
- 14. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
- 15. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).
12a. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g).
- 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).
- 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; C.3.d-e).
9a. Proposed examinations (JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);
supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
9b. Proposed written examination due to NRC for review (Per CE resource scheduling.)
(C.1.e-h; C.3.d).
- 10. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).
Task Description (Reference)
- 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).
Form ES-201-1 November 1 - 11, 2021 Dresden Nuclear Station, Units 2 and 3 Examination Preparation Checklist
- 2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
- 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
- 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).
- 5. Corporate notification letter sent (C.2.e).