ML22195A266

From kanterella
Jump to navigation Jump to search
Nov 2021 Ile Es 301-5 Transients and Events Checklist
ML22195A266
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/26/2021
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Baker R
Shared Package
ML21055A860 List:
References
Download: ML22195A266 (2)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Generating Station Date of Exam: 11/1/2021 Operating Test No.: 2021-302 A E Scenarios P V 3 (ILT-N-3) 4 (ILT-N-4) 2 (ILT-N-2) 1 (ILT-N-1) SPARE T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T N I T S A B S A B S A B S A B I C R T O R T O R T O R T O A M

A T O C P O C P O C P O C P L U N Y M(*)

T P E R I U RX 2 2 3 3 1 1 0 NOR 1 1 2 1 1 1 SRO-I

  1. 1 2,4, 3,4,5 (Eggers) I/C 3,5 5,6, 11 4 4 2

,6 8

MAJ 7,8 7,9 7,9 6 2 2 1 TS 3,5 4,5 4 0 2 2 RX 2 3 2 1 1 0 SRO-I NOR 1 1 2 1 1 1

  1. 2 3,4, (Bennett) I/C 4,5 5,6, 2,5 9 4 4 2 8

MAJ 7,8 7,9 7,9 6 2 2 1 TS 3,6 2 0 2 2 RX 2 1 1 1 0 RO

  1. 1 NOR 1 1 2 1 1 1 (Snow) I/C 3,6 4,6,8 4,6,8 8 4 4 2 MAJ 7,8 7,9 7,9 6 2 2 1 TS 0 0 2 2 RX 2 2 3 3 1 1 0 NOR 1 1 2 1 1 1 SRO-I
  1. 3 3,4, 3,4,5 (Grischott) I/C 5,6, 2,5 11 4 4 2

,6 8

MAJ 7,8 7,9 7,9 6 2 2 1 TS 3,5 3,6 4 0 2 2 RX 2 1 1 1 0 RO

  1. 2 NOR 1 1 1 1 1 (Komperda) I/C 3,6 4,6,8 5 4 4 2 MAJ 7,8 7,9 4 2 2 1 TS 0 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Dresden Generating Station Date of Exam: 11/1/2021 Operating Test No.: 2021-302 A E Scenarios P V 3 (ILT-N-3) 4 (ILT-N-4) 2 (ILT-N-2) 1 (ILT-N-1) SPARE T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T N I T S A B S A B S A B S A B I C R T O R T O R T O R T O A M

A T O C P O C P O C P O C P L U N Y M(*)

T P E R I U RX 2 1 1 1 0 RO

  1. 3 NOR 1 1 2 1 1 1 (Campbell) I/C 4,5 3,5 4,6,8 7 4 4 2 MAJ 7,8 7,9 7,9 6 2 2 1 TS 0 0 2 2 Instructions:
1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.