ML110630249: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML110630249
| number = ML110630249
| issue date = 03/04/2011
| issue date = 03/04/2011
| title = Crystal River, Inspection/Activity Plan, 03/01/2011 - 06/30/2012, Report 22
| title = Inspection/Activity Plan, 03/01/2011 - 06/30/2012, Report 22
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II

Revision as of 23:42, 12 April 2019

Inspection/Activity Plan, 03/01/2011 - 06/30/2012, Report 22
ML110630249
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/04/2011
From:
NRC/RGN-II
To:
Shared Package
ML110630236 List:
References
Download: ML110630249 (2)


Text

Inspection / Activity Plan Page 1 of 2 03/04/2011 07:04:23 Report 22 03/01/2011

-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River SGRP-SGRP ACTIVITIES 2 3 IP Steam Generator Replacement Inspection 50001 03/01/2011 04/01/2011 TFPI-805 TFPI 6 3 IP Fire Protection-NFPA 805 Transition Period [Triennial]

7111105P 04/04/2011 04/08/2011 3 IP Fire Protection-NFPA 805 Transition Period [Triennial]

7111105P 04/18/2011 04/22/2011 PSB1-RP-RAD ENVIRONMENTAL MONITORING PROGRAM 1 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/13/2011 06/17/2011 EB3-HS-HEAT SINK 1 3 IP Heat Sink Performance 7111107T 06/20/2011 06/24/2011 OL EXAM-INIITIAL EXAM PREP 5 3 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23355 08/22/2011 08/26/2011 OL EXAM-INIITIAL EXAM - WEEK 1 5 3 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23355 09/12/2011 09/16/2011 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 3 IP A lert and Notification System Testing 7111402 09/12/2011 09/16/2011 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/12/2011 09/16/2011 3 IP Emergency Action Level and Emergency Plan Changes 7111404 09/12/2011 09/16/2011 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/12/2011 09/16/2011 3 IP Performance Indicator Verification 71151 09/12/2011 09/16/2011 OL EXAM-INITIAL EXAM - WEEK 2 4 3 CRYSTAL RIVER/SEPTEMBER 2011 EXAM AT POWER FACILITIES V23355 09/19/2011 09/23/2011 PSB1-RP-RP OCCUPATIONAL WEEK 1 4 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/31/2011 11/04/2011 3 IP Occupational ALARA Planning and Controls 71124.02 10/31/2011 11/04/2011 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/31/2011 11/04/2011 3 IP Occupational Dose Assessment 71124.04 10/31/2011 11/04/2011 3 IP Radiation Monitoring Instrumentation 71124.05 10/31/2011 11/04/2011 3 IP Performance Indicator Verification 71151 10/31/2011 11/04/2011 PSB1-RP-RP OCCUPATIONAL WEEK 2 4 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/14/2011 11/18/2011 3 IP Occupational ALARA Planning and Controls 71124.02 11/14/2011 11/18/2011 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/14/2011 11/18/2011 3 IP Occupational Dose Assessment 71124.04 11/14/2011 11/18/2011 3 IP Radiation Monitoring Instrumentation 71124.05 11/14/2011 11/18/2011 3 IP Performance Indicator Verification 71151 11/14/2011 11/18/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 03/04/2011 07:04:23 Report 22 03/01/2011

-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 3 IP Identification and Resolution of Problems 71152B 01/17/2012 01/20/2012 3 IP Identification and Resolution of Problems 71152B 01/30/2012 02/03/2012 MOD-MODIFICATION INSPECTION 3 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/16/2012 04/20/2012 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/30/2012 05/04/2012 ISFSI-ISFSI PAD CONCRETE POUR 2 3 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 06/18/2012 06/22/2012 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 3 IP Exercise Evaluation 7111401 06/25/2012 06/29/2012 3 IP Emergency Action Level and Emergency Plan Changes 7111404 06/25/2012 06/29/2012 3 IP Performance Indicator Verification 71151 06/25/2012 06/29/2012 This report does not include INPO and OUTAGE activities.