ML19095A656
| ML19095A656 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/04/2019 |
| From: | Richards D South Texas |
| To: | Ed Miller Special Projects and Process Branch |
| References | |
| Download: ML19095A656 (11) | |
Text
1 NRR-DMPSPEm Resource From:
Richards, Drew <amrichards@STPEGS.COM>
Sent:
Thursday, April 4, 2019 3:37 PM To:
Miller, Ed Cc:
Gonzales, Rafael; Albaaj, Ali
Subject:
[External_Sender] Handout for STP public meeting next week Attachments:
South Texas Project-presubmittal-CFRP-Final.pdf Ed, See attached for the STP handout for next weeks public meeting. I provided a.pdf version - let me know if you prefer a PowerPoint file. Note that there is no proprietary information in the handout.
- Thanks, drew
Hearing Identifier:
NRR_DMPS Email Number:
907 Mail Envelope Properties (bddd2ecf2c0944ed912907b1bd0e1c5c)
Subject:
[External_Sender] Handout for STP public meeting next week Sent Date:
4/4/2019 3:37:28 PM Received Date:
4/4/2019 3:37:39 PM From:
Richards, Drew Created By:
amrichards@STPEGS.COM Recipients:
"Gonzales, Rafael" <rjgonzales@STPEGS.COM>
Tracking Status: None "Albaaj, Ali" <ajalbaaj@STPEGS.COM>
Tracking Status: None "Miller, Ed" <Ed.Miller@nrc.gov>
Tracking Status: None Post Office:
CMBXEXCH01.CORP.STPEGS.NET Files Size Date & Time MESSAGE 237 4/4/2019 3:37:39 PM South Texas Project-presubmittal-CFRP-Final.pdf 45149 Options Priority:
Standard Return Notification:
No Reply Requested:
Yes Sensitivity:
Normal Expiration Date:
Recipients Received:
South Texas Project Pre-submittal meeting to discuss the use of Carbon Fiber Reinforced Polymer in STPs Essential Cooling Water system 1
Agenda X Purpose of Todays Meeting X Scope of Proposed Alternative X Technical Basis (Public)
X Precedents X Time Frame X Questions 2
Purpose X South Texas Project Nuclear Operating Company intends to submit an inservice inspection alternative request in 2019 for the use of a Carbon Fiber Reinforced Polymer (CFRP) composite repair system for internal structural upgrade of selected safety related piping systems.
X Todays meeting serves as a pre-submittal discussion of the scope and content of the forthcoming alternative request.
3
Scope of Proposed Alternative Request X Piping included: Essential Cooling Water piping X Requested date of approval: January 2020 X American Society of Mechanical Engineers (ASME) Code Class: ASME Code Class 3 4
Scope of Proposed Alternative Request X Applicable Code Edition and Addenda X ASME Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 2004 Edition No Addenda X Reason for Request X The use of CFRP composite repair on piping for ASME applications is a recent technology improvement for aluminum bronze piping during a repair/replacement activity. STPNOC is therefore submitting an ISI Alternative Request for NRC approval to use CFRP material for the repair of pipe sections.
5
Technical Basis X NEI Template for Relief Requests X Material Inspection and Controls X Design Approach for CFRP Lining X CFRP installation requirements X Examination and Testing X In-service Inspection 6
Precedents X Surry Power Station Units 1 and 2 were approved for an inservice inspection alternative request to use CFRP composite repair system for internal structural upgrades of safety related piping.
X Differences between the Surry and STP submittals 7
Time Frame X STP Relief Request submittal - estimated July 2019 X Requested approval date from the NRC - January 2020 8
Questions 9