Form 3.4-1 Events and Evolutions Checklist Scenario 1 is the spare scenario. Scenario 1 is listed below to show the numbers if it is required to be used. The events in Scenario 1 are not included in the totals on the right.

+

Facility: Dresden Power Station Date of Exam: 4/10/2023 Operating Test No: 2023-301 NRC Exam A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

(Spare, numbers not included in totals) 2 3

4 T

O T

A L

M I

N I

M U

M*

Position Position Position Position S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P RO I

U Niedzwiecki RX 5

2 4

2 1

1 0

NOR 1

1 1

1 1

1 I/C 2,3, 4,6 3,5 2,3,4

,5,6 7

4 4

2 MAJ 7,8 6,7 7,8 4

2 2

1 Man. Ctrl 5

1 1

1 0

TS 4,6 2,3 2

0 2

2 Norman RX 2

1 1

1 0

NOR 1

1 1

2 1

1 1

I/C 4, 6 3,4,5 3,4,5 6#

4 4

2 MAJ 7,8 6,7 7,8 4

2 2

1 Man. Ctrl 4

4 1

1 1

0 TS 3,4 2

0 2

2 Kaluzny RX 5

4 1

1 1

0 NOR 1

1 1

1 1

I/C 2,3 3,4 2,6 4

4 4

2 MAJ 7,8 6,7 7,8 4

2 2

1 Man. Ctrl 2

1 1

1 0

TS 0

0 2

2 Hanley RX 2

3 4

3 1

1 0

NOR 1

1 2

1 1

1 I/C 3,5 2,3,4

,5 2,3,4

,5,6 11 4

4 2

MAJ 6,7 6,7 7,8 6

2 2

1 Man. Ctrl 5

1 1

1 0

TS 2,4 2,3 4

0 2

2 Edwards RX 2

1 1

1 0

NOR 1

1 2

1 1

1 I/C 3,4,5 3,4,5 6#

4 4

2 MAJ 6,7 7,8 4

2 2

1 Man. Ctrl 4

1 1

1 0

TS 3,4 2

0 2

2

Form 3.4-1 Events and Evolutions Checklist

  1. - Extra component/instrument failure as ATC/BOP to replace missed reactivity move while acting as ATC/BOP.

Facility: Dresden Power Station Date of Exam: 4/10/2023 Operating Test No: 2023-301 NRC Exam A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

(Spare, numbers not included in totals) 2 3

4 T

O T

A L

M I

N I

M U

M*

Position Position Position Position S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P RO I

U Gibney RX 4

1 1

1 0

NOR 1

1 2

1 1

1 I/C 3

3,5,8 2,6 6

4 4

2 MAJ 6,7 6,7 7,8 6

2 2

1 Man. Ctrl 5

2 2

1 1

0 TS 0

0 2

2 Ali RX 2

3 4

3 1

1 0

NOR 1

1 2

1 1

1 I/C 3,4,5 2,4 2,3,4

,5,6 10 4

4 2

MAJ 6,7 6,7 7,8 6

2 2

1 Man. Ctrl 4

1 1

1 0

TS 3,4 2,3 4

0 2

2 Trafton RX 4

1 1

1 0

NOR 1

1 1

1 1

I/C 3,4 2,6 4

4 4

2 MAJ 6,7 7,8 4

2 2

1 Man. Ctrl 2

1 1

1 0

TS 0

0 2

2 Johnson RX 2

1 1

1 0

NOR 1

1 1

1 1

I/C 3,5 3,4,5 5

4 4

2 MAJ 6,7 7,8 4

2 2

1 Man. Ctrl 5

4 2

1 1

0 TS 0

0 2

2

Form 3.4-1 Events and Evolutions Checklist Form 3.4-1 Instructions for the Events and Evolutions Checklist

1. Mark the applicant license level for each simulator operating test number.
2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
  • Minimums are subject to the instructions in Section C.2, License Level Criteria.

KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO =

Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan