NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods
ML19095A656
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/04/2019
From: Richards D
South Texas
To: Ed Miller
Special Projects and Process Branch
References
Download: ML19095A656 (11)


Text

NRR-DMPSPEm Resource From: Richards, Drew <amrichards@STPEGS.COM>

Sent: Thursday, April 4, 2019 3:37 PM To: Miller, Ed Cc: Gonzales, Rafael; Albaaj, Ali

Subject:

[External_Sender] Handout for STP public meeting next week Attachments: South Texas Project-presubmittal-CFRP-Final.pdf Ed, See attached for the STP handout for next weeks public meeting. I provided a .pdf version - let me know if you prefer a PowerPoint file. Note that there is no proprietary information in the handout.

Thanks, drew 1

Hearing Identifier: NRR_DMPS Email Number: 907 Mail Envelope Properties (bddd2ecf2c0944ed912907b1bd0e1c5c)

Subject:

[External_Sender] Handout for STP public meeting next week Sent Date: 4/4/2019 3:37:28 PM Received Date: 4/4/2019 3:37:39 PM From: Richards, Drew Created By: amrichards@STPEGS.COM Recipients:

"Gonzales, Rafael" <rjgonzales@STPEGS.COM>

Tracking Status: None "Albaaj, Ali" <ajalbaaj@STPEGS.COM>

Tracking Status: None "Miller, Ed" <Ed.Miller@nrc.gov>

Tracking Status: None Post Office: CMBXEXCH01.CORP.STPEGS.NET Files Size Date & Time MESSAGE 237 4/4/2019 3:37:39 PM South Texas Project-presubmittal-CFRP-Final.pdf 45149 Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:

Recipients Received:

South Texas Project Pre-submittal meeting to discuss the use of Carbon Fiber Reinforced Polymer in STPs Essential Cooling Water system 1

Agenda X Purpose of Todays Meeting X Scope of Proposed Alternative X Technical Basis (Public)

X Precedents X Time Frame X Questions 2

Purpose X South Texas Project Nuclear Operating Company intends to submit an inservice inspection alternative request in 2019 for the use of a Carbon Fiber Reinforced Polymer (CFRP) composite repair system for internal structural upgrade of selected safety related piping systems.

X Todays meeting serves as a pre-submittal discussion of the scope and content of the forthcoming alternative request.

3

Scope of Proposed Alternative Request X Piping included: Essential Cooling Water piping X Requested date of approval: January 2020 X American Society of Mechanical Engineers (ASME) Code Class: ASME Code Class 3 4

Scope of Proposed Alternative Request X Applicable Code Edition and Addenda X ASME Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 2004 Edition No Addenda X Reason for Request X The use of CFRP composite repair on piping for ASME applications is a recent technology improvement for aluminum bronze piping during a repair/replacement activity. STPNOC is therefore submitting an ISI Alternative Request for NRC approval to use CFRP material for the repair of pipe sections.

5

Technical Basis X NEI Template for Relief Requests X Material Inspection and Controls X Design Approach for CFRP Lining X CFRP installation requirements X Examination and Testing X In-service Inspection 6

Precedents X Surry Power Station Units 1 and 2 were approved for an inservice inspection alternative request to use CFRP composite repair system for internal structural upgrades of safety related piping.

X Differences between the Surry and STP submittals 7

Time Frame X STP Relief Request submittal - estimated July 2019 X Requested approval date from the NRC - January 2020 8

Questions 9