ML22195A266
| ML22195A266 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 06/26/2021 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | |
| Baker R | |
| Shared Package | |
| ML21055A860 | List: |
| References | |
| Download: ML22195A266 (2) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Generating Station Date of Exam: 11/1/2021 Operating Test No.: 2021-302 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 3 (ILT-N-3) 4 (ILT-N-4) 2 (ILT-N-2) 1 (ILT-N-1) SPARE T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
SRO-I
- 1 (Eggers)
RX 2
2 3
3 1
1 0
NOR 1
1 2
1 1
1 I/C 3,4,5
,6 3,5 2,4, 5,6, 8
11 4
4 2
MAJ 7,8 7,9 7,9 6
2 2
1 TS 3,5 4,5 4
0 2
2 SRO-I
- 2 (Bennett)
RX 2
3 2
1 1
0 NOR 1
1 2
1 1
1 I/C 4,5 3,4, 5,6, 8
2,5 9
4 4
2 MAJ 7,8 7,9 7,9 6
2 2
1 TS 3,6 2
0 2
2 RO
- 1 (Snow)
RX 2
1 1
1 0
NOR 1
1 2
1 1
1 I/C 3,6 4,6,8 4,6,8 8
4 4
2 MAJ 7,8 7,9 7,9 6
2 2
1 TS 0
0 2
2 SRO-I
- 3 (Grischott)
RX 2
2 3
3 1
1 0
NOR 1
1 2
1 1
1 I/C 3,4,5
,6 3,4, 5,6, 8
2,5 11 4
4 2
MAJ 7,8 7,9 7,9 6
2 2
1 TS 3,5 3,6 4
0 2
2 RO
- 2 (Komperda)
RX 2
1 1
1 0
NOR 1
1 1
1 1
I/C 3,6 4,6,8 5
4 4
2 MAJ 7,8 7,9 4
2 2
1 TS 0
0 2
2
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Generating Station Date of Exam: 11/1/2021 Operating Test No.: 2021-302 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 3 (ILT-N-3) 4 (ILT-N-4) 2 (ILT-N-2) 1 (ILT-N-1) SPARE T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
- 3 (Campbell)
RX 2
1 1
1 0
NOR 1
1 2
1 1
1 I/C 4,5 3,5 4,6,8 7
4 4
2 MAJ 7,8 7,9 7,9 6
2 2
1 TS 0
0 2
2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.