ML20215D862: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 5
| page count = 5
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
JUN 151987 Docket Nos. 50 460/508 Washington Public Power Supply System ATTN: Mr. G. C. Sorensen, Manager Regulatory Programs                                                         ,
JUN 151987 Docket Nos. 50 460/508 Washington Public Power Supply System ATTN: Mr. G. C. Sorensen, Manager Regulatory Programs P.O. Box 968 1
P.O. Box 968                                                                         1 3000 George Washington Way Richland, WA 99352                                                                 ]  ,
3000 George Washington Way
J Gentlemen:
]
Richland, WA 99352 J
Gentlemen:
Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analyses for the WNP-1 and WNP-3 operating license application reviews for the period June 23, 1985 through June 21, 19_86.
Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analyses for the WNP-1 and WNP-3 operating license application reviews for the period June 23, 1985 through June 21, 19_86.
The costs through that period are $90,380 for WNP-1 and $135,950 for WNP-3. The enclosures give a breakdown of the review costs by program               ,
The costs through that period are $90,380 for WNP-1 and $135,950 for WNP-3. The enclosures give a breakdown of the review costs by program offices. Within the next few days, you will be sent invoices for these amounts. When making payment, please make reference to the invoice numbers.
offices. Within the next few days, you will be sent invoices for these amounts. When making payment, please make reference to the invoice numbers.
Sincerely, t?p @ c. c:xa ern s a a C. James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of Administration and Resources Management
Sincerely, t?p @ c. c:xa ern s a a C. James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of Administration and Resources Management


==Enclosures:==
==Enclosures:==
Operating License Review Costs (4)
Operating License Review Costs (4)
DISTRIBUTION w/encls:
DISTRIBUTION w/encls:
PDR                         LFMB Reactor File LPDR                       DFioravante, PMSB LFMB A/M File               MKaltman, PRAB RMDiggs                     RVillafranco, PMSB CJHolloway                 DWeiss Reg?DocketIFile             ARM /DAF R/F DW/LT/WPPSS                 LFMB R/F (3) 0FFICE : ARM /LFMB       A     FMB   : ARM /LFMB/   :              :        :          :
PDR LFMB Reactor File LPDR DFioravante, PMSB LFMB A/M File MKaltman, PRAB RMDiggs RVillafranco, PMSB CJHolloway DWeiss Reg?DocketIFile ARM /DAF R/F DW/LT/WPPSS LFMB R/F (3) 0FFICE : ARM /LFMB A
  ......... : ...._..,.f[j p .f
FMB
:  3 ggs:.._ %. . J ....:............;............:............:
: ARM /LFMB/
Rkd SURNAME :LTremper:                     :CJfig7)bway :                 :         :           :
......... :...._..,.f[j p : Rkd ggs
DATE :6/ /A_/__87     :6//6/87        7.(/87
.f
:6/ l)         :              :        :          :
:.._ %.. J....:............;............:............:
8706190168 870615 PDR   ADOCK 05000460 A                   PDR-
3 SURNAME :LTremper:
:CJfig7)bway :
.........:............:...____.....:. 7.(/87 DATE :6/ /A_/__87
:6//6/87
:6/ l )
8706190168 870615 PDR ADOCK 05000460 A
PDR-


  <          a l
l a
l N
l N
                                                                                                                /
/
A Washington Public Power Supply System' Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY:~ WNP-l' DOCKET NO.: 50-460
A Washington Public Power Supply System' Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY:~ WNP-l'
      \
]
                                                                                                                ]
DOCKET NO.: 50-460
c I
\\
l j
I c
Costs Per   Profess'ional Program Office     Professional     Staff-Hours     Staff-Hour     Contractual   Total Review       Staff-Hour       Expended '       Costs           Costs       Costs
lj Costs Per Profess'ional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended '
: 1. , ' NRR               $62             31           $1,922         $62,653     $64,575   -
Costs Costs Costs
: 2.     IE-HQ             53             --              --              --          --
: 1., ' NRR
: 3.     REGIONS           53             80             4,240             -:        4,240 4      ACRS             62             --              --              --          --
$62 31
: 5.     NMSS             58             --              --              --          --
$1,922
TOTAL COST:       $68,815 i
$62,653
$64,575 2.
IE-HQ 53 4,240 3.
REGIONS 53 80 4,240 4
ACRS 62 5.
NMSS 58 TOTAL COST:
$68,815 i
s i
s i
l l
l I
I i
i Y
Y l
l


a     .
a 1
1 1
1 1
Washington Public Power Supply System                           1 Operating License Review Costs'From 12/22/85 Through 6/21/86 FACILITY:     WNP-1 DOCKET N0.: 50-460 l
Washington Public Power Supply System Operating License Review Costs'From 12/22/85 Through 6/21/86 FACILITY:
I Costs Per     Professional Program Office   Professional   ' Staff-Hours       Staff-Hour'     Contractual   Total Review        Staff-Hour        Expended  <
WNP-1 DOCKET N0.: 50-460 l
Costs           Costs-     Costs' l
I Costs Per Professional Program Office Professional
: 1. HRR               $62             283             $17,546         $1,872' $19,418
' Staff-Hours Staff-Hour' Contractual Total Costs Costs-Costs' l
: 2. IE-HQ               53               7                   371          --
Review Staff-Hour Expended 1.
371 j t
HRR
: 3. REGIONS             53             33.5             1,776            --      1,776
$62 283
: 4. ACRS               62             --                --              --        --
$17,546
: 5. NMSS               58             --                --              --        --
$1,872'
1 TOTAL COST:     $21,565 i
$19,418 j
371 2.
IE-HQ 53 7
371 t
1,776 3.
REGIONS 53 33.5 1,776 4.
ACRS 62 5.
NMSS 58 1
TOTAL COST:
$21,565 i
1 1
1 1
4 l
4 l


r a   ..
r a
Washington Public Power Supply System Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY: WNP-3                                     ,
Washington Public Power Supply System Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY: WNP-3 DOCKET NO.:
DOCKET NO.:   50-508 Costs Per   Professional Program Office     Professional     Staff-Hours     Staff-Hour     Contractual Total Review           Staff-Hour       Expended -
50-508 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total
__ Costs      ,
__ Costs Costs Costs Review Staff-Hour Expended 1.
Costs    Costs
NRR
: 1. NRR                 $62             493           $30,566         $1,386   $31,952
$62 493
                                                                                                  ]
$30,566
: 2. 7. E-HQ             53             272             14,416           206     14,622 ll j
$1,386
: 3. REGIONS             53             653             34,609           --      34,609   i i
$31,952
: 4. ACRS                 62             --              --              --        --      1
]
: 5. NMSS                 58               --              --              --        --
2.
1
: 7. E-HQ 53 272 14,416 206 14,622 l
                                                                                          $81,183 Less Credit       - 174*   l TOTAL COST:     $81,009 oCredit given for 2.8 hours (ACRS) billed on Invoice No. E0495 dated 3/12/86 (reference NRC letter dated 4/30/86, Diggs to Sorensen).
j 3.
REGIONS 53 653 34,609 34,609 i
i 4.
ACRS 62 1
5.
NMSS 58
$81,183 Less Credit
- 174*
TOTAL COST:
$81,009 oCredit given for 2.8 hours (ACRS) billed on Invoice No. E0495 dated 3/12/86 (reference NRC letter dated 4/30/86, Diggs to Sorensen).


1 Washiagton Public Power Supply System
1 Washiagton Public Power Supply System
                        .0perating License Review Costs From 6/23/85 Through 12/21/85 l
.0perating License Review Costs From 6/23/85 Through 12/21/85 l
FACILITY:     WNP-3                                     {
FACILITY:
                                                                                                    'J 1
WNP-3
                                              . DOCKET N0.i 50-508 l
{
Costs Per   Professional-Program Office     Professional   Staff-Hours-     Staff-Hour     Contractual . Total Review           Staff-Hour-     Expended -      Costs          Costs      Costs
'J
: 1. NRR                 $62             108             $6,696-       .$1,923   $8,619
. DOCKET N0.i 50-508 1
: 2. IE-HQ                 53           237             12,561           --      12,561'
l Costs Per Professional-Program Office Professional Staff-Hours-Staff-Hour Contractual
: 3. REGIONS               53           637             33,761            --      ~33,761-    !
. Total Costs Costs Costs Review Staff-Hour-Expended 1.
: 4. ACRS                 62             --              --              --        -.
NRR
: 5. NMSS                 58             --              --              --        --
$62 108
TOTAL COST:     $54,941}}
$6,696-
.$1,923
$8,619 2.
IE-HQ 53 237 12,561 12,561'
~33,761-3.
REGIONS 53 637 33,761 4.
ACRS 62 5.
NMSS 58 TOTAL COST:
$54,941}}

Latest revision as of 22:48, 3 December 2024

Forwards Cost Analyses for OL Application Reviews for 850623-860621
ML20215D862
Person / Time
Site: Satsop, Washington Public Power Supply System
Issue date: 06/15/1987
From: Holloway C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8706190168
Download: ML20215D862 (5)


Text

,

JUN 151987 Docket Nos. 50 460/508 Washington Public Power Supply System ATTN: Mr. G. C. Sorensen, Manager Regulatory Programs P.O. Box 968 1

3000 George Washington Way

]

Richland, WA 99352 J

Gentlemen:

Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analyses for the WNP-1 and WNP-3 operating license application reviews for the period June 23, 1985 through June 21, 19_86.

The costs through that period are $90,380 for WNP-1 and $135,950 for WNP-3. The enclosures give a breakdown of the review costs by program offices. Within the next few days, you will be sent invoices for these amounts. When making payment, please make reference to the invoice numbers.

Sincerely, t?p @ c. c:xa ern s a a C. James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of Administration and Resources Management

Enclosures:

Operating License Review Costs (4)

DISTRIBUTION w/encls:

PDR LFMB Reactor File LPDR DFioravante, PMSB LFMB A/M File MKaltman, PRAB RMDiggs RVillafranco, PMSB CJHolloway DWeiss Reg?DocketIFile ARM /DAF R/F DW/LT/WPPSS LFMB R/F (3) 0FFICE : ARM /LFMB A

FMB

ARM /LFMB/

......... :...._..,.f[j p : Rkd ggs

.f

.._ %.. J....:............;............:............:

3 SURNAME :LTremper:

CJfig7)bway :

.........:............:...____.....:. 7.(/87 DATE :6/ /A_/__87

6//6/87
6/ l )

8706190168 870615 PDR ADOCK 05000460 A

PDR-

l a

l N

/

A Washington Public Power Supply System' Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY:~ WNP-l'

]

DOCKET NO.: 50-460

\\

I c

lj Costs Per Profess'ional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended '

Costs Costs Costs

1., ' NRR

$62 31

$1,922

$62,653

$64,575 2.

IE-HQ 53 4,240 3.

REGIONS 53 80 4,240 4

ACRS 62 5.

NMSS 58 TOTAL COST:

$68,815 i

s i

l I

i Y

l

a 1

1 1

Washington Public Power Supply System Operating License Review Costs'From 12/22/85 Through 6/21/86 FACILITY:

WNP-1 DOCKET N0.: 50-460 l

I Costs Per Professional Program Office Professional

' Staff-Hours Staff-Hour' Contractual Total Costs Costs-Costs' l

Review Staff-Hour Expended 1.

HRR

$62 283

$17,546

$1,872'

$19,418 j

371 2.

IE-HQ 53 7

371 t

1,776 3.

REGIONS 53 33.5 1,776 4.

ACRS 62 5.

NMSS 58 1

TOTAL COST:

$21,565 i

1 1

4 l

r a

Washington Public Power Supply System Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY: WNP-3 DOCKET NO.:

50-508 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total

__ Costs Costs Costs Review Staff-Hour Expended 1.

NRR

$62 493

$30,566

$1,386

$31,952

]

2.

7. E-HQ 53 272 14,416 206 14,622 l

j 3.

REGIONS 53 653 34,609 34,609 i

i 4.

ACRS 62 1

5.

NMSS 58

$81,183 Less Credit

- 174*

TOTAL COST:

$81,009 oCredit given for 2.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (ACRS) billed on Invoice No. E0495 dated 3/12/86 (reference NRC letter dated 4/30/86, Diggs to Sorensen).

1 Washiagton Public Power Supply System

.0perating License Review Costs From 6/23/85 Through 12/21/85 l

FACILITY:

WNP-3

{

'J

. DOCKET N0.i 50-508 1

l Costs Per Professional-Program Office Professional Staff-Hours-Staff-Hour Contractual

. Total Costs Costs Costs Review Staff-Hour-Expended 1.

NRR

$62 108

$6,696-

.$1,923

$8,619 2.

IE-HQ 53 237 12,561 12,561'

~33,761-3.

REGIONS 53 637 33,761 4.

ACRS 62 5.

NMSS 58 TOTAL COST:

$54,941