| issue date = 05/02/1988
| issue date = 05/02/1988
| title = Special Rept:On 880412,vent Stack 5A wide-range Gas Monitor Declared Inoperable.Caused by Loss of Sample Flow That Would Occur While Attempting Calibr of Sample Flow Transmitter. Correct low-range Flow Transmitter Ordered
| title = Special Rept:On 880412,vent Stack 5A wide-range Gas Monitor Declared Inoperable.Caused by Loss of Sample Flow That Would Occur While Attempting Calibr of Sample Flow Transmitter. Correct low-range Flow Transmitter Ordered
| author name = WATSON R A
| author name = Watson R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 03:47, 18 June 2019

Special Rept:On 880412,vent Stack 5A wide-range Gas Monitor Declared Inoperable.Caused by Loss of Sample Flow That Would Occur While Attempting Calibr of Sample Flow Transmitter. Correct low-range Flow Transmitter Ordered
ML18022A644
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/02/1988
From: Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-880107-(O), NUDOCS 8805050121
Download: ML18022A644 (8)


Text

Attachment 1 Carolina power a Light Company HARRIS NUCLEAR PROJECT P.0.Box 165 New Hill, North Carolina 27562 gg/os/88 File Number'SHF/10-13510C Letter Number'HO-880107 (0)United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO.50-400 LICENSE NO.NPF-63 NRC 14-DAY SPECIAL REPORT Gentlemen:

In accordance with Technical Specifications 3.3.3.6 and 6.9.2 for the Shearon Harris Nuclear Power Plant, Unit No.1, Carolina Power&Light Company hereby submits this Special Report.This Special Report concerns operability of a radiation monito'r.Very truly yours, R, A.Watson Vice President Harris Nuclear Project JRJ:msb Enclosuxe cc'Dr.J.N.Grace (NRC"RII)Mr.B.Buckley (NRR)Mr.G.Maxwell (NRC-SHNPP)

MEM/HO-8801070/1/OS1 Radioactive Gaseous Effluent Monitor Special Report~Back round'.Vent stack 5A wide range gas monitor, (WRGM)01WV-3547-1 was declared inoperable under Technical Specification 3.3.3.11, Radioactive Gaseous Effluent Monitoring Instrumentation, on April 12, 1988, at 0830.This was due to the loss of sample flow that would result during calibration of the sample flow meter.Efforts to return the monitor to operable status within 7 days have been unsuccessful, thus the need for this special report, which is submitted pursuant to Technical Specification 3.3.3.6, Action C.Descri tion of Event: On April 12, 1988, the sample flow meter was scheduled to undergo a routine calibration.

At 0830 the equipment was declared inoperable and the calibration (MST-I0377) was started.Iamediately upon starting, it was discovered that the procedure was in error, and a Temporary Change was needed to correct the procedure.

This process was completed and the calibration was restarted at 0848 on April 13, 1988.At 1100 the calibration was stopped again due to an incorrect data table in the procedure.

This required an Advance Change to be made to the procedure and it was not approved until April 14, 1988.-The procedure was restarted at 1230 on April 14, 1988, and continued until it was found that the Low Range flow transmitter could not be calibrated.

A work request was initiated to replace the defective transmitter, and a subsequent check of spare parts revealed that a replacement part of the same type was not available.

A transmitter of a different type was located but was not approved for use, so a replacement transmitter has been ordered.Calibration continued until April 19, 1988, when it was complete with the exception of the Low Range flow transmitter calibration and final closeout checks.The compensatory actions required by Technical Specifications 3.3.3.11 Table 3.3-13, Actions 46, 47, and 49 required an auxiliary sampler to be hooked up to continuously monitor the'tack while the installed effluent monitor was inoperable.

This is being performed and all compensatory measures for gaseous effluent and accident monitoring for stack 5A were satisfied.

MEM/HO-8801070/3/OS1 Cause: The monitor was declared inoperable initially due to the loss of sample flow that.would occur while attempting calibration of the sample flow transmitter.

The primary cause of the delay in restoring the monitor to service is the unexpected problems in procuring the correct type of flow transmitter.

Two transmitters were received from Kurz Instruments, Inc.on April 22, but both were found to be defective and had to be returned to the vendor.The cause of the failure of the Low Range flow transmitter, which was discovered during the calibration of the sample flow meter, is not known'orrective Action: The corrective actions taken to restore the monitor to operable'status were to order a new Low Range flow transmitter of the correct type and complete the calibration procedure.

The monitor will be returned to service as soon as a workable transmitter is received from Kurz Instruments.

A scheduled completion date is not available at this time but will be provided later in a supplemental report.MEM/H0-8801070/4/OS1 AC CEISRATZD DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET 05000400 ACCESSION NBR:8805050121 DOC.DATE: 88/05/02 NOTARIZED-NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit.1, Carolina AUTH;NAME AUTHOR AFFILIATION WATSON,R.A.

Carolina Power&Light'Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept:on 880412,vent stack 5A wide range gas monitor declared inoperable.

DISTRIBUTION CODE: IE22D COPIES RECEIVED ITR ZSCL i EIZE~TITLE: 50.73 Licensee Event Report (LER), Incident.Rpt, etc.NOTES:Application for permit renewal filed.05000400 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS MICHELSON AEOD/DOA LEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB SD NRR/DEST/MEB 9H NRR/DEST/PSB SD, NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10~~DI-Sg B9A 02 RES/DE/EIB RGN2 FILE 01 EXTERNAL: EG&G GROH,M H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1 1 1 1 1 1 1 1 2 2 1 1 1 0 1 1, 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4'4 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD ACRS MOELLER AEOD/DSP/NAS AEOD/DS P/TPAB DEDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB SE NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 RES TELFORD,J RES/DRPS DIR FORD BL1)G SOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1 1 2 2 1 1.1 1 1 1 1 1 1 1 1 1.1 1 1 1 1 2 2 1 1 1 1 1'1 1 1 1 1 1 A D TOTAL NUMBER OF COPIES REQUIRED: LTTR'5 ENCL 44 C~L Carolina Power 8 Light Company*HARRIS NUCLEAR PROJECT P.O.Box 165 New Hill, North Carolina 27562 File Number'.SHF/10-13510C Letter Number'.-HO-880107 (0)United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC"'0555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO.'50-400 LICENSE NO.NPF-63 NRC 14-DAY SPECIAL REPORT Gentlemen:

In accordance with Technical Specifications 3.3.3.6 and 6.9.2 for the Shearon Harris Nuclear Power Plant, Unit No.1, Carolina Power il: Light Company hereby submits this Special Report.This Special Report concerns operability of a radiation monitor.Very truly yours, JRJ:msb Enclosure R.A.Watson Vice President Harris Nuclear Project cc.'Dr.J.N.Grace (NRC-RII)Mr.B.Buckley (NRR)Mr.G.Maxwell (NRC-SHNPP) 8805050121 880502 PDR ADOCK 05000400 DCD MEM/HO-8801070/1/OS1 bcc.'r.H.R.Banks Mr.R.K..Buckles (LIS)Mr.=C.Carmichael (2)Mr.R.M.Coats Mr.C.W.Crawford Mr.A.B.Cutter Mr.G.L.'Forehand Mr.B.J.Furr Mr.L.'.Gucwa Mr.J.L.Harness Mr.Q.J.Hindman, Jr.Mr.D.E.Hollar Dr.J.D.E.Jeffries Mr.L.I.Loflin Mr.R.E.Lumsden Mr.D;C.McCarthy Mr.C.H.Moseley, Jr.Mr.R.B.Richey Mr.R.B.Starkey, Jr.Mr.D.L.Tibbitts Mr.R.A.Watson Mr.B.H.Webster Mr.B.M.Williams Mr.S.R.Zimmerman File.'HI/A-2D SHNPP Reg.Compliance (HX-0941)Day File Document Services MEM/HO-8801070/2/OS1 Radioactive Gaseous Effluent Monitor S'pecial Report~Back round: Vent stack 5A wide range gas monitor, (WRGM)01WV-3547-1 was declared inoperable under-=Technical Specification-3.3.3.11, Radioactive

'Gaseou's'ffluent Monitoring Instrumentation, on April'12, 1988, at 0830.Thxs was due to the loss'f sample flow that would result during calibration of.the sample flow meter.Efforts to return the monitor to operable status within 7 days have been unsuccessful, thus.the need, for this special=report, which is submitted pursuant to Technical Specification 3.3.3.6, Action C.Descry tion of Event: On April 12, 1988, the sample flow meter.was scheduled to undergo a routine calibration.

At 0830 the equipment:

was declared inoperable and the calibration (MST-I0377) was started.Immediately upon starting, it was discovered that the procedure was in error, and a Temporary Change was needed to correct the procedure.

This process was completed and the calibration was restarted.

at 0848 on April 13, 1988.At 1100 the calibration was stopped again due to an incorrect-data table in the procedure.

This required an Advance Change to be made to the procedure and it was not approved until April 14, 1988.The procedure was restarted at 1230 on April 14, 1988, and continued until it was found that the Low Range flow transmitter could-not be calibrated.

A work request was initiated to replace the defective transmitter, and a subsequent check of spare parts revealed that a replacement part of the same type was not available.

A transmitter of a different type was located but was not approved for use, so a replacement transmitter has been ordered.Calibration continued until April 19,.1988, when it was complete with the.,exception of the Low Range flow transmitter calibration and final closeout checks.The compensatory actions requ'ired by Technical Specifications 3.3.3.11 Table 3.3-13, Actions 46, 47, and 49 required an auxiliary sampler to be hooked up to continuously monitor the stack-while the installed effluent monitor was inoperable.

This is being performed and'all compensatory measures'for gaseous effluent and accident monitoring for stack 5A were satisfied."MEM/HO-8801070/3/OS1 Cause.The monitor wa's declared inoperable initially due to the loss of sample flow that would occur while attempting calibration of the sample flow transmitter.

The primary cause of the delay in restoring the monitor to service is the unexpected problems in procuring the correct type of flow transmitter.

Two transmitters were waceivM buxom Aux', Zns~enks, 2nc.~~xil 22, Nut both were found to be defective and had to be returned to the vendor.The cause of the failure of the Low Range flow transmitter, which was discovered during the calibration of the sample flow meter, is not known.Corrective Action: The corrective actions taken to restore the monitor to operable status were to order a new Low Range flow transmitter of the correct type and complete the calibration procedure.

The monitor will be returned to service as soon as a workable transmitter is received from Kurz Instruments.

A scheduled corn'pletion date is'ot available at this time but will be provided later in a supplemental report.MEM/:iO-8801070/4/OS1