ML18005A605
| ML18005A605 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/19/1988 |
| From: | Watson R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| HO-880144(O), IEB-88-002, IEB-88-2, NUDOCS 8809300132 | |
| Download: ML18005A605 (3) | |
Text
ACCELERATED DI>
IBUTION DEMONSTRATION SYSTEM I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8809300132 DOC.DATE: 88/09/19 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION WATSON,R.A.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Special rept:on 880912,first in-service insp of steam generators completed.
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR
(
ENCL J
SIZE:
P TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:Application for permit renewal filed.
DOCKET 05000400 05000400 S
RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS MICHELSON ACRS WYLIE AEOD/DSP/NAS AEOD/DSP/TPAB DEDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7
NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RES TELFORD,J RES/DSIR/EIB EXTERNAL: EG&G WILLIAMS,S H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
2 1
1 1
1 1
1 4
4 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD ACRS MOELLER AEOD/DOA AEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 RR/~S jSIB 9A REC FILE/
02
~DSIR DEPY RGN2 FILE 01 FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1
1 2
2 1
1 2
2 1
1 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 A
A D
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 46 ENCL 45
Form 244 Carolina Power & Light Company Company Correspondence HARRIS NUCLEAR PROJECT P. 0.
Box 165 New Hill, North Carolina 27562 SEP1 9 1988 File Number.'HF/10-13510C Letter Number:
HO-880144 (0)
United States Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 NRC 15-DAY SPECIAL REPORT Gentlemen.'n accordance with Technical Specifications 4.4.5.5.a and 6.9.2 for Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power 6
Light Company hereby transmits this Special Report.
This Special Report identifies the number of tubes plugged in each steam generator following the first in"service inspection.
Very truly yours, R. A. Watson Vice President Harris Nuclear Project AJH:vdj cc'.
Dr. J. N. Grace (NRC-RII)
Mr. B. Buckley (NRR)
Mr. B. Bradford (NRC-SHNPP) 88098VV1 88 8Vb'1 9 K OSOOOOOO PDC MEM/HO-8801440/1/Osl
SPECIAL REPORT - TECHNICAL SPECIFICATION 4.4.5.5.a The first in-service inspection of the Shearon Harris Nuclear Power Plant steam generators was completed on September 12, 1988.
All steam generators were'inspected in accordance with the schedule set forth in Table 4.4-1 of Technical Specifications and the requirements of I.E.Bulletin 88-002.
The following number of tubes were plugged in each steam generator.
Steam Generator No. of Tubes Plu ed 1A-SN 1B-SN 1C-SN The 45 day reporting requirement of I.E.Bulletin 88-002 will be submitted under separate cover.
The complete steam generator tube in-service inspection results will be submitted within 12 months as required by Specification 4.4.5.5.b.
MEM/HO-8801440/2/Osl