STP Nuclear Operating Company September 14, 2020, Presentation - Pre-Submittal Meeting for Proposed South Texas Project Moderator Temperature Coefficient Surveillance Requirement Technical Specification Change
ML20248H532
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/04/2020
From:
South Texas
To: Dennis Galvin
NRC/NRR/DORL/LPL4
Galvin D
References
EPID L- 2020-LRM-0080
Download: ML20248H532 (11)


Text

NRC pre-submittal meeting for proposed South Texas Project Moderator Temperature Coefficient Tech Spec change STP Licensing / PWROG September 14, 2020

Agenda

  • Introductions / opening remarks
  • Meeting objective
  • Background
  • Need for the change
  • Proposed change
  • Summary and conclusions
  • Submittal schedule
  • Open discussion 2

Introductions / opening remarks

  • NRC 3

Meeting objective

  • Discuss a proposed change to STP Technical Specification 3/4.1.1.3, Moderator Temperature Coefficient

[Westinghouse STS 3.1.3]

4

=

Background===

  • The Technical Specifications (TS) typically do not specify how a Surveillance should be performed, only that a parameter should be within limits

Verify MTC is within upper limit

Verify MTC is within lower limit 5

Background (continued)

  • How the Surveillance is performed is implemented via Surveillance Test Procedures
  • Changes to Surveillance Test Procedures are made in accordance with 10 CFR 50.59
  • WCAP-13749-P-A, Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient Measurement, is not approved to determine the EOL MTC that is assumed in the safety analyses
  • WCAP-13749-P-A is a procedure that is used to verify that the EOL MTC is within the limit assumed in the safety analyses, in lieu of measuring the EOL MTC, and should not be included in the STP COLR Specification (TS 6.9.1.6.b. Item 10)
  • STP is the PWROG Lead Plant for the proposed Tech Spec change; other PWROG members will reference the STP License Amendment as precedent in their LARs 6

Need for the change

  • Current SRs 4.1.1.3 a. and b., contain the word measured, which precludes using another procedure to verify that the Surveillances are met
  • WCAP-13749-P-A is a procedure that is used to verify that the EOL MTC is within the limit assumed in the safety analyses, in lieu of measuring the EOL MTC, and should not be included in the COLR Specification (6.9.1.6.b.)
  • Revising the wording in SRs 4.1.1.3 a. and b. from measured to verified will allow the use of other procedures to verify that the Surveillances are met
  • Deleting WCAP-13749-P-A from the COLR Specification (6.9.1.6.b.) will allow the use of another procedure to verify that the EOL MTC limit is met 7

Proposed change 4.1.1.3 The MTC shall be determined to be within its limits during each fuel cycle as follows:

a. The MTC shall be verified measured and compared to the BOL limit specified in the COLR prior to initial operation above 5% of RATED THERMAL POWER, after each fuel loading; and
b. The MTC shall be verified measured at any THERMAL POWER and compared to the 300 ppm surveillance limit specified in the COLR (all rods withdrawn, RATED THERMAL POWER condition) within 7 EFPD after reaching an equilibrium boron concentration of 300 ppm.* In the event this comparison indicates the MTC is more negative than the 300 ppm surveillance limit specified in the COLR, the MTC shall be reverified remeasured, and compared to the EOL MTC limit specified in the COLR, at least once per 14 EFPD during the remainder of the fuel cycle.

8

Proposed change (continued) 6.9.1.6.b.

10. Not used WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient Measurement," March 1997, (W Proprietary).

9

Submittal schedule

  • 09/14/2020 - NRC pre-submittal meeting
  • 10/10/2020 - Discuss NRC meeting feedback with PWROG
  • As required - RAI process
  • NRC acceptance + 12 months - NRC approves LAR
  • all dates are tentative 10

Open discussion 11