ML081720224

From kanterella
Jump to navigation Jump to search
Facility Post-Examination Comments for the Dresden Initial Examination - March 2008
ML081720224
Person / Time
Site: Dresden  
Issue date: 03/03/2008
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML081010290 List:
References
50-237/08-301, 50-249/08-301
Download: ML081720224 (2)


Text

FACILITY POST-EXAMINATION COMMENTS FOR THE DRESDEN INITIAL EXAM - MARCH 2008

Nuclear Exelon Cenerdtmn Company, LLC www exeloniorp corn Diriden Nuclear POWCI jtatlon h i 0 0 Noriti Dreidcn Road M ~ r i i i.

It 60410-9701 March 24. 2008 SVPLTR # 08-0022 Attention: NRC Region Ill Administrator 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Docket Nos. 50-237 and 50-249 Dresden 2008 Initial License Examinatin Post Examination Review

Subject:

Following the administration of the Dresden initial license exam on Monday, March 10,2008, the station conducted post examination test item analysis per Exelon procedure. The entire exam was reviewed and five questions were further reviewed due to three or more candidates missing the same question. In reviewing the five questions they were found to be acceptable as written. with no changes required or requested from the candidates. Therefore, there are no changes necessary to the examination.

Should you have any questions concerning this matter, please contact Mr. James Ellis, Regulatory Assurance Manager at (815) 416-2800.

Respectfully, David B. Wozniak Site vice President Dresden Nuclear Power Station cc:

Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Dresden Station