Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Justification of Use of Prorate Spring in PV-62
ML14090A433
Person / Time
Site: Summer, Vogtle, 99901431  South Carolina Electric & Gas Company icon.png
Issue date: 03/27/2014
From: Martin B
Pentair Valves And Controls
To:
Document Control Desk, Office of New Reactors
References
IR-13-201
Download: ML14090A433 (4)


Text

PENTAIR Brian Martin Quality Assurance Manager PENTAIR VALVES & CONTROLS 508-594-4463 (direct) 508-594-4249 (fax) 508-298-4603 (mobile)

Brian.Martin@Pentair.com Mansfield, MA 02048 www.pentair.com March 27, 2014 VIA REGULAR MAIL:

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 VIA OVERNIGHT DELIVERY:

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746

Subject:

Interim Report- 10CFR 21 Evaluation regarding potential deficiencies in justification of use of prorate spring in PV-62 The purpose of this letter is to provide the NRC a report in general conformity to the requirements of 10CFR 21 Part 21.21 (a)(2).

This report is a result of NRC Inspection Report No. 99901431/2013-201 dated 20 August 2013 and Pentair Corrective Action Report (CAR 674). In general CAR 674 determined that customer was not properly informed of the reason for the use of a prorated spring used for testing the valve. The subject valve (PV-62) of CAR 674 and its test procedure were modified to explicitly state the use of the prorate spring for testing due to the limitations of the test facility. The customer did not have an active reactor. The customer approved the test procedure and the resulting test report.

This report is to inform the NRC of the potential 10CFR 21 evaluation. Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby is notifying the NRC of this potential and the affected licensees of the results of the 10CFR 21 evaluation.

Required information as per 10CFR Part 21.21 (d)(4) follows:

(i) Name and Address of the individual or individuals informing the Commission:

1

PENTAIR Brian L. Martin Quality Assurance Manager Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby Mansfield Operations 55 Cabot Blvd Mansfield, MA 02048 (ii) Identification of the facility, the activity, or basic component supplied for such facility or such activity within the Unites States which fails to comply or contains a defect.

Safety valve PV-62 seismic testing.

(iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

Pentair Valves and Controls US LP, dba Anderson Greenwood Crosby Mansfield Operations 55 Cabot Blvd Mansfield, MA 02048 (iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

PV-62 is a valve that had a QME-1 requirement of seismic load testing.

The valve was sent out for a natural frequency scan to identify if the valve is considered a rigid body. The requirement for rigid body is no natural frequencies below 33 Hz. If the valve meets the rigid body requirement, the valve can proceed to a static load test (versus a dynamic load test). PV-62 meets the requirement of no natural frequencies below 33 Hz. PV-62 is not completely symmetrical and has different natural frequencies in the different directions. Therefore, one direction is more rigid than the other.

The static seismic load was not applied to PV-62 at the full set pressure of 2485 psig. PV-62 was tested with a prorate spring at a prorate pressure of 900 psig. The test facility is not capable of testing PV-62 at the full set pressure of 2485 psig.

The test procedure (T-16093) did not make the customer fully aware of the limitations of the test facility. However, T-16093 did make the customer aware of the testing being performed with a prorated spring at a prorated pressure.

(v) The date on which the information of such defect or failure to comply was obtained.

27 June 2013 2

PENTAIR (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this Part.

Tag Serial Number Serial Number Site APP-RCS-PL-VO05A 00-0001 Sanmen Unit 1/Haiyang Unit 1 APP-RCS-PL-VO05B 00-0002 Sanmen Unit 1/Haiyang Unit 2 APP-RCS-PL-VO05A 00-0003 Sanmen Unit 1/Haiyang Unit 3 APP-RCS-PL-VO05B 00-0004 Sanmen Unit 1/Haiyang Unit 4 APP-RCS-PL-VO05A 00-0005 Sanmen Unit 1/Haiyang Unit 5 APP-RCS-PL-VO05B 00-0006 Sanmen Unit 1/Haiyang Unit 6 APP-RCS-PL-VO05A 00-0007 Sanmen Unit 1/Haiyang Unit 7 APP-RCS-PL-VO05B 00-0008 Sanmen Unit 1/Haiyang Unit 8 APP-RCS-PL-VO05A 00-0009 Vogtle APP-RCS-PL-VO05B 00-0010 Vogtle APP-RCS-PL-VO05A 00-0011 VC Summer APP-RCS-PL-VO05B 00-0012 VC Summer APP-RCS-PL-VO05A 00-0013 VC Summer APP-RCS-PL-VO05B 00-0014 VC Summer APP-RCS-PL-VO05A 00-0015 VC Summer APP-RCS-PL-VO05B 00-0016 VC Summer APP-RCS-PL-VO0SA 00-0001 Sanmen NPP Unit 2 APP-RCS-PL-VO05B 00-0002 Sanmen NPP Unit 2 APP-RCS-PL-VO05A 00-0001 Haiyang NPP Unit 2 APP-RCS-PL-VO05B 00-0002 Haiyang NPP Unit 2 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action and the length of time that has been or will be taken to complete the action.

A Pentair Corrective Action Report (CAR 674) was created for the non-conformance. The use of prorate springs to test the valve within the capabilities of the test facility is a common practice among valve manufacturers and does not invalidate the test findings. Customer has been made aware of the test facility limitations. The test report (T-16093) has been updated and approved to reflect the limitations of the test facility. There is no 10 CFR 21 reportable.

(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

3

PENTAIR None. PV-62 had no potential of being installed in an active plant. PV-62 was returned to Pentair Mansfield and testing was corrected.

(ix) In the case of an early site permit, the entities to whom an early site permit was transferred.

Not applicable.

If you have any questions or wish to discuss this matter or this report, please feel free to contact me.

Sincerely, rian L. Martin Quality Assurance Manager 4