ML17305A333: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~C CELERATED D BUTION DEMONS T10N SYFI'EM REGULA.Y INFORMATION DISTRIBUTI
{{#Wiki_filter:~C CELERATED         D         BUTION       DEMONS         T10N     SYFI'EM REGULA     . Y INFORMATION DISTRIBUTI .. SYSTEM (RIDS)
..SYSTEM (RIDS)DOCKET 05000528 05000529 05000530 P I szzE: A+A D DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR C ENCL TITLE: OR Submittal:
ACCESSION NBR:8911020138           DOC.DATE: 89/10/25   NOTARIZED: NO             DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi                 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi               05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi               05000530 AUTH. NAME         AUTHOR AFFILIATION CONWAY,W.F.       Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME         RECIPIENT AFFILIATION Document Control Branch (Document Con                   k)
General Distribution ACCESSION NBR:8911020138 DOC.DATE: 89/10/25 NOTARIZED:
NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Con k)


==SUBJECT:==
==SUBJECT:==
Forwards Rev 3 to util justification for continued o eration caused by CEA drop events.NOTES: Standardized pl,ant.Standardized plant.S 05000528 05000529 j 05000530 h RECIPIENT ID CODE/NAME PD5 LA CHAN,T INTERNAL: ACRS NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OC/AM 01 EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 1 5 5 6 6 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M.NRR/DEST/ADS 7E NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1 1 5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 31 0 D h I, la IM Arizona Public Service Company P.O.BOX 53999~PHOENIX, ARIZONA 85072<999 WILLIAM F.CONWAY EXECUTIVE VICE PRESIDENT NUCLEAR 161-02523 WFC/RAB/JST October 25, 1989 Docket Nos.STN 50-528/529/530 Document Control Desk U.S.Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.C.20555  
Forwards Rev     3   to util justification   for continued   o P eration caused by CEA   drop events.                                                     I DISTRIBUTION CODE: A001D TITLE:  OR COPIES RECEIVED:LTR Submittal: General Distribution C
ENCL    szzE:    A+ A          D S
NOTES:
Standardized pl,ant.
Standardized plant.
05000528 05000529 05000530 j
h RECIPIENT           COPIES            RECIPIENT        COPIES ID CODE/NAME          LTTR ENCL      ID CODE/NAME     LTTR ENCL PD5 LA                   1    1    PD5 PD                1      1 CHAN,T                   5    5    DAVIS,M.              5      5 INTERNAL: ACRS                       6    6    NRR/DEST/ADS 7E        1      1 NRR/DEST/ESB 8D          1    1    NRR/DEST/ICSB          1       1 NRR/DEST/MTB 9H          1    1    NRR/DEST/RSB 8E        1      1 NRR/DOEA/TSB 11          1    1    NUDOCS-ABSTRACT       1      1 OC/AM                    1    0    OGC/HDS1               1      0 01        1    1    RES/DSIR/EIB           1       1 EXTERNAL: LPDR                      1     1     NRC PDR                1       1 NSIC                      1     1 NOTES:                                1     1 D
S TOTAL NUMBER OF COPIES REQUIRED: LTTR           33   ENCL   31
 
0 D
h I, la IM
 
Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY                                               161-02523 WFC/RAB/JST EXECUTIVEVICE PRESIDENT NUCLEAR October 25, 1989 Docket Nos.         STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.C.           20555


==Reference:==
==Reference:==
Letter from W. F. Conway (APS) to        USNRC  dated July 27, 1989.     
==Subject:==
Justification for Continued Operation as a Result of CEA Drop Events, Revision 1


Letter from W.F.Conway (APS)to USNRC dated July 27, 1989.
==Dear    Sirs:==


==Subject:==
==Subject:==
Justification for Continued Operation as a Result of CEA Drop Events, Revision 1
Palo Verde Nuclear Generating Station              (PVNGS)
Units 1, 2, and    3 Justification for Continued Operation             as a Re'suit of CEA Drop Events, Revision 3 File: 89-A-056-026 The  referenced        letter  submitted a      Justification for        Continued Operation (JCO) of the      PVNGS    units  based    on  information concerning events in which Control Element Assemblies (CEA) dropped or slipped into the core during CEA motion.
It provided a plan for operation and corrective action based on events and testing which were known at that time.
The    discovery of grounded coil assemblies in Unit 2 on October 14, 1989 has caused    APS to re-evaluate the operating plans in CEA coil assemblies and to modify the JCO.
if ground faults are known to exist Attached to this letter is Revision 3 of the subject JCO. Based on a discussion of Revision 2 with NRR and Region V personnel in a phone call on October 20, 1989, APS has clarified sections in which the Staff had questions.
If  you should have any        further questions, please call            R. A. Bernier at (602) 371-4295.
Sincerely, WFC/RAB/j le Attachment                                                                                  ot(
89'p PDR              8 89l025 A DOC<
05ppp>28 Q peu


==Dear Sirs:==
i+i 4
7 mp


==Subject:==
161-02523 WFC/RAB/JST October 25, 1989 Document   Control Desk U.. S. Nuclear Regulatory Commission Page 2 cc:   J. B. Martin       (all w/attachment)
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Justification for Continued Operation as a Re'suit of CEA Drop Events, Revision 3 File: 89-A-056-026 The referenced letter submitted a Justification for Continued Operation (JCO)of the PVNGS units based on information concerning events in which Control Element Assemblies (CEA)dropped or slipped into the core during CEA motion.It provided a plan for operation and corrective action based on events and testing which were known at that time.The discovery of grounded coil assemblies in Unit 2 on October 14, 1989 has caused APS to re-evaluate the operating plans if ground faults are known to exist in CEA coil assemblies and to modify the JCO.Attached to this letter is Revision 3 of the subject JCO.Based on a discussion of Revision 2 with NRR and Region V personnel in a phone call on October 20, 1989, APS has clarified sections in which the Staff had questions.
G. W.. Knighton T. L. Chan M. J. Davis T. J. Polich
If you should have any further questions, please call R.A.Bernier at (602)371-4295.Sincerely, WFC/RAB/j le Attachment ot(PDR A 8 89l025 89'p DOC<05ppp>28 Q peu i+i 7 mp 4 Document Control Desk U..S.Nuclear Regulatory Commission Page 2 161-02523 WFC/RAB/JST October 25, 1989 cc: J.B.Martin G.W..Knighton T.L.Chan M.J.Davis T.J.Polich (all w/attachment) i'[i ,J y~I}}
 
i'[ i
            ,J y ~ I}}

Latest revision as of 10:33, 29 October 2019

Forwards Rev 3 to Justification for Continued Operation Control Element Assembly (CEA) Drop Events, Per 891020 Telcon.Discovery of Grounded Coil Assemblies in Unit 2 on 891014 Resulted in Reevaluation of Operating Plans
ML17305A333
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/25/1989
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17305A334 List:
References
161-02523-WFC-R, 161-2523-WFC-R, NUDOCS 8911020138
Download: ML17305A333 (6)


Text

~C CELERATED D BUTION DEMONS T10N SYFI'EM REGULA . Y INFORMATION DISTRIBUTI .. SYSTEM (RIDS)

ACCESSION NBR:8911020138 DOC.DATE: 89/10/25 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Con k)

SUBJECT:

Forwards Rev 3 to util justification for continued o P eration caused by CEA drop events. I DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution C

ENCL szzE: A+ A D S

NOTES:

Standardized pl,ant.

Standardized plant.

05000528 05000529 05000530 j

h RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 CHAN,T 5 5 DAVIS,M. 5 5 INTERNAL: ACRS 6 6 NRR/DEST/ADS 7E 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB 11 1 1 NUDOCS-ABSTRACT 1 1 OC/AM 1 0 OGC/HDS1 1 0 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 D

S TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 31

0 D

h I, la IM

Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY 161-02523 WFC/RAB/JST EXECUTIVEVICE PRESIDENT NUCLEAR October 25, 1989 Docket Nos. STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.C. 20555

Reference:

Letter from W. F. Conway (APS) to USNRC dated July 27, 1989.

Subject:

Justification for Continued Operation as a Result of CEA Drop Events, Revision 1

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Justification for Continued Operation as a Re'suit of CEA Drop Events, Revision 3 File: 89-A-056-026 The referenced letter submitted a Justification for Continued Operation (JCO) of the PVNGS units based on information concerning events in which Control Element Assemblies (CEA) dropped or slipped into the core during CEA motion.

It provided a plan for operation and corrective action based on events and testing which were known at that time.

The discovery of grounded coil assemblies in Unit 2 on October 14, 1989 has caused APS to re-evaluate the operating plans in CEA coil assemblies and to modify the JCO.

if ground faults are known to exist Attached to this letter is Revision 3 of the subject JCO. Based on a discussion of Revision 2 with NRR and Region V personnel in a phone call on October 20, 1989, APS has clarified sections in which the Staff had questions.

If you should have any further questions, please call R. A. Bernier at (602) 371-4295.

Sincerely, WFC/RAB/j le Attachment ot(

89'p PDR 8 89l025 A DOC<

05ppp>28 Q peu

i+i 4

7 mp

161-02523 WFC/RAB/JST October 25, 1989 Document Control Desk U.. S. Nuclear Regulatory Commission Page 2 cc: J. B. Martin (all w/attachment)

G. W.. Knighton T. L. Chan M. J. Davis T. J. Polich

i'[ i

,J y ~ I