| title = Interim 10 CFR Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project
| title = Interim 10 CFR Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project
| author name = DePierro D
| author name = Depierro D
| author affiliation = CB&I
| author affiliation = CB&I
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:9CB&I128 South Tryon StreetCharlotte, NC 28202Tel: +1 704 343 7500www.CBI.com10 CFR 21.21August 27, 2014U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555-0001
{{#Wiki_filter:9 CB&I 128 South Tryon Street Charlotte, NC 28202 Tel: +1 704 343 7500 www.CBI.com 10 CFR 21.21 August 27, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
INTERIM 10 CFR PART 21 REPORT REGARDING SUBMODULE ANDEMBEDMENT DEVIATIONS FOR V.C. SUMMER UNIT 2 AP1000 PROJECTThe attachment to this letter provides an interim report in accordance with 10 CFR 21.21pertaining to submodule and embedment deviations for the V.C. Summer Unit 2 AP1000 nuclearproject. Based on information described in site quality control inspection reports, deviationswere identified in the Unit 2 CA-01 and CA-05 structural submodules, and also in some safety-related embedments.Evaluation of reportability in accordance with 10 CFR Part 21 was not able to be completedwithin the 60-day evaluation period due to the recent discovery that the initial evaluation of theseconditions incorrectly determined that no additional evaluation was required. These conditionswere discovered during reviews conducted due to discovery of other similar conditions. It iscurrently expected that the evaluation of these conditions will be completed by October 21, 2014.If you have any questions pertaining to this information, please contact Curtis Castell, LicensingManager, at 980-321-8314.Sincerely,Don DePierroSenior Vice President, Nuclearcc:. Regional Administrator, USNRC, Region IIAttachmentp~-o, .I
INTERIM 10 CFR PART 21 REPORT REGARDING SUBMODULE AND EMBEDMENT DEVIATIONS FOR V.C. SUMMER UNIT 2 AP1000 PROJECT The attachment to this letter provides an interim report in accordance with 10 CFR 21.21 pertaining to submodule and embedment deviations for the V.C. Summer Unit 2 AP1000 nuclear project. Based on information described in site quality control inspection reports, deviations were identified in the Unit 2 CA-01 and CA-05 structural submodules, and also in some safety-related embedments.
* Attachment to Letter Dated August 27, 2014Page 1 of 2INTERIM 10 CFR PART 21 REPORT REGARDING STRUCTURAL SUBMODULE ANDEMBEDMENT DEVIATIONS FOR V.C. SUMMER UNIT 2 AP1000 PROJECTThis report is being provided as an interim report in accordance with 10 CFR 21.21.(i) Name and address of the individual or individuals informing the Commission.Mr. Don DePierroCB&I Nuclear128 S. Tryon St., Suite 1000Charlotte, NC 28202(ii) Identification of the facility, the activity, or the basic component supplied for such facility or suchactivity within the United States which fails to comply or contains a defect.No basic components have been determined to fail to comply or contain a defect. This is an interimreport. The identified deviations pertain to V.C. Summer Unit 2 API000 nuclear project CA-01 and CA-05 structural submodules, and also some safety-related embedments for the Nuclear Island AuxiliaryBuilding walls and floors.(iii) Identification of the finn constructing the facility or supplying the basic component which fails tocomply or contains a defect.No basic components have been determined to fail to comply or contain a defect. This is an interimreport. The deviations pertaining to submodule fabrication are associated with structural submodulessupplied by CB&I Lake Charles, 3191 West Lincoln Rd., Lake Charles, LA 70605. The embedmentswith deviations were supplied by Cives Steel Company, 102 Airport Road, Thomasville, GA 31757.(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created bysuch defect or failure to comply.No basic components have been determined to fail to comply or contain a defect. This is an interimreport. The deviations pertaining to CA-01 and CA-05 structural submodules include unsatisfactorywelds, stud spacing, and surface indications. The deviations pertaining to the safety-related embedmentsfor the Nuclear Island Auxiliary Building walls and floors include unsatisfactory reinforcement welds,bent studs, and plate dimensions. Evaluation of these conditions is expected to be completed by October21, 2014.(v) The date on which the information of such defect or failure to comply was obtained.The discovery dates of the deviations based on the dates of the inspection reports are June 5 and 6, 2014.Evaluation of reportability in accordance with 10 CFR Part 21 was not able to be completed within the 60day evaluation period due to the recent discovery that the initial evaluation of these conditions incorrectlydetermined that no additional evaluation was required. This condition was discovered during reviewsconducted due to discovery of other similar conditions.
Evaluation of reportability in accordance with 10 CFR Part 21 was not able to be completed within the 60-day evaluation period due to the recent discovery that the initial evaluation of these conditions incorrectly determined that no additional evaluation was required. These conditions were discovered during reviews conducted due to discovery of other similar conditions. It is currently expected that the evaluation of these conditions will be completed by October 21, 2014.
A I..Attachment to Letter Dated August 27, 2014Page 2 of 2(vi) In the case of a basic component which contains a defect or fails to comply, the number and locationof these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, orbeing manufactured for one or more facilities or activities subject to the regulations in this part.No basic components have been determined to fail to comply or contain a defect. This is an interimreport.(vii) The corrective action which has been, is being, or will be taken; the name of the individual ororganization responsible for the action; and the length of time that has been or will be taken to completethe action.No basic components have been determined to fail to comply or contain a defect. This is an interimreport.(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic componentthat has been, is being, or will be given to purchasers or licensees.None at this time.(ix) In the case of an early site permit, the entities to whom an early site permit was transferred.Not applicable.}}
If you have any questions pertaining to this information, please contact Curtis Castell, Licensing Manager, at 980-321-8314.
Sincerely, Don DePierro Senior Vice President, Nuclear cc:. Regional Administrator, USNRC, Region II Attachment
      , .
* I p~-o
 
Attachment to Letter Dated August 27, 2014 Page 1 of 2 INTERIM 10 CFR PART 21 REPORT REGARDING STRUCTURAL SUBMODULE AND EMBEDMENT DEVIATIONS FOR V.C. SUMMER UNIT 2 AP1000 PROJECT This report is being provided as an interim report in accordance with 10 CFR 21.21.
(i) Name and address of the individual or individuals informing the Commission.
Mr. Don DePierro CB&I Nuclear 128 S. Tryon St., Suite 1000 Charlotte, NC 28202 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
No basic components have been determined to fail to comply or contain a defect. This is an interim report. The identified deviations pertain to V.C. Summer Unit 2 API000 nuclear project CA-01 and CA-05 structural submodules, and also some safety-related embedments for the Nuclear Island Auxiliary Building walls and floors.
(iii) Identification of the finn constructing the facility or supplying the basic component which fails to comply or contains a defect.
No basic components have been determined to fail to comply or contain a defect. This is an interim report. The deviations pertaining to submodule fabrication are associated with structural submodules supplied by CB&I Lake Charles, 3191 West Lincoln Rd., Lake Charles, LA 70605. The embedments with deviations were supplied by Cives Steel Company, 102 Airport Road, Thomasville, GA 31757.
(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
No basic components have been determined to fail to comply or contain a defect. This is an interim report. The deviations pertaining to CA-01 and CA-05 structural submodules include unsatisfactory welds, stud spacing, and surface indications. The deviations pertaining to the safety-related embedments for the Nuclear Island Auxiliary Building walls and floors include unsatisfactory reinforcement welds, bent studs, and plate dimensions. Evaluation of these conditions is expected to be completed by October 21, 2014.
(v) The date on which the information of such defect or failure to comply was obtained.
The discovery dates of the deviations based on the dates of the inspection reports are June 5 and 6, 2014.
Evaluation of reportability in accordance with 10 CFR Part 21 was not able to be completed within the 60 day evaluation period due to the recent discovery that the initial evaluation of these conditions incorrectly determined that no additional evaluation was required. This condition was discovered during reviews conducted due to discovery of other similar conditions.
 
A I..
Attachment to Letter Dated August 27, 2014 Page 2 of 2 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.
No basic components have been determined to fail to comply or contain a defect. This is an interim report.
(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
No basic components have been determined to fail to comply or contain a defect. This is an interim report.
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
None at this time.
(ix) In the case of an early site permit, the entities to whom an early site permit was transferred.
Not applicable.}}

Latest revision as of 01:24, 4 November 2019

Interim 10 CFR Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project
ML14255A017
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/27/2014
From: Depierro D
CB&I
To:
Document Control Desk, Office of New Reactors
References
Download: ML14255A017 (3)


Text

9 CB&I 128 South Tryon Street Charlotte, NC 28202 Tel: +1 704 343 7500 www.CBI.com 10 CFR 21.21 August 27, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

INTERIM 10 CFR PART 21 REPORT REGARDING SUBMODULE AND EMBEDMENT DEVIATIONS FOR V.C. SUMMER UNIT 2 AP1000 PROJECT The attachment to this letter provides an interim report in accordance with 10 CFR 21.21 pertaining to submodule and embedment deviations for the V.C. Summer Unit 2 AP1000 nuclear project. Based on information described in site quality control inspection reports, deviations were identified in the Unit 2 CA-01 and CA-05 structural submodules, and also in some safety-related embedments.

Evaluation of reportability in accordance with 10 CFR Part 21 was not able to be completed within the 60-day evaluation period due to the recent discovery that the initial evaluation of these conditions incorrectly determined that no additional evaluation was required. These conditions were discovered during reviews conducted due to discovery of other similar conditions. It is currently expected that the evaluation of these conditions will be completed by October 21, 2014.

If you have any questions pertaining to this information, please contact Curtis Castell, Licensing Manager, at 980-321-8314.

Sincerely, Don DePierro Senior Vice President, Nuclear cc:. Regional Administrator, USNRC, Region II Attachment

, .

  • I p~-o

Attachment to Letter Dated August 27, 2014 Page 1 of 2 INTERIM 10 CFR PART 21 REPORT REGARDING STRUCTURAL SUBMODULE AND EMBEDMENT DEVIATIONS FOR V.C. SUMMER UNIT 2 AP1000 PROJECT This report is being provided as an interim report in accordance with 10 CFR 21.21.

(i) Name and address of the individual or individuals informing the Commission.

Mr. Don DePierro CB&I Nuclear 128 S. Tryon St., Suite 1000 Charlotte, NC 28202 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.

No basic components have been determined to fail to comply or contain a defect. This is an interim report. The identified deviations pertain to V.C. Summer Unit 2 API000 nuclear project CA-01 and CA-05 structural submodules, and also some safety-related embedments for the Nuclear Island Auxiliary Building walls and floors.

(iii) Identification of the finn constructing the facility or supplying the basic component which fails to comply or contains a defect.

No basic components have been determined to fail to comply or contain a defect. This is an interim report. The deviations pertaining to submodule fabrication are associated with structural submodules supplied by CB&I Lake Charles, 3191 West Lincoln Rd., Lake Charles, LA 70605. The embedments with deviations were supplied by Cives Steel Company, 102 Airport Road, Thomasville, GA 31757.

(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

No basic components have been determined to fail to comply or contain a defect. This is an interim report. The deviations pertaining to CA-01 and CA-05 structural submodules include unsatisfactory welds, stud spacing, and surface indications. The deviations pertaining to the safety-related embedments for the Nuclear Island Auxiliary Building walls and floors include unsatisfactory reinforcement welds, bent studs, and plate dimensions. Evaluation of these conditions is expected to be completed by October 21, 2014.

(v) The date on which the information of such defect or failure to comply was obtained.

The discovery dates of the deviations based on the dates of the inspection reports are June 5 and 6, 2014.

Evaluation of reportability in accordance with 10 CFR Part 21 was not able to be completed within the 60 day evaluation period due to the recent discovery that the initial evaluation of these conditions incorrectly determined that no additional evaluation was required. This condition was discovered during reviews conducted due to discovery of other similar conditions.

A I..

Attachment to Letter Dated August 27, 2014 Page 2 of 2 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.

No basic components have been determined to fail to comply or contain a defect. This is an interim report.

(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

No basic components have been determined to fail to comply or contain a defect. This is an interim report.

(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

None at this time.

(ix) In the case of an early site permit, the entities to whom an early site permit was transferred.

Not applicable.