| | title = 07/07/14 Summary of Pre-Licensing Meeting with STP Nuclear Operating Company to Discuss Future License Amendment Request to Revise TS 6.9.1.6.b.9 to the Leading Edge Flow Meter Technology for Feedwater Flow Measurement (TAC Nos. MF4291 and | | | title = Summary of Pre-Licensing Meeting with STP Nuclear Operating Company to Discuss Future License Amendment Request to Revise TS 6.9.1.6.b.9 to the Leading Edge Flow Meter Technology for Feedwater Flow Measurement |
| | author name = Singal B K | | | author name = Singal B |
| | author affiliation = NRC/NRR/DORL/LPLIV-1 | | | author affiliation = NRC/NRR/DORL/LPLIV-1 |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000498, 05000499 | | | docket = 05000498, 05000499 |
| | license number = NPF-076, NPF-080 | | | license number = NPF-076, NPF-080 |
| | contact person = Singal B K | | | contact person = Singal B |
| | case reference number = TAC MF4291, TAC MF4292 | | | case reference number = TAC MF4291, TAC MF4292 |
| | document type = Meeting Briefing Package/Handouts, Meeting Summary, Slides and Viewgraphs | | | document type = Meeting Briefing Package/Handouts, Meeting Summary, Slides and Viewgraphs |
| | page count = 13 | | | page count = 13 |
| | project = TAC:MF4291, TAC:MF4292 | | | project = TAC:MF4291, TAC:MF4292 |
| | stage = Other | | | stage = Meeting |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project, Units 1 and 2 | | {{#Wiki_filter:LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project, Units 1 and 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SUMMARY OF JULY 7, 2014, PRE-LICENSING PUBLIC MEETING WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST FOR REPLACING CROSSFLOW ULTRASONIC FLOW MEASUREMENT WITH LEADING EDGE FLOW METER TECHNOLOGY (TAC NOS. MF4291 AND MF4292) On July 7, 2014, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of STP Nuclear Operating Company (STPNOC, the licensee), at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated June 23, 2014, is located in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML 14174B375. The purpose of the meeting was to discuss the license amendment request (LAR) for replacing Crossflow Ultrasonic Flow Measurement (UFM) technology with Leading Edge Flow Meter (LEFM) technology. This change affects Technical Specification (TS) 6.9.1.6, "Core Operating Limits Report (COLR)." A list of meeting attendees is provided in Enclosure 1 to this meeting summary. Meeting Summary The discussion was based on the following meeting materials/handouts, which is provided in Enclosure 2 of this meeting summary: | | |
| * Slides provided by STPNOC, "AMAG [Advanced Measurements & Analysis Group] Crossflow UFM Change to Cameron I Caldon LEFM, July 7, 2014" (Enclosure 2) Discussion: | | ==SUMMARY== |
| * The licensee stated that its objective was to change the administrative section of TS 6.9.1.6. The proposed LARwill replace the Crossflow UFM with LEFM technology, which is an NRC-approved technology. The licensee stated that it intends to follow the guidance in Regulatory Issue Summary (RIS) 2002-03, "Guidance on the Content of Measurement Uncertainty Recapture Power Uprate Applications," dated January 31, 2002 (ADAMS Accession No. ML013530183). The licensee clarified that the proposed LAR is not associated with a licensed thermal power uprate and the plant will continue to operate at the current power level. | | OF JULY 7, 2014, PRE-LICENSING PUBLIC MEETING WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST FOR REPLACING CROSSFLOW ULTRASONIC FLOW MEASUREMENT WITH LEADING EDGE FLOW METER TECHNOLOGY (TAC NOS. MF4291 AND MF4292) |
| * The NRC staff recommended that the licensee include plans in the proposed LAR to implement long-term trending and data collection of other plant parameters to substantiate the accuracy of the Caldon Ultrasonic Technology Center (Caldon) equipment. The staff proposed that Caldon could help the licensee determine what parameters to trend. | | On July 7, 2014, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of STP Nuclear Operating Company (STPNOC, the licensee), at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated June 23, 2014, is located in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML14174B375. The purpose of the meeting was to discuss the license amendment request (LAR) for replacing Crossflow Ultrasonic Flow Measurement (UFM) technology with Leading Edge Flow Meter (LEFM) technology. This change affects Technical Specification (TS) 6.9.1.6, "Core Operating Limits Report (COLR)." |
| | A list of meeting attendees is provided in Enclosure 1 to this meeting summary. |
| | Meeting Summary The discussion was based on the following meeting materials/handouts, which is provided in of this meeting summary: |
| | * Slides provided by STPNOC, "AMAG [Advanced Measurements & Analysis Group] |
| | Crossflow UFM Change to Cameron I Caldon LEFM, July 7, 2014" (Enclosure 2) |
| | Discussion: |
| | * The licensee stated that its objective was to change the administrative section of TS 6.9.1.6. The proposed LARwill replace the Crossflow UFM with LEFM technology, which is an NRC-approved technology. The licensee stated that it intends to follow the guidance in Regulatory Issue Summary (RIS) 2002-03, "Guidance on the Content of Measurement Uncertainty Recapture Power Uprate Applications," dated January 31, 2002 (ADAMS Accession No. ML013530183). |
| | The licensee clarified that the proposed LAR is not associated with a licensed thermal power uprate and the plant will continue to operate at the current power level. |
| | * The NRC staff recommended that the licensee include plans in the proposed LAR to implement long-term trending and data collection of other plant |
| | |
| | parameters to substantiate the accuracy of the Caldon Ultrasonic Technology Center (Caldon) equipment. The staff proposed that Caldon could help the licensee determine what parameters to trend. |
| * The NRC staff stated that uncertainties for the LEFM technology are significantly less than UFM technology and requested that the licensee include a discussion on how the uncertainties will be treated in the proposed LAR. | | * The NRC staff stated that uncertainties for the LEFM technology are significantly less than UFM technology and requested that the licensee include a discussion on how the uncertainties will be treated in the proposed LAR. |
| * In response to the licensee's request for an expedited review, the NRC staff stated that it may not be able to support the review schedule requested by the licensee. Based on the available resources, the NRC staff will make every effort to support the proposed schedule. After the conclusion of the meeting, the NRC staff noted page 3 of the STP presentation incorrectly stated the TS number. The correct TS number is 6.9.1.6, as stated in page 8 (summary slide) of the STP presentation. No Public Meeting Feedback Forms were received for this meeting. Please direct any inquiries to me at (301) 415-3016, or balwant.singal@nrc.gov. Docket Nos. 50-445 and 50-446 | | * In response to the licensee's request for an expedited review, the NRC staff stated that it may not be able to support the review schedule requested by the licensee. Based on the available resources, the NRC staff will make every effort to support the proposed schedule. |
| | After the conclusion of the meeting, the NRC staff noted page 3 of the STP presentation incorrectly stated the TS number. The correct TS number is 6.9.1.6, as stated in page 8 (summary slide) of the STP presentation. |
| | No Public Meeting Feedback Forms were received for this meeting. |
| | Please direct any inquiries to me at (301) 415-3016, or balwant.singal@nrc.gov. |
| | Sincerely, |
| | -b~~~~~ |
| | Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| 1. List of Attendees 2. Licensee Presentation Slides cc w/encl: Distribution via Listserv Sincerely, Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES JULY 7, 2014. MEETING WITH STP NUCLEAR OPERATING COMPANY LLC REGARDING REPLACING CROSSFLOW UFM WITH LEFM TECHNOLOGY Name Sujata Goetz Balwant Singal Peter Snyder Matthew Hamm Warren Lyon Samir Darbali Joanna Phillips Ernie Hauser Jacob Park Lance Sterling Mike Murray Jonathan Pierce Gary Jones Francis Comeaux Charles Albury Rafael Gonzales SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 Title Organization Project Manager NRR/DORLILPL4-1 Senior Project Manager NRR/ DORLILPL4-1 Reactor Systems Engineer NRR/DSS/STSB Reactor Systems Engineer NRR/DSS/STSB Senior Reactor Engineer NRR/DSS/SRXB Electronics Engineer NRR/DE/EICB Cameron** Cameron** STPNOC STPNOC STPNOC STPNOC STPNOC STPNOC STPNOC STPNOC ** STPNOC Contractor Enclosure 1 ENCLOSURE 2 LICENSEE SLIDE PRESENTATION JULY 7, 2014, MEETING South Texas Project AMAG Crossflow UFM change to Cameron/Caldon LEFM License Amendment Request (LAR) July 7, 2014 Desired Outcomes Provide LAR scope Discuss schedule for LAR and implementation Capture NRC Insights 2 LAR Scope Change to the administrative section of the Technical Specifications (TS 6.1.9.6) o Section states Crossflow UFM technology is input to COLR o LARwill replace Crossflow UFM technology with LEFM technology 3 LAR Details Change is not a power uprate Change uses NRC-approved technology o (Cal don Ultrasonics Engineering Report ER-1 5 7(P-A) Rev. 8 and Rev. 8 Errata, "Supplement to Caldon Topical Report ER-80P: Basis for Power Uprates with an LEFM Check or an LEFM CheckPius System,") Replacement is considered equivalent or better than current AMAG UFM system 4 Strategy Based on equipment change and Admin TS change only, does the NRC have any questions regarding this strategy 5 Schedule Submit july 31, 2014 Request expedited NRC review (Feb 201 5) Install in Unit 2 (Spring 201 5 refueling outage) Install in Unit 1 (Fall 201 5 refueling outage) 6 u 0::: z -c c:: rd u 0 c z 0 *-Q. V') V') I-::::s u Vl V') *--c c Q) c. 0 ..... | | : 1. List of Attendees |
| Summary Not a power uprate Change to the administrative Technical Specification Section (TS 6.9.1 .6) Cameron/Caldon LEFM is NRC-approved Expedited review requested 8 | | : 2. Licensee Presentation Slides cc w/encl: Distribution via Listserv |
| * parameters to substantiate the accuracy of the Caldon Ultrasonic Technology Center (Caldon) equipment. The staff proposed that Caldon could help the licensee determine what parameters to trend.
| | |
| * The NRC staff stated that uncertainties for the LEFM technology are significantly less than UFM technology and requested that the licensee include a discussion on how the uncertainties will be treated in the proposed LAR.
| | LIST OF ATTENDEES JULY 7, 2014. MEETING WITH STP NUCLEAR OPERATING COMPANY LLC REGARDING REPLACING CROSSFLOW UFM WITH LEFM TECHNOLOGY SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 Name Title Organization Sujata Goetz Project Manager NRR/DORLILPL4-1 Balwant Singal Senior Project Manager NRR/ DORLILPL4-1 Peter Snyder Reactor Systems Engineer NRR/DSS/STSB Matthew Hamm Reactor Systems Engineer NRR/DSS/STSB Warren Lyon Senior Reactor Engineer NRR/DSS/SRXB Samir Darbali Electronics Engineer NRR/DE/EICB Joanna Phillips Cameron** |
| * In response to the licensee's request for an expedited review, the NRC staff stated that it may not be able to support the review schedule requested by the licensee. Based on the available resources, the NRC staff will make every effort to support the proposed schedule. After the conclusion of the meeting, the NRC staff noted page 3 of the STP presentation incorrectly stated the TS number. The correct TS number is 6.9.1.6, as stated in page 8 (summary slide) of the STP presentation. No Public Meeting Feedback Forms were received for this meeting. Please direct any inquiries to me at (301) 415-3016, or balwant.singal@nrc.gov. Sincerely, IRA/ Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446
| | Ernie Hauser Cameron** |
| | Jacob Park STPNOC Lance Sterling STPNOC Mike Murray STPNOC Jonathan Pierce STPNOC Gary Jones STPNOC Francis Comeaux STPNOC Charles Albury STPNOC Rafael Gonzales STPNOC |
| | ** STPNOC Contractor Enclosure 1 |
| | |
| | ENCLOSURE 2 LICENSEE SLIDE PRESENTATION JULY 7, 2014, MEETING |
| | |
| | South Texas Project AMAG Crossflow UFM change to Cameron/Caldon LEFM License Amendment Request (LAR) |
| | July 7, 2014 |
| | |
| | Desired Outcomes |
| | ~ Provide LAR scope |
| | ~ Discuss schedule for LAR and implementation |
| | ~ Capture NRC Insights 2 |
| | |
| | LAR Scope |
| | ~ Change to the administrative section of the Technical Specifications (TS 6.1.9.6) o Section states Crossflow UFM technology is input to COLR o LARwill replace Crossflow UFM technology with LEFM technology 3 |
| | |
| | LAR Details |
| | ~ Change is not a power uprate |
| | ~ Change uses NRC-approved technology o (Cal don Ultrasonics Engineering Report ER-1 5 7(P-A) Rev. 8 and Rev. 8 Errata, "Supplement to Caldon Topical Report ER-80P: Basis for Power Uprates with an LEFM Check or an LEFM CheckPius System,") |
| | ~ Replacement is considered equivalent or better than current AMAG UFM system 4 |
| | |
| | Strategy |
| | ~ Based on equipment change and Admin TS change only, does the NRC have any questions regarding this strategy 5 |
| | |
| | Schedule Submit july 31, 2014 Request expedited NRC review (Feb 201 5) |
| | Install in Unit 2 (Spring 201 5 refueling outage) |
| | Install in Unit 1 (Fall 201 5 refueling outage) 6 |
| | |
| | u 0::: |
| | z |
| | -c c:: |
| | rd u |
| | 0 z |
| | Q. |
| | c 0 |
| | V') |
| | I- V') |
| | ::::s Vl u V') |
| | -c c |
| | Q) c. |
| | 0 |
| | |
| | Summary |
| | ~ Not a power uprate |
| | ~ Change to the administrative Technical Specification Section (TS 6.9.1 .6) |
| | ~ Cameron/Caldon LEFM is NRC-approved |
| | ~ Expedited review requested 8 |
|
| |
|
| ==Enclosures:==
| | ML14192A984 *Via e-mail OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1/PM NRRIDORL/LPL4-1 /LA NRR/DSS/STSB/BC NAME SGoetz BSingal JBurkhardt REIIiott DATE 7/22/14 7/22/14 7/22/14 7/23/14 OFFICE NRR/DSS/SRXB/BC NRR/DE/EICB/BC NRR/DORL/LPL4-1 /BC NRR/DORL!LPL4-1 /PM NAME CJackson (UShoop for) JThorp MMarkley (EOesterle for) BSingal DATE 7/29/14 7/29/14 8/1/14 8/4/14}} |
| 1 . List of Attendees 2. Licensee Presentation Slides cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 r/f RidsAcrsAcnw_MaiiCTR Resource RidsNrrDe/EICB Resource RidsNrrDorllpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMSouth Texas Resource RidsRgn4MaiiCenter Resource SGoetz, NRR/DORL/LP4-1 REIIiott, NRR!DSS/STSB PSnyder, NRR/DSS/STSB MHamm, NRR/DSS/STSB SDarbali, NRR/DE/EICB Wlyon, NRR/DSS/SRXB ADAMS Accession No.: ML 14192A984 *Via e-mail OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1/PM NRRIDORL/LPL4-1 /LA NRR/DSS/STSB/BC NAME SGoetz BSingal JBurkhardt REIIiott DATE 7/22/14 7/22/14 7/22/14 7/23/14 OFFICE NRR/DSS/SRXB/BC NRR/DE/EICB/BC NRR/DORL/LPL4-1 /BC NRR/DORL!LPL4-1 /PM NAME CJackson (UShoop for) JThorp MMarkley (EOesterle for) BSingal DATE 7/29/14 7/29/14 8/1/14 8/4/14 OFFICIAL RECORD COPY
| |
| }} | |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML14192A9842014-08-0404 August 2014 Summary of Pre-Licensing Meeting with STP Nuclear Operating Company to Discuss Future License Amendment Request to Revise TS 6.9.1.6.b.9 to the Leading Edge Flow Meter Technology for Feedwater Flow Measurement Project stage: Meeting 2014-08-04
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24080A1292024-03-25025 March 2024 March 25, 2024, Pre-Submittal Meeting for STP QA Plan Change ML22243A1312022-08-31031 August 2022 STP Nuclear Operating Company August 31, 2022 Presentation - Pre-Submittal Meeting for Updated Main Steam Line Break and Locked Rotor Dose Consequence Analysis to Address Extended Cooldown Timelines ML22214A0972022-08-0202 August 2022 Presentation by South Texas Project ML22153A2942022-06-17017 June 2022 richardsd-hv-th28 ML21203A2702021-07-26026 July 2021 Presentation - 7-26-21 Meeting with STPNOC Proposed South Texas Project Moderator Temperature Coefficient TS Change ML20125A3362020-05-0404 May 2020 STP Presubmittal Meeting Exigent Accumulator LAR 2020-05-05 Presentation L-2020-LRM-0039 ML19326A0072019-11-22022 November 2019 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan - December 3, 2019 ML16356A0612016-12-21021 December 2016 12/21/2016 South Texas Project Aluminum Bronze Aging Management Request for Additional Information ML16264A3632016-09-20020 September 2016 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times ML16210A0442016-07-28028 July 2016 STP Nuclear Operating Company Handouts for July 28, 2016 Public Meeting on GSI-191 ML16172A0192016-07-25025 July 2016 STP Aluminum Bronze Selective Leaching Public Meeting - June 21, 2016 ML16202A4872016-07-21021 July 2016 07/21/2016 Talking Points, Supplemental Information for South Texas Project and NRC Public Meeting ML16111A0272016-04-18018 April 2016 STP Nuclear Operating Company Slideshow for Public Meeting on April 21, 2016 for GSI-191 Resolution (CAC No. MF2400-01) ML16062A3042016-03-0202 March 2016 TS 5.3.2 LAR Pre-Submittal Meeting Presentation - March 2, 2016 ML16033A0042016-01-19019 January 2016 Applicant's Slides for STP Meeting on Aluminum Bronze Aging Management ML15274A5992015-10-0101 October 2015 10-01-15 Public Phone Call ML15271A3042015-09-28028 September 2015 Public Phone Call Meeting Description of Supplement 2 to STPNOC Risk-Informed Licensing Application to Address GSI-191 and Respond to GL-2004-02 ML15111A0582015-04-15015 April 2015 Licensee Handouts (2 of 2) for 4/22/2015 Public Meeting Possible Roverd Section on Fixed Filtration (TAC Nos. MF2400-MF2409) ML15111A0562015-04-15015 April 2015 Licensee Handouts (1 of 2) for 4/22/2015 Public Meeting Revised Roverd Section on Large Early Release Frequency Change for Large Break Loss-of-Coolant Accident(Tac Nos. MF2400-MF2409) ML15056A3862015-02-25025 February 2015 NRC Slides for February 25, 2015 Public Meeting with STPNOC Concerning GSI-191 ML15049A4882015-02-18018 February 2015 Slides for February 25, 2015 Public Meeting ML15034A1512015-02-0505 February 2015 Integrated Leak Rate Test (ILRT) from 10 Years to 15 Years. NRC Public Meeting Slides - ILRT License Amendment ML15034A1142015-02-0404 February 2015 STP Risk- Informed Approach to GSI - 191 Roverd 2015 Meeting Blue 1 29 15 ML14192A9842014-08-0404 August 2014 Summary of Pre-Licensing Meeting with STP Nuclear Operating Company to Discuss Future License Amendment Request to Revise TS 6.9.1.6.b.9 to the Leading Edge Flow Meter Technology for Feedwater Flow Measurement ML14120A0112014-04-29029 April 2014 4/29/2014 - South Texas Project Regulatory Approach for Risk-Informed Pilot Submittal Presentation Relating to 10 CFR 50.46c ML13352A1422013-12-16016 December 2013 GSI-191 Licensing Submittal Comparison of Changes Between Rev 1 and Rev 2 ML13352A1242013-12-16016 December 2013 NRC Staff Slides South Texas Project Risk-Informed Generic Safety Issue - 191, December 16, 2013 ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final ML13150A2162013-05-23023 May 2013 Licensee Slides for 5/23/13 Public Meeting Regarding GSI-191 ML13140A2562013-05-20020 May 2013 Licensee Slides for 5/23/13 Meeting - STP Pilot Submittal for Risk Informed Approach to Resolving GSI-191 ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13051A8552013-02-20020 February 2013 Licensee Slides for 3/5/13 Pre-Application Meeting for Proposed Licensing Action to Revise the Fire Protection Program at STP ML13029A4972013-01-15015 January 2013 Slides - Preliminary Site-Specific Results of the Environmental Review for South Texas Project License Renewal ML12297A3312012-11-27027 November 2012 Summary of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12264A3202012-10-11011 October 2012 Meeting Handout for 10/11/12 Pre-licensing Meeting License Amendment Request to Revise the Fire Protection Program ML12145A4382012-05-18018 May 2012 Licensee Handout on Calibration and Benchmarking of Single and Two-Phase Jet Cfd Models ML1209004042012-03-30030 March 2012 3-27-2012 - STP Public Meeting Handout from Nuclear Innovation North America, LLC on Fukushima Lessons Learned for South Texas Project Units 3 and 4 ML1205405572012-02-22022 February 2012 Licensee Slides for 03/1/12 Meeting with STP Nuclear Operating Company Meeting to Discuss GSI-191 ML1205405702012-02-22022 February 2012 Uncertainty Modeling of LOCA Frequencies and Break Size Distributions for the STP GSI-191 Resolution ML1205407582012-02-22022 February 2012 STP Summary of January Meeting ML1204400652012-02-0909 February 2012 Licensee Slides for 2/9/12 Meeting Regarding GSI-191 ML1133505632011-12-0101 December 2011 Licensee Presentation from 12/1/11 Meeting Via Conference Call to Discuss Risk-Informed GSI-191,Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance ML1130506322011-10-26026 October 2011 Licensee Handouts from November 1, 2011 Meeting with STP Nuclear Operating Company on GSI-191 ML1127701762011-10-0303 October 2011 Licensee Handouts from 10/3/11 Meeting STP LOCA Frequency ML1127702032011-10-0303 October 2011 Licensee Slides from 10/3/11 Meeting LOCA Frequencies, Final Results ML1123508732011-08-22022 August 2011 Models and Methods Used for Casa Grande ML1123508832011-08-22022 August 2011 LOCA Initiating Event Frequencies and Uncertainties Status Report ML1120707072011-07-26026 July 2011 Meeting Notice with South Texas Project, Units 1 and 2 - Licensee Slide Models and Methods Used for Casa Grande ML1120707292011-07-26026 July 2011 Meeting Notice with South Texas Project, Units 1 and 2 - Licensee Slides Computational Fluid Dynamics Validation Plan ML1118903802011-07-0707 July 2011 Licensee Slides, LOCA Initiating Event Frequencies and Uncertainties(Draft) 2024-03-25
[Table view] Category:Meeting Summary
MONTHYEARML24120A2362024-05-0606 May 2024 Summary of March 25, 2024, Presubmittal Teleconference with STP Nuclear Operating Company to Discuss Changes to the Quality Assurance Plan for South Texas Project, Units 1 and 2 ML22252A0432022-09-12012 September 2022 Summary of August 31, 2022, Webinar with STP Nuclear Operating Company to Discuss a Proposed LAR to Revise the Dose Consequence Analysis for Main Steam Line Break and Locked Rotor Analysis Events for STP, Units 1 & 2 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21236A3082021-09-10010 September 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Moderator Temperature Coefficient Surveillance Requirements ML21222A1192021-08-12012 August 2021 Summary of Meeting with STP Nuclear Operating Company Regarding the License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements for South Texas Project, Units 1 and 2 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20279A8152020-10-20020 October 2020 Summary of September 14, 2020, Presubmittal Teleconference with STP Nuclear Operating Company Regarding the Proposed LAR to Revise the Moderator Temperature Coefficient Surveillance Requirement for South Texas Project, Units 1 and 2 (EPID L ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20163A5522020-06-12012 June 2020 Summary of April 21, 2020, Teleconference with STP Nuclear Operating Company to Discuss the License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2 ML20140A2612020-05-27027 May 2020 May 5, 2020, Summary of Teleconference with STP Nuclear Operating Company to Discuss a Proposed Exigent License Amendment Request to Revise the Pressure of the Safety Injection Accumulators for South Texas Project, Unit 1 ML20107J5482020-04-15015 April 2020 Teleconference Regarding NRC Observations on the March 30, 2020, License Amendment Request to Revise the Emergency Plan STP Nuclear Operation Company South Texas Project, Units 1 and 2, Dockets 50-498 and 50-499 ML20049A0572020-02-26026 February 2020 Summary of February 6, 2020, Meeting with STP Nuclear Operating Company to Discuss a Proposed License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2 (EPID L- 2020-LRM-0004) ML19350C5902019-12-17017 December 2019 12/3/19, Summary of Teleconference with STP Nuclear Operating Company to Discuss a Proposed License Amendment Request to Revise the Emergency Plan for South Texas Project, Units 1 and 2, ML19102A0162019-04-16016 April 2019 4/10/2019 Summary of Public Teleconference Regarding Potential Submission of a Relief Request to Allow Use of Carbon Fiber Reinforced Polymer for Selected Piping Repairs at South Texas, Units 1 and 2 ML17005A1002017-01-18018 January 2017 January 4, 2017, Summary of Meeting to Discussion Stp'S Response to Request for Additional Information the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML16279A3312016-10-27027 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16272A4362016-10-14014 October 2016 Summary of Public Preapplication Meeting with STP Nuclear Operating Company to Discuss Possible License Amendment Request to Modify Emergency Response Organization for South Texas Project, Units 1 and 2 ML16246A0222016-10-0505 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items Related to Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400 - MF2409) ML16238A5272016-09-0101 September 2016 Summary of 7/28/16, Public Meeting with STP Nuclear Operating Company to Discuss the License Amendment and Exemption Requests to Use a Risk-Informed Approach to the Resolution of GSI-191 (CAC Nos. MF2400 - MF2409) ML16218A3672016-08-30030 August 2016 07/21/2016 Summary of Public Teleconference Meeting with STP Nuclear Operating Company Discussing Revisions to License Renewal Application Aluminum Bronze Selective Leaching Aging Management Program and Background Document ML16236A0322016-08-23023 August 2016 08/18/2016 Summary of Conference Call With STP Nuclear Operating Company Concerning the Aluminum Bronze Selective Leaching Aging Management Program in the South Texas Project, License Renewal Application ML16236A3042016-08-23023 August 2016 08/11/2016 Summary of Conference Call Between NRC and STP Nuclear Operating Company Concerning the 2016 Annual Update to the South Texas Project License Renewal Application ML16180A0142016-07-25025 July 2016 Summary of Meeting Discussion Between South Texas Project, Units 1 and 2, and NRC Staff Regarding the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML16190A0082016-07-13013 July 2016 Summary of 6/22/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16188A0072016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 With STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (TAC. Nos. ME4936, ME4937) ML16188A0112016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 With STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (TAC Nos. ME4936, ME4937) ML16188A0092016-07-0707 July 2016 Summary of Telecon Held on July 5, 2016 with STP Nuclear Operating Company, Concerning Additional Information Pertaining to the STP, License Renewal Application (Tac. Nos. ME4936, ME4937) - Enclosure 1 ML16175A1082016-06-24024 June 2016 Summary of 4/21/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 ML16166A0272016-06-14014 June 2016 Summary of Telephone Conference Call Held on 06/08/2016, Between the USNRC and STP Nuclear Operating Company Response to Request for Additional Information B2.1.18-6 Pertaining to the South Texas Project License Renewal Application ML16092A0852016-04-13013 April 2016 3/17/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2401-MF2409) ML16092A0442016-04-11011 April 2016 Summary of 3/3/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16088A2432016-04-0101 April 2016 2/18/2016, Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) ML16081A2052016-03-24024 March 2016 Summary of Meeting with STP Nuclear Operating Company to Discuss Potential License Amendment Request for South Texas Project, Unit 1 Regarding Permanent Operation with 56 Control Rods ML16074A0412016-03-14014 March 2016 Summary of a Call Held on March 10, 2016, between USNRC and STPNOC, Concerning the Staff's Upcoming Audit Regarding the Amp for the Loss Of Material Due to Selective of Al-Br Welds in the ECW System for the STP LRA (TAC Nos. ME4936 And ME4937) ML16060A1272016-03-0707 March 2016 February 23, 2016, Summary of Conference Calls Held between NRC and STP Concerning Staff's Review of Submerged Closure Bolting Portion of 2014 Annual Update for STP License Renewal Application (TAC ME4936 And ME4937) ML16028A1522016-02-18018 February 2016 1/14/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Modifications to the Licensee'S Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16011A0612016-02-0202 February 2016 Summary of 10/1/15 Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (CAC MF ML16011A0702016-01-28028 January 2016 Summary of Preapplication Meeting with STP Nuclear Operating Company to Discuss Exigent License Amendment Request to Operate Following Removal of a D6 Control Rod at South Texas Project, Unit 1 ML16033A0072016-01-19019 January 2016 January 19, 2016, Summary of Public Meeting with STP to Discuss the Plant-Specific Aging Management Program, Selective Leaching of Aluminum Bronze, Associated with STP's License Renewal Application ML16013A0662016-01-14014 January 2016 Summary of 11/9 and 12/30/15 Conference Calls with STP Nuclear Operating Company to Discuss the Fall 2015 Steam Generator Tube Inspection Activities (CAC No. A11018) ML15308A0112015-11-30030 November 2015 Record of Conference Call on STP Request for Additional Information Set 34 ML15201A0032015-07-30030 July 2015 7/2/15 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 ML15177A1042015-07-21021 July 2015 4/22/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400 t ML15177A2742015-07-21021 July 2015 5/6/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC Nos. MF24 ML15180A2732015-07-15015 July 2015 6/3/2015 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400 to ML15139A3442015-06-11011 June 2015 Summary of Telephone Conference Call Held on May 12, 2015 Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 31, Pertaining to the South Texas Project, Licens ML15103A0022015-05-13013 May 2015 Summary of 4/8/15 Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 ML15084A0032015-04-0606 April 2015 2/4/15 Summary of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas, Units 1 and 2 (TAC MF2400-MF24 ML15084A0042015-04-0101 April 2015 2/5/2015 Summary of Presubmittal Meeting with STP Nuclear Operating Company to Discuss Integrated Leak Rate Testing Program License Amendment Request for South Texas, Units 1 and 2 2024-05-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24080A1292024-03-25025 March 2024 March 25, 2024, Pre-Submittal Meeting for STP QA Plan Change ML22243A1312022-08-31031 August 2022 STP Nuclear Operating Company August 31, 2022 Presentation - Pre-Submittal Meeting for Updated Main Steam Line Break and Locked Rotor Dose Consequence Analysis to Address Extended Cooldown Timelines ML22214A0972022-08-0202 August 2022 Presentation by South Texas Project ML22153A2942022-06-17017 June 2022 richardsd-hv-th28 ML21203A2702021-07-26026 July 2021 Presentation - 7-26-21 Meeting with STPNOC Proposed South Texas Project Moderator Temperature Coefficient TS Change ML20248H5322020-09-0404 September 2020 STP Nuclear Operating Company September 14, 2020, Presentation - Pre-Submittal Meeting for Proposed South Texas Project Moderator Temperature Coefficient Surveillance Requirement Technical Specification Change ML20125A3362020-05-0404 May 2020 STP Presubmittal Meeting Exigent Accumulator LAR 2020-05-05 Presentation L-2020-LRM-0039 ML20034E8192020-02-0606 February 2020 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML17004A0292017-01-0404 January 2017 Slides for January 4, 2017, Public Meeting on South Texas Project's Resposne to Aluminum Bronze Aging Management Request for Additional Information ML16356A0612016-12-21021 December 2016 12/21/2016 South Texas Project Aluminum Bronze Aging Management Request for Additional Information ML16350A3272016-11-17017 November 2016 Transcript of Advisory Committee on Reactor Safeguards Plant License Renewal Subcommittee Meeting - November 17, 2016 ML16264A3632016-09-20020 September 2016 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times ML16172A0192016-07-25025 July 2016 STP Aluminum Bronze Selective Leaching Public Meeting - June 21, 2016 ML16188A3682016-07-0606 July 2016 Audit Presentation - Westinghouse Methodology for South Texas Unit 1 LAR: Operation with 56 Control Rods ML16062A3042016-03-0202 March 2016 TS 5.3.2 LAR Pre-Submittal Meeting Presentation - March 2, 2016 ML16033A0042016-01-19019 January 2016 Applicant's Slides for STP Meeting on Aluminum Bronze Aging Management ML15334A3972015-11-30030 November 2015 TS 5 3 2 Emergency LAR Pre-Submittal Meeting Presentation ML15274A5992015-10-0101 October 2015 10-01-15 Public Phone Call ML15034A1512015-02-0505 February 2015 Integrated Leak Rate Test (ILRT) from 10 Years to 15 Years. NRC Public Meeting Slides - ILRT License Amendment ML15034A1142015-02-0404 February 2015 STP Risk- Informed Approach to GSI - 191 Roverd 2015 Meeting Blue 1 29 15 ML14192A9842014-08-0404 August 2014 Summary of Pre-Licensing Meeting with STP Nuclear Operating Company to Discuss Future License Amendment Request to Revise TS 6.9.1.6.b.9 to the Leading Edge Flow Meter Technology for Feedwater Flow Measurement ML14149A0892014-05-21021 May 2014 NRR E-mail Capture - STP-GSI-191 Presentation ML14120A0112014-04-29029 April 2014 4/29/2014 - South Texas Project Regulatory Approach for Risk-Informed Pilot Submittal Presentation Relating to 10 CFR 50.46c ML13352A1422013-12-16016 December 2013 GSI-191 Licensing Submittal Comparison of Changes Between Rev 1 and Rev 2 ML13352A1242013-12-16016 December 2013 NRC Staff Slides South Texas Project Risk-Informed Generic Safety Issue - 191, December 16, 2013 ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final ML13150A2162013-05-23023 May 2013 Licensee Slides for 5/23/13 Public Meeting Regarding GSI-191 ML13140A2562013-05-20020 May 2013 Licensee Slides for 5/23/13 Meeting - STP Pilot Submittal for Risk Informed Approach to Resolving GSI-191 ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13051A8552013-02-20020 February 2013 Licensee Slides for 3/5/13 Pre-Application Meeting for Proposed Licensing Action to Revise the Fire Protection Program at STP ML13029A4972013-01-15015 January 2013 Slides - Preliminary Site-Specific Results of the Environmental Review for South Texas Project License Renewal ML12297A3312012-11-27027 November 2012 Summary of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12264A3202012-10-11011 October 2012 Meeting Handout for 10/11/12 Pre-licensing Meeting License Amendment Request to Revise the Fire Protection Program ML1209004042012-03-30030 March 2012 3-27-2012 - STP Public Meeting Handout from Nuclear Innovation North America, LLC on Fukushima Lessons Learned for South Texas Project Units 3 and 4 ML1204400652012-02-0909 February 2012 Licensee Slides for 2/9/12 Meeting Regarding GSI-191 ML1133505632011-12-0101 December 2011 Licensee Presentation from 12/1/11 Meeting Via Conference Call to Discuss Risk-Informed GSI-191,Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance ML1130506322011-10-26026 October 2011 Licensee Handouts from November 1, 2011 Meeting with STP Nuclear Operating Company on GSI-191 ML1127702032011-10-0303 October 2011 Licensee Slides from 10/3/11 Meeting LOCA Frequencies, Final Results ML1127701762011-10-0303 October 2011 Licensee Handouts from 10/3/11 Meeting STP LOCA Frequency ML1123508732011-08-22022 August 2011 Models and Methods Used for Casa Grande ML1123508832011-08-22022 August 2011 LOCA Initiating Event Frequencies and Uncertainties Status Report ML1120707072011-07-26026 July 2011 Meeting Notice with South Texas Project, Units 1 and 2 - Licensee Slide Models and Methods Used for Casa Grande ML1120707292011-07-26026 July 2011 Meeting Notice with South Texas Project, Units 1 and 2 - Licensee Slides Computational Fluid Dynamics Validation Plan ML1118903802011-07-0707 July 2011 Licensee Slides, LOCA Initiating Event Frequencies and Uncertainties(Draft) ML1118904202011-07-0606 July 2011 Licensee Slide from 7/7/11 Meeting with STP Nuclear ML11157A0102011-06-0202 June 2011 STP Nuclear Operating Company, Licensee Handouts, 6/2/2011 Meeting Risk-Informed GSI-191 Closure Plan for GSI-191 Resolution ML1114501952011-05-24024 May 2011 Summary of Meeting with South Texas Project Electric Generating Station 2010 Performance ML1105503952011-02-22022 February 2011 Licensee Slides from 2/22/11 Public Meeting with STP Nuclear Operating Company ML1103206432011-01-27027 January 2011 1/27/11 Presentation on Risk-Informed GSI-191 Project Overview 2024-03-25
[Table view] |
Text
LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project, Units 1 and 2
SUBJECT:
SUMMARY
OF JULY 7, 2014, PRE-LICENSING PUBLIC MEETING WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST FOR REPLACING CROSSFLOW ULTRASONIC FLOW MEASUREMENT WITH LEADING EDGE FLOW METER TECHNOLOGY (TAC NOS. MF4291 AND MF4292)
On July 7, 2014, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of STP Nuclear Operating Company (STPNOC, the licensee), at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated June 23, 2014, is located in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML14174B375. The purpose of the meeting was to discuss the license amendment request (LAR) for replacing Crossflow Ultrasonic Flow Measurement (UFM) technology with Leading Edge Flow Meter (LEFM) technology. This change affects Technical Specification (TS) 6.9.1.6, "Core Operating Limits Report (COLR)."
A list of meeting attendees is provided in Enclosure 1 to this meeting summary.
Meeting Summary The discussion was based on the following meeting materials/handouts, which is provided in of this meeting summary:
- Slides provided by STPNOC, "AMAG [Advanced Measurements & Analysis Group]
Crossflow UFM Change to Cameron I Caldon LEFM, July 7, 2014" (Enclosure 2)
Discussion:
- The licensee stated that its objective was to change the administrative section of TS 6.9.1.6. The proposed LARwill replace the Crossflow UFM with LEFM technology, which is an NRC-approved technology. The licensee stated that it intends to follow the guidance in Regulatory Issue Summary (RIS) 2002-03, "Guidance on the Content of Measurement Uncertainty Recapture Power Uprate Applications," dated January 31, 2002 (ADAMS Accession No. ML013530183).
The licensee clarified that the proposed LAR is not associated with a licensed thermal power uprate and the plant will continue to operate at the current power level.
- The NRC staff recommended that the licensee include plans in the proposed LAR to implement long-term trending and data collection of other plant
parameters to substantiate the accuracy of the Caldon Ultrasonic Technology Center (Caldon) equipment. The staff proposed that Caldon could help the licensee determine what parameters to trend.
- The NRC staff stated that uncertainties for the LEFM technology are significantly less than UFM technology and requested that the licensee include a discussion on how the uncertainties will be treated in the proposed LAR.
- In response to the licensee's request for an expedited review, the NRC staff stated that it may not be able to support the review schedule requested by the licensee. Based on the available resources, the NRC staff will make every effort to support the proposed schedule.
After the conclusion of the meeting, the NRC staff noted page 3 of the STP presentation incorrectly stated the TS number. The correct TS number is 6.9.1.6, as stated in page 8 (summary slide) of the STP presentation.
No Public Meeting Feedback Forms were received for this meeting.
Please direct any inquiries to me at (301) 415-3016, or balwant.singal@nrc.gov.
Sincerely,
-b~~~~~
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446
Enclosures:
- 1. List of Attendees
- 2. Licensee Presentation Slides cc w/encl: Distribution via Listserv
LIST OF ATTENDEES JULY 7, 2014. MEETING WITH STP NUCLEAR OPERATING COMPANY LLC REGARDING REPLACING CROSSFLOW UFM WITH LEFM TECHNOLOGY SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 Name Title Organization Sujata Goetz Project Manager NRR/DORLILPL4-1 Balwant Singal Senior Project Manager NRR/ DORLILPL4-1 Peter Snyder Reactor Systems Engineer NRR/DSS/STSB Matthew Hamm Reactor Systems Engineer NRR/DSS/STSB Warren Lyon Senior Reactor Engineer NRR/DSS/SRXB Samir Darbali Electronics Engineer NRR/DE/EICB Joanna Phillips Cameron**
Ernie Hauser Cameron**
Jacob Park STPNOC Lance Sterling STPNOC Mike Murray STPNOC Jonathan Pierce STPNOC Gary Jones STPNOC Francis Comeaux STPNOC Charles Albury STPNOC Rafael Gonzales STPNOC
ENCLOSURE 2 LICENSEE SLIDE PRESENTATION JULY 7, 2014, MEETING
South Texas Project AMAG Crossflow UFM change to Cameron/Caldon LEFM License Amendment Request (LAR)
July 7, 2014
Desired Outcomes
~ Provide LAR scope
~ Discuss schedule for LAR and implementation
~ Capture NRC Insights 2
LAR Scope
~ Change to the administrative section of the Technical Specifications (TS 6.1.9.6) o Section states Crossflow UFM technology is input to COLR o LARwill replace Crossflow UFM technology with LEFM technology 3
LAR Details
~ Change is not a power uprate
~ Change uses NRC-approved technology o (Cal don Ultrasonics Engineering Report ER-1 5 7(P-A) Rev. 8 and Rev. 8 Errata, "Supplement to Caldon Topical Report ER-80P: Basis for Power Uprates with an LEFM Check or an LEFM CheckPius System,")
~ Replacement is considered equivalent or better than current AMAG UFM system 4
Strategy
~ Based on equipment change and Admin TS change only, does the NRC have any questions regarding this strategy 5
Schedule Submit july 31, 2014 Request expedited NRC review (Feb 201 5)
Install in Unit 2 (Spring 201 5 refueling outage)
Install in Unit 1 (Fall 201 5 refueling outage) 6
u 0:::
z
-c c::
rd u
0 z
Q.
c 0
V')
I- V')
- s Vl u V')
-c c
Q) c.
0
Summary
~ Not a power uprate
~ Change to the administrative Technical Specification Section (TS 6.9.1 .6)
~ Cameron/Caldon LEFM is NRC-approved
~ Expedited review requested 8
ML14192A984 *Via e-mail OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1/PM NRRIDORL/LPL4-1 /LA NRR/DSS/STSB/BC NAME SGoetz BSingal JBurkhardt REIIiott DATE 7/22/14 7/22/14 7/22/14 7/23/14 OFFICE NRR/DSS/SRXB/BC NRR/DE/EICB/BC NRR/DORL/LPL4-1 /BC NRR/DORL!LPL4-1 /PM NAME CJackson (UShoop for) JThorp MMarkley (EOesterle for) BSingal DATE 7/29/14 7/29/14 8/1/14 8/4/14