ACCELERATED DIS UTION DEMON ION SYSTEM ii I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9106200177 DOC.DATE: 91/06/14 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)-
SUBJECT:
Special rept:on 910528,WPB Stack 5 Exhaust Sys Radiation Monitor declared inoperable when monitor removed from svc to perform test procedure.
DISTRIBUTION CODE:
IE22D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:Application for permit renewal file'd.
05000400 RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.
INTERNAL: ACNW AEOD/DOA AEOD/ROAB/DSP NRR/DET/EMEB 7E NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB8H3 NRR/DST/SRXB 8E RES/DSIR/EIB EXTERNAL': EGGG BRYCE,J.H NRC PDR NSIC POOREiW COPIES LTTR ENCL 1
1 1
1 2
2 1
1 2
2 1
1.
1 1
2 2
1 1
1 1
1 1
3 3 '
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD ACRS AEOD/DSP/TPAB NRR/DET/ECMB 9H NRR/DLPQ/LHFB10 NRR/DOEA/OEAB NRR/DST/SELB 8D NRR/DS ~LB8Dl REG I~
RGN2 E
01 L ST LOBBY WARD NSIC MURPHYiG A NUDOCS FULL TXT COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP VS TO REDUCE WASIH CONTACfTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISEIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 33 ENCL 33
'I
CPKL Carolina Power & Lighl Company 0
HARRIS NUCLEAR PROJECT P.O.
Box 165 New Hill, North Carolina 27562 JUN 1
4 1991 Letter Number:
HO-910080 (0)
United States Nuclear Regulato'ry Commission ATTN:
Document Control Desk Washington, DC 20555 HARRIS NUCLEAR PROJECT UNIT 1 DOCKET NO. 50-400, LICENSE NO. NPP-63 NRC 14-DAY SPECIAL REPORT In accordance with Technical Specification 3.3.3.6 and 6.9.2 for the Shearon Harris Nuclear power Plant, Unit No. 1, Carolina Power
& Light Company hereby submits this Special Report.
This Special Report concerns the operability of a radiation monitor.
Very truly yours, R. B. Richey Vice President'arris Nuclear Project MRH:dmw Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Ms. B. L. Mozafari (NRR)
Mr. J.
E. Tedrow (NRC SHNPP)
MEM/HO-9100800/1/OS1 9106200177 910614 PDR ADGCK 05000400 S
k
ACCIDENT RADIATION MONITOR SPECIAL REPORT Descri tion of Event On May 28,
- 1991, at 16:37, the Waste Processing Building (WPB)
Stack 5
Exhaust System Radiation
- Monitor, RM-*1WV-3546-1, was declared inoperable when the monitor was removed from service to perform test procedure MST-I0375, WPB Stack 5 Accident Monitor RM->1WV-3546-1 Channel Calibration.
A failure identified during performance of this test procedure resulted in the monitor not being returned to service within 7
days.
This monitor is identified in Technical Specification Table 3-3.10 as Item 24(a).
The compensatory actions required by Technical Specifications to allow continued effluent releases are'(1) noble gas grab sampling every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and (2) continuous particulate and iodine sampling with auxiliary sampling equipment.
These compensatory actions were performed while the monitor was inoperable.
The monitor was out of service for greater than 7
days; thus a
Special Report is required to be submitted per the Technical-Specifications.
Cause/Corrective Action On May 28, 1991, radiation monitor RM-*1WV-3546-1 was taken out of service to perform MST-I0375.
During performance of this surveillance
- test, a
failed remote grab sample timer was identified."
The timer failure was due to failed capacitor which is now obsolete.
An alternate capacitor was identified and evaluated by the CP&L Nuclear Engineering Department as an acceptable replacement.
The failed capacitor is currently being replaced to correct the timer problem.
Following completion of
This radiation monitor should be operable by June 21,
- 1991, in the meantime compensatory actions will be continued.