MONTHYEARML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22215A1812021-05-14014 May 2021 April 2021 Administered JPMs ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 SVPLTR 21-0007, April 2021 Submittal Letter2021-05-14014 May 2021 April 2021 Submittal Letter ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22215A2462021-05-14014 May 2021 April 2021 Form ES-301-6 ML22215A2422021-05-14014 May 2021 April 2021 Form ES-301-4 ML22215A2382021-05-14014 May 2021 April 2021 Form ES-301-3 ML22215A1852021-05-14014 May 2021 April 2021 Administered Scenarios ML22236A0172021-05-14014 May 2021 Initial License Exam Forms ES-301-2 ML22236A0162021-05-14014 May 2021 Initial License Exam Forms ES-301-1 ML22216A1872021-05-14014 May 2021 April 2021 Proposed JPMs ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22216A1892021-05-14014 May 2021 April 2021 Proposed Scenarios ML22236A0182021-05-14014 May 2021 Initial License Exam Forms ES-401-1 and ES-401-3 rev1 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam 2023-06-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22236A6382021-05-14014 May 2021 April 2021 Initial License Exam Form ES-401-4 ML22215A1812021-05-14014 May 2021 April 2021 Administered JPMs ML22215A1852021-05-14014 May 2021 April 2021 Administered Scenarios ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 SVPLTR 21-0007, April 2021 Submittal Letter2021-05-14014 May 2021 April 2021 Submittal Letter ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22215A2462021-05-14014 May 2021 April 2021 Form ES-301-6 ML22215A2422021-05-14014 May 2021 April 2021 Form ES-301-4 ML22215A2382021-05-14014 May 2021 April 2021 Form ES-301-3 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam ML22236A6392021-05-14014 May 2021 April 2021 Initial License Exam Form ES-401-9 ML22236A0202021-05-14014 May 2021 Initial License Exam Forms ES-D1 ML22236A6372021-05-14014 May 2021 April 2021 Initial License Exam Form ES-301-7 ML22236A6402021-05-14014 May 2021 April 2021 Initial License Exam Operating Test Outline Comments 2023-06-09
[Table view] |
Text
-
UPDATED CHECKLISTS ADMINISTERED EXAMINATION FOR THE DRESDEN INITIAL EXAM - MARCH 2008
ES-201
- Examination Security Agreement A
F o ES-201-3
~
- 1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 3/!3bf+ ?&!%the date of my signature. I agree that I will not knowingly divulge any informationabout these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinationsfrom this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g.. acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical Security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations andlor an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination secunty may have been compromised.
- 2. Post-Examination To the best of my knowledge. I did not divulge to any unauthorized persons any informationcmceming the NRC licensing examinations administered during the week@)of . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensingexaminations, except as specifically noted below and authorized by the NRC.
PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) DATE SIGNATURE (2) DATE NOTE ES-201 j 26 of 27 ,)
ES-301 Control Roodn-Plant Systems Outline Form ES-301-2 Facility: Dresden Date of Examination: 3/3/08 Exam Level: RO SRO-I 0 SRO-U 0 Operating Test Number: 2008-301 Control Room Systems' (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System I JPM Title I Typecode" Safety Function
- a. Injection of SBLC System (211000.A4.08) I A.D,P,S 1
- b. Start the Third Reactor Feed Pump (259001.A4.02) I N,S 2
- c. Perform an Emergency Depressurization (218000.A4.01) I D,S 3
- d. Lineup LPCl to CST for Injection (295031Al.01) A, D, S 4
- e. Verify Spurious Group 1 Isolation (223002.A4.01) A, D, L, S 5
- 1. Crosstie Bus 23-1 and Bus 33-1 (262001.A4.01) I L,NS 6
- g. Drive TIP Detectors to Isolation Position (215001.A4.03) I D.P,S 7
- h. Alian Charcoal Adsorber Filters in Parallel Mode of Operation I D,S 9 In-Plant Systems' (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Locallv Pull ARI Fuses to Reset ATWSIARI Circuit (295037.A1.03) I D.E I 1
- j. Manual Fill of Unit 3 EDG Day Tank (264000.A1.02) A, E, N, R 6
- k. Valve in Control Room Emergency Breathing Air Supply (290003.A2.02) D, p 8 overlap those tested in the control rmm.
'Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 2-3 (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank inch '9 (P)revious 2 exams (S)imulator I
ES-301, Page 23 of 27
ES-301 Control Roomhn-Plant Systems Outline Form ES-301-2 Facility: Dresden Date of Examination: 3/3/08 Exam Level: RO 0 SRO-I SRO-U 0 Operating Test Number: 2008-301 Control Room Systems" (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U. including 1 ESF)
System / JPM Title 7 'Ode' Function
- a. Injection of SBLC System (211000.A4.08)
- b. Start the Third Reactor Feed Pumo (259001.A4.02)
C.
- d. Lineup LPCl to CST for Injection (295031A1.01)
- e. Verify Spurious Group 1 Isolation (223002.A4.01)
- f. Crosstie Bus 23-1 and Bus 33-1 (262001.A4.01)
IA, D, S A, D, L, S L, N, S I
I 5
6
- g. Drive TIP Detectors to Isolation Position (215001.A4.03)
- h. Align Charcoal Adsorber Filters in Parallel Mode of Operation (271000.A4.09)
In-Plant Systems" (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Locally Pull ARI Fuses to Reset ATWSIARI Circuit (295037.A1.03) D, E 1
- j. Manual Fill of Unit 3 EDG Day Tank (264000.A1.02) A, E, N, R 6
- k. Valve in Control Room Emergency Breathing Air Supply (290003.A2.02) D. P 8 overlap those tested in the control room.
'Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 (C)ontrol room (D)irect from bank -
<9/ 58 (E)mergency or abnormal in-plant -
> I / 21 (L)ow-Power / Shutdown -
> I / >I (N)ew or (M)odified from bank includir (A) -
>2/ 22 (P)revious 2 exams - 3 15 3 / 5 2 (randomly selected)
(WCA -
> I / 21 1 2 1 (S)imulator ES-301,Page 23 of 27
ES-301 Transient and Event Checklist Form ES-301-5
-acilitv Dresden A
Date of Exam 3/3/08 Scenarios Overatma Test Number 2008-301 P
P L
I E
N T
1 I 2 I 3 I 4 M
I N
C I A T M N V i
T E Mu(*,
ROs RX Volden NOR Ramsay I/c MAJ
~
TS SRO-l RX
~
Bachmal NOR Winters -
I/C 4 4 2 MAJ 2 1 Ts SRO-l FIX
- 0 2 2 Jyas NOR Jitchfieli E-MAJ Ts SRO-l RX Ford NOR I/C
~
MAJ Ts RO
-RX
~
0 3ell NOR I/c
~
MAJ Ts
- 01212 RO RX Zherroni NOR M:
MAJ 2 ! 2 1 1 rs
~
- 01 2 1 2
I Instructions:
- 1. Check the a licant level and enter the operating test number and Form ES-0-1 event numbers tor each event ly e f8 are not ap licablefor RO applicants. ROs must serve in both the -at-the-controls(ATC) and ba/&ie-of-plant (88P) positions Instant SROs must do one scenario. including at, least two instrument or component (IC) malfunctions and one major transient. in the ATC position.
I 2.
3.
Reactivi manipulations may be conducted under normal or controlledabnormal conditions (refer l o Section 8.5.d) but must be significant,per Section C.2.a of Appendix D. *) Reactivity and normal evolutions may be replaced with additional instrument or component madunctions on a 1-for-1 basis.
Whenever practical both mstrument and component malfunctions should be included. only those that require verittab/e actions that provide insight to the applicants competence codnt toward the minimum requirements specifiea for the applicants license level in the right-handcolumns ES-301, Page 26 of 27