MONTHYEARML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17142A3222017-05-15015 May 2017 Part 21 - Potential Defect in Grayboot Socket Contacts ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML16174A3952016-06-21021 June 2016 Fisher Information Notice, (FIN) 2016-05 - Insufficient Valve Cage Hardfacing ML16127A5952016-05-0404 May 2016 Rotork Controls Inc. Part 21 Notification Concerning V12 (Pt No. N69-921) and K5 (N69-838 & N69-926) Safety Related Micro Switches ML14335A2952014-11-13013 November 2014 Interim 10 CFR Part 21 Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2, AP1000 Project ML14255A0172014-08-27027 August 2014 Interim 10 CFR Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project ML14090A4322014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14090A4332014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Justification of Use of Prorate Spring in PV-62 ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0701704602007-01-0808 January 2007 10CFR21 for FMEA and Pre-installation Setup of Woodward Digital Reference Unit (Dru); Fairbanks Morse Engine Reporting Id# 06-05 ML0602502602006-01-12012 January 2006 Attachment to 10CFR21 for Woodward Dru Fm Id# 06-01 ML0520803682005-07-26026 July 2005 Tom Milton, Email, Interim Report-Cutler Hammer Components ML0327507562003-09-30030 September 2003 Part 21 Report Regarding the Failure of the Eaton Cutler-Hammer Freedom Series Heater Pack Due to a Possible Defect in the Weld Which Joins the Screw Terminal to the Heater Coil 2024-05-17
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping ML23087A1292023-03-23023 March 2023 Trillium Valves USA - Part 21 Written Notification - Event Number: 56420 ML23082A1122023-03-17017 March 2023 10 CFR Part 21 Report – Inconsistent Crimping of Motor Leads to Ring Terminal Connectors and Failure to Comply. Trillium Valves USA Part 21 Evaluation I211003 ML22089A2442022-03-30030 March 2022 10 CFR 21 Report- Feedwater Isolation Valve Poppet Seal Failure ML21187A1242021-06-28028 June 2021 10CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification ML20366A0482020-12-0707 December 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0114, Rev. 1 NL-20-0764, Initial 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-06-24024 June 2020 Initial 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19072A0632019-03-0606 March 2019 10 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X ML18225A1182018-07-27027 July 2018 Ametek Solidstate Controls - Notification of Potential Defect-10CFR Part 21 ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17333A3792017-11-21021 November 2017 Engine Systems, Inc. 10 CFR 21 Reportable Notification on a Power Supply (P/N 2938604) ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17142A3222017-05-15015 May 2017 Part 21 - Potential Defect in Grayboot Socket Contacts ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17032A0802016-12-30030 December 2016 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0114, Rev. 0 ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML16349A5902016-12-0202 December 2016 Interim 10 CFR Part 21 Report Regarding a Piping Spool Weld Nonconformance for AP1000 Project ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16174A3952016-06-21021 June 2016 Fisher Information Notice, (FIN) 2016-05 - Insufficient Valve Cage Hardfacing ML16188A3772016-06-21021 June 2016 Part 21 - Insufficient Valve Cage Hardfacing ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16127A5952016-05-0404 May 2016 Rotork Controls Inc. Part 21 Notification Concerning V12 (Pt No. N69-921) and K5 (N69-838 & N69-926) Safety Related Micro Switches ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14335A2952014-11-13013 November 2014 Interim 10 CFR Part 21 Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2, AP1000 Project ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14255A0172014-08-27027 August 2014 Interim 10 CFR Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project ML14169A0302014-06-15015 June 2014 Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect ML14099A5062014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Testing of PV-62 ML14090A4332014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Justification of Use of Prorate Spring in PV-62 ML14090A4322014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14090A4312014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Testing of PV-62 ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML14034A1892014-01-23023 January 2014 Part 21 - Loose Battery Vent Assemblies ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12075A1062012-03-14014 March 2012 Notification of Potential Part 21 Re Defect on Arvan Electrical Terminal Blocks ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations 2024-01-18
[Table view] |
Text
PENTAIR Brian Martin Quality Assurance Manager PENTAIR VALVES & CONTROLS 508-594-4463 (direct) 508-594-4249 (fax) 508-298-4603 (mobile)
Brian.Martin@Pentair.com Mansfield, MA 02048 www.pentair.com March 27, 2014 VIA REGULAR MAIL:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 VIA OVERNIGHT DELIVERY:
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746
Subject:
Interim Report- 10CFR 21 Evaluation regarding potential deficiencies in justification of use of prorate spring in PV-62 The purpose of this letter is to provide the NRC a report in general conformity to the requirements of 10CFR 21 Part 21.21 (a)(2).
This report is a result of NRC Inspection Report No. 99901431/2013-201 dated 20 August 2013 and Pentair Corrective Action Report (CAR 674). In general CAR 674 determined that customer was not properly informed of the reason for the use of a prorated spring used for testing the valve. The subject valve (PV-62) of CAR 674 and its test procedure were modified to explicitly state the use of the prorate spring for testing due to the limitations of the test facility. The customer did not have an active reactor. The customer approved the test procedure and the resulting test report.
This report is to inform the NRC of the potential 10CFR 21 evaluation. Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby is notifying the NRC of this potential and the affected licensees of the results of the 10CFR 21 evaluation.
Required information as per 10CFR Part 21.21 (d)(4) follows:
(i) Name and Address of the individual or individuals informing the Commission:
1
PENTAIR Brian L. Martin Quality Assurance Manager Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby Mansfield Operations 55 Cabot Blvd Mansfield, MA 02048 (ii) Identification of the facility, the activity, or basic component supplied for such facility or such activity within the Unites States which fails to comply or contains a defect.
Safety valve PV-62 seismic testing.
(iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby Mansfield Operations 55 Cabot Blvd Mansfield, MA 02048 (iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
PV-62 is a valve that had a QME-1 requirement of seismic load testing.
The valve was sent out for a natural frequency scan to identify if the valve is considered a rigid body. The requirement for rigid body is no natural frequencies below 33 Hz. If the valve meets the rigid body requirement, the valve can proceed to a static load test (versus a dynamic load test). PV-62 meets the requirement of no natural frequencies below 33 Hz. PV-62 is not completely symmetrical and has different natural frequencies in the different directions. Therefore, one direction is more rigid than the other.
The static seismic load was not applied to PV-62 at the full set pressure of 2485 psig. PV-62 was tested with a prorate spring at a prorate pressure of 900 psig. The test facility is not capable of testing PV-62 at the full set pressure of 2485 psig.
The test procedure (T-16093) did not make the customer fully aware of the limitations of the test facility. However, T-16093 did make the customer aware of the testing being performed with a prorated spring at a prorated pressure.
(v) The date on which the information of such defect or failure to comply was obtained.
27 June 2013 2
PENTAIR (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this Part.
Tag Serial Number Serial Number Site APP-RCS-PL-VO05A 00-0001 Sanmen Unit 1/Haiyang Unit 1 APP-RCS-PL-VO05B 00-0002 Sanmen Unit 1/Haiyang Unit 2 APP-RCS-PL-VO05A 00-0003 Sanmen Unit 1/Haiyang Unit 3 APP-RCS-PL-VO05B 00-0004 Sanmen Unit 1/Haiyang Unit 4 APP-RCS-PL-VO05A 00-0005 Sanmen Unit 1/Haiyang Unit 5 APP-RCS-PL-VO05B 00-0006 Sanmen Unit 1/Haiyang Unit 6 APP-RCS-PL-VO05A 00-0007 Sanmen Unit 1/Haiyang Unit 7 APP-RCS-PL-VO05B 00-0008 Sanmen Unit 1/Haiyang Unit 8 APP-RCS-PL-VO05A 00-0009 Vogtle APP-RCS-PL-VO05B 00-0010 Vogtle APP-RCS-PL-VO05A 00-0011 VC Summer APP-RCS-PL-VO05B 00-0012 VC Summer APP-RCS-PL-VO05A 00-0013 VC Summer APP-RCS-PL-VO05B 00-0014 VC Summer APP-RCS-PL-VO05A 00-0015 VC Summer APP-RCS-PL-VO05B 00-0016 VC Summer APP-RCS-PL-VO0SA 00-0001 Sanmen NPP Unit 2 APP-RCS-PL-VO05B 00-0002 Sanmen NPP Unit 2 APP-RCS-PL-VO05A 00-0001 Haiyang NPP Unit 2 APP-RCS-PL-VO05B 00-0002 Haiyang NPP Unit 2 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action and the length of time that has been or will be taken to complete the action.
A Pentair Corrective Action Report (CAR 674) was created for the non-conformance. The use of prorate springs to test the valve within the capabilities of the test facility is a common practice among valve manufacturers and does not invalidate the test findings. Customer has been made aware of the test facility limitations. The test report (T-16093) has been updated and approved to reflect the limitations of the test facility. There is no 10 CFR 21 reportable.
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
3
PENTAIR None. PV-62 had no potential of being installed in an active plant. PV-62 was returned to Pentair Mansfield and testing was corrected.
(ix) In the case of an early site permit, the entities to whom an early site permit was transferred.
Not applicable.
If you have any questions or wish to discuss this matter or this report, please feel free to contact me.
Sincerely, rian L. Martin Quality Assurance Manager 4