10CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification
ML21187A124
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/28/2021
From: Bolt T
Paragon Energy Solutions
To: Hoc H
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21187A124 (2)


Text

Hoc, HOO X From: Tracy Bolt <TBolt@ParagonES.com>

Sent: Monday, June 28, 2021 14:59 To: Hoc, HOO X

Subject:

[External_Sender] P21-06102021 Notification Attachments: VC Summer 10CFR part 21 formal notification P21-06102021, R0 6-28-2021.pdf 10CFR Part 21 Notification: P2106102021, Rev. 0 Ref. P2106102021IN, Rev. 0 (ML21174A009)

Subject:

Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification Pursuant to 10CFR 21.21 (b) Paragon Energy Solutions, LLC is providing written notification of the identification of a deviation. On 6/24/2021, Paragon has determined that we do not have the capability to perform the evaluation to determine if the deviation, if left uncorrected, could create a substantial safety hazard. VC Summer has been notified within five working days of this determination so that they can evaluate the deviation or failure to comply, pursuant to § 21.21(a).

Regards, Tracy Bolt Chief Nuclear Officer, CNO (940)468-9151 (C) 817-284-0077 (O) 817-686-1418 (D)l www.ParagonES.com The information in the subject deviation report is not confidential, you have the authority to strike out the words is confidential.

Confidentiality Note: The information contained in this message (and attachments) is confidential and may be legally privileged. The message is intended solely for the addressee(s). If you are not the intended recipient, you are hereby notified that any use, dissemination, or reproduction is strictly prohibited and may be unlawful. If you are not the intended recipient please contact the sender by return email and destroy all copies of the original message and attachments.

1

Date: 6/28/2021 To: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Fax Number (301)816-5151 10CFR Part 21 Notification: P21-06102021, Rev. 0 Ref. P21-06102021-IN, Rev. 0 (ML21174A009)

Subject:

Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification Pursuant to 10CFR 21.21 (b) Paragon Energy Solutions, LLC is providing written notification of the identification of a deviation. On 6/24/2021, Paragon has determined that we do not have the capability to perform the evaluation to determine if the deviation, if left uncorrected, could create a substantial safety hazard. VC Summer has been notified within five working days of this determination so that they can evaluate the deviation or failure to comply, pursuant to § 21.21(a).

Condition that requires evaluation:

NLI 280-ton Custom Chillers, Serial Numbers XHX-0001A / XHX-0001B / XHX-0001C.

The Chillers were originally supplied by NLI to VC Summer station under PO: NU-02SR726683 in 2010.

Ref. P21-06102021-IN, Rev. 0 (ML21174A009)

Name and address of the individual or individuals informing the Commission.

Tracy Bolt, Chief Nuclear Officer Paragon Energy Solutions, LLC 7410 Pebble Drive Ft. Worth, TX 76118 Please contact me with any questions or comments.

Sincerely, Tracy Bolt Chief Nuclear Officer Paragon Energy Solutions 817-284-0077 tbolt@paragones.com Paragon Energy Solutions 7410 Pebble Drive

  • 76118 817-284-0077
  • Fax 817-590-0484 Page 1 of 1