|
|
(One intermediate revision by the same user not shown) |
Line 13: |
Line 13: |
| | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE |
| | page count = 5 | | | page count = 5 |
| | | project = |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:, | | {{#Wiki_filter:, |
| JUN 151987 Docket Nos. 50 460/508 Washington Public Power Supply System ATTN: Mr. G. C. Sorensen, Manager Regulatory Programs , | | JUN 151987 Docket Nos. 50 460/508 Washington Public Power Supply System ATTN: Mr. G. C. Sorensen, Manager Regulatory Programs P.O. Box 968 1 |
| P.O. Box 968 1 3000 George Washington Way Richland, WA 99352 ] , | | 3000 George Washington Way |
| J Gentlemen:
| | ] |
| | Richland, WA 99352 J |
| | Gentlemen: |
| Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analyses for the WNP-1 and WNP-3 operating license application reviews for the period June 23, 1985 through June 21, 19_86. | | Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analyses for the WNP-1 and WNP-3 operating license application reviews for the period June 23, 1985 through June 21, 19_86. |
| The costs through that period are $90,380 for WNP-1 and $135,950 for WNP-3. The enclosures give a breakdown of the review costs by program , | | The costs through that period are $90,380 for WNP-1 and $135,950 for WNP-3. The enclosures give a breakdown of the review costs by program offices. Within the next few days, you will be sent invoices for these amounts. When making payment, please make reference to the invoice numbers. |
| offices. Within the next few days, you will be sent invoices for these amounts. When making payment, please make reference to the invoice numbers. | |
| Sincerely, t?p @ c. c:xa ern s a a C. James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of Administration and Resources Management | | Sincerely, t?p @ c. c:xa ern s a a C. James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of Administration and Resources Management |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
| Operating License Review Costs (4) | | Operating License Review Costs (4) |
| DISTRIBUTION w/encls: | | DISTRIBUTION w/encls: |
| PDR LFMB Reactor File LPDR DFioravante, PMSB LFMB A/M File MKaltman, PRAB RMDiggs RVillafranco, PMSB CJHolloway DWeiss Reg?DocketIFile ARM /DAF R/F DW/LT/WPPSS LFMB R/F (3) 0FFICE : ARM /LFMB A FMB : ARM /LFMB/ : : : : | | PDR LFMB Reactor File LPDR DFioravante, PMSB LFMB A/M File MKaltman, PRAB RMDiggs RVillafranco, PMSB CJHolloway DWeiss Reg?DocketIFile ARM /DAF R/F DW/LT/WPPSS LFMB R/F (3) 0FFICE : ARM /LFMB A |
| ......... : ...._..,.f[j p .f
| | FMB |
| : 3 ggs:.._ %. . J ....:............;............:............:
| | : ARM /LFMB/ |
| Rkd SURNAME :LTremper: :CJfig7)bway : : : :
| | ......... :...._..,.f[j p : Rkd ggs |
| DATE :6/ /A_/__87 :6//6/87 7.(/87 | | .f |
| :6/ l) : : : : | | :.._ %.. J....:............;............:............: |
| 8706190168 870615 PDR ADOCK 05000460 A PDR- | | 3 SURNAME :LTremper: |
| | :CJfig7)bway : |
| | .........:............:...____.....:. 7.(/87 DATE :6/ /A_/__87 |
| | :6//6/87 |
| | :6/ l ) |
| | 8706190168 870615 PDR ADOCK 05000460 A |
| | PDR- |
|
| |
|
| < a l
| | l a |
| l N | | l N |
| /
| | / |
| A Washington Public Power Supply System' Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY:~ WNP-l' DOCKET NO.: 50-460 | | A Washington Public Power Supply System' Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY:~ WNP-l' |
| \
| | ] |
| ]
| | DOCKET NO.: 50-460 |
| c I | | \\ |
| l j
| | I c |
| Costs Per Profess'ional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended ' Costs Costs Costs | | lj Costs Per Profess'ional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended ' |
| : 1. , ' NRR $62 31 $1,922 $62,653 $64,575 - | | Costs Costs Costs |
| : 2. IE-HQ 53 -- -- -- --
| | : 1., ' NRR |
| : 3. REGIONS 53 80 4,240 -: 4,240 4 ACRS 62 -- -- -- --
| | $62 31 |
| : 5. NMSS 58 -- -- -- --
| | $1,922 |
| TOTAL COST: $68,815 i | | $62,653 |
| | $64,575 2. |
| | IE-HQ 53 4,240 3. |
| | REGIONS 53 80 4,240 4 |
| | ACRS 62 5. |
| | NMSS 58 TOTAL COST: |
| | $68,815 i |
| s i | | s i |
| l l | | l I |
| I i
| | i Y |
| Y l
| | l |
|
| |
|
| a . | | a 1 |
| 1 1 | | 1 1 |
| Washington Public Power Supply System 1 Operating License Review Costs'From 12/22/85 Through 6/21/86 FACILITY: WNP-1 DOCKET N0.: 50-460 l | | Washington Public Power Supply System Operating License Review Costs'From 12/22/85 Through 6/21/86 FACILITY: |
| I Costs Per Professional Program Office Professional ' Staff-Hours Staff-Hour' Contractual Total Review Staff-Hour Expended < | | WNP-1 DOCKET N0.: 50-460 l |
| Costs Costs- Costs' l | | I Costs Per Professional Program Office Professional |
| : 1. HRR $62 283 $17,546 $1,872' $19,418
| | ' Staff-Hours Staff-Hour' Contractual Total Costs Costs-Costs' l |
| : 2. IE-HQ 53 7 371 --
| | Review Staff-Hour Expended 1. |
| 371 j t | | HRR |
| : 3. REGIONS 53 33.5 1,776 -- 1,776
| | $62 283 |
| : 4. ACRS 62 -- -- -- --
| | $17,546 |
| : 5. NMSS 58 -- -- -- --
| | $1,872' |
| 1 TOTAL COST: $21,565 i
| | $19,418 j |
| | 371 2. |
| | IE-HQ 53 7 |
| | 371 t |
| | 1,776 3. |
| | REGIONS 53 33.5 1,776 4. |
| | ACRS 62 5. |
| | NMSS 58 1 |
| | TOTAL COST: |
| | $21,565 i |
| 1 1 | | 1 1 |
| 4 l | | 4 l |
|
| |
|
| r a .. | | r a |
| Washington Public Power Supply System Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY: WNP-3 , | | Washington Public Power Supply System Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY: WNP-3 DOCKET NO.: |
| DOCKET NO.: 50-508 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended - | | 50-508 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total |
| __ Costs ,
| | __ Costs Costs Costs Review Staff-Hour Expended 1. |
| Costs Costs
| | NRR |
| : 1. NRR $62 493 $30,566 $1,386 $31,952
| | $62 493 |
| ]
| | $30,566 |
| : 2. 7. E-HQ 53 272 14,416 206 14,622 ll j
| | $1,386 |
| : 3. REGIONS 53 653 34,609 -- 34,609 i i
| | $31,952 |
| : 4. ACRS 62 -- -- -- -- 1
| | ] |
| : 5. NMSS 58 -- -- -- --
| | 2. |
| 1
| | : 7. E-HQ 53 272 14,416 206 14,622 l |
| $81,183 Less Credit - 174* l TOTAL COST: $81,009 oCredit given for 2.8 hours (ACRS) billed on Invoice No. E0495 dated 3/12/86 (reference NRC letter dated 4/30/86, Diggs to Sorensen).
| | j 3. |
| | REGIONS 53 653 34,609 34,609 i |
| | i 4. |
| | ACRS 62 1 |
| | 5. |
| | NMSS 58 |
| | $81,183 Less Credit |
| | - 174* |
| | TOTAL COST: |
| | $81,009 oCredit given for 2.8 hours (ACRS) billed on Invoice No. E0495 dated 3/12/86 (reference NRC letter dated 4/30/86, Diggs to Sorensen). |
|
| |
|
| 1 Washiagton Public Power Supply System | | 1 Washiagton Public Power Supply System |
| .0perating License Review Costs From 6/23/85 Through 12/21/85 l
| | .0perating License Review Costs From 6/23/85 Through 12/21/85 l |
| FACILITY: WNP-3 { | | FACILITY: |
| 'J 1
| | WNP-3 |
| . DOCKET N0.i 50-508 l
| | { |
| Costs Per Professional-Program Office Professional Staff-Hours- Staff-Hour Contractual . Total Review Staff-Hour- Expended - Costs Costs Costs | | 'J |
| : 1. NRR $62 108 $6,696- .$1,923 $8,619
| | . DOCKET N0.i 50-508 1 |
| : 2. IE-HQ 53 237 12,561 -- 12,561'
| | l Costs Per Professional-Program Office Professional Staff-Hours-Staff-Hour Contractual |
| : 3. REGIONS 53 637 33,761 -- ~33,761- !
| | . Total Costs Costs Costs Review Staff-Hour-Expended 1. |
| : 4. ACRS 62 -- -- -- -.
| | NRR |
| : 5. NMSS 58 -- -- -- --
| | $62 108 |
| TOTAL COST: $54,941}} | | $6,696- |
| | .$1,923 |
| | $8,619 2. |
| | IE-HQ 53 237 12,561 12,561' |
| | ~33,761-3. |
| | REGIONS 53 637 33,761 4. |
| | ACRS 62 5. |
| | NMSS 58 TOTAL COST: |
| | $54,941}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20206S2911999-05-0505 May 1999 Informs That on 990420 Council Provided ten-day Comment Period on Council Order 731 Recommending Governor Approval of Amend of Site Certification Agreement for Satsop Power Plant Site ML20202C7671999-01-22022 January 1999 Forwards Order Terminating Construction Permit CPPR-154 for WNP-3/5 Site.Safety Evaluation Associated with Action Also Encl ML20198Q7131999-01-0404 January 1999 Forwards EA & Fonsi Re 960808 Application.Assessment Being Forwarded to Ofc of Fr for Publication ML20155J9731998-11-0505 November 1998 Forwards Addl Detailed Info Re Restoration & Renovation of Site Bldgs Re Util Plans to Renovate Site for Reuse as Industrial Park by Local Government Entity ML20155G7791998-11-0202 November 1998 Forwards Insp Rept 50-508/98-201 on 981027-28.No Violations Noted.Insp Included Review of Activities to Terminate Construction Permit CPPR-154 ML20249B5741998-06-15015 June 1998 Forwards Satsop Site Assessment Rept Which Describes Plans to Transfer Ownership & Convert Site to Business/Industrial Park.Timely Termination of Const Permit Will Facilitate Ownership Transfer.W/One Oversize Drawing ML20116M7191996-08-0808 August 1996 Requests Termination of Construction Permit (CPPR-154) of Nuclear Project 3 & Withdrawal of Pending OL WNP-3 ML20082A7771995-03-28028 March 1995 Forwards WPPSS Nuclear Projects 1,3,4 & 5 Restoration Plan ML20078M4961995-02-0303 February 1995 Advises of Termination of Util Projects 1 & 3 ML20059B7681993-10-20020 October 1993 Requests Code Case N-520 Approval for Nuclear Projects 1 & 3 ML20057A6031993-09-0303 September 1993 Forwards Rev 6 to Procedure WMC-051, Preservation of Assets Program, Reflecting Installation of Two Desiccant Type Dehumidifiers for Controlling Relative Humidity within Reactor Auxiliary/Reactor Bldg Superstructure ML17286B2741991-10-0808 October 1991 Forwards Rev 0 to Washington Nuclear Plant 3 Seismic Design Basis Model Validation,Soil Variation Studies, in Response to Open Items in Draft Safety Evaluation Re Soil/Structure Interaction/Deconvolution Issue ML17286B2661991-06-0707 June 1991 Requests Approval to Revise Tornado Design Criteria,Per Reg Guide 1.76,Section C.1.2 for Rotational & Translational Velocities. Justification for Revised Tornado Design Criteria Encl ML20073P9471991-05-13013 May 1991 Forwards Rev 5 to WMC-051, WNP-3 Preventive Maint Requirements by Equipment Type ML17286A5361991-01-0202 January 1991 Discusses Interpretation of 10CFR73,App B,Paragraph Ii.B Re Security Records Retention Period ML17286A3571990-10-12012 October 1990 Requests That Name Be Kept on Mailing List & That Firm Name Be Changed to Winston & Strawn in Response to 900927 Ltr ML20062A8981990-10-0101 October 1990 Responds to NRC Re Wish to Remain on Mailing List ML20059M0901990-09-27027 September 1990 Informs That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days ML20059M0921990-09-27027 September 1990 Advises That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days ML20059A5411990-08-16016 August 1990 Provides Notice of Changes in Key Personnel ML20056A7171990-07-27027 July 1990 Forwards Partial Vol 1 & Vols 4,5,6 & 7 of FSAR Re Potential Subduction Zones Earthquakes in State of Wa Coastal Area.W/O Encls ML20044A4931990-06-0808 June 1990 Requests That NRC Review of Facility Seismic Rept Completed & SER Issued as Soon as Possible.Facility Seismic Issue Resolution to Minimize Uncertainties Surrounding Economic Evaluations of Deferred Plants Important ML20042G3971990-05-11011 May 1990 Forwards Revised WMC-051, Washington Nuclear Plant-3 Preservation of Assets Program, Incorporating Changes Noted Through Preservation Experience & Successes Achieved in Improving Environ within Plant Bldgs ML20012B6941990-03-0101 March 1990 Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01 ML19325D1831989-10-12012 October 1989 Confirms That Seismic Design Data Submitted Under Separate Cover to R Pichumani,Per 891003 Request ML20246N3191989-08-30030 August 1989 Forwards Addl Info Re Plant Soil Structure Interaction Analysis/Deconvolution Issue,Per 890213 Request.Results Presented in Encl Supplemental Rept Demonstrate Overall Significant Level of Conservatism in Seismic Design Basis ML20247R6131989-05-25025 May 1989 Documents Understanding of Agreements Re Geosciences Review & Preparation of Draft SER & Requests That Staff Schedule Geoscience Review to Be Completed by Sept 1989 in Order That Work Accomplished Currently Not Lost ML20247L3141989-05-11011 May 1989 Forwards Insp Rept 50-508/89-01 on 890413-14 & 0508.No Violations Noted ML17285A2071989-01-23023 January 1989 Forwards Wppss 1988 Annual Financial Rept.W/O Encl ML20206L7671988-11-21021 November 1988 Submits Addl Info in Response to Questions on Geosciences Program Clarifying Rates of Erosion Along State of or & State of Wa Coastlines Re Formation of Modern Wavecut Platforms.Questions Arose from NRC Sept 1988 Visit ML20153F4041988-08-29029 August 1988 Forwards Sassi Analysis & Further Clarification of Elastic Half Space Analysis Providing Confirmation That Finite Element Methodology Used for Plant Design Basis Sufficiently Conservative ML20153E2801988-08-26026 August 1988 Forwards Corrected Page 1 of NRC Forwarding Insp Rept 50-508/88-02 Re Readiness Review Module C3-02 Concrete. Ltr Issued W/O Date Annotated on First Page ML20153G4231988-08-22022 August 1988 Forwards Readiness Review Module C3-02 Concrete Insp Rept 50-508/88-02.Concrete Const Completed at Time of Work Stoppage Deemed Acceptable Assuming Open Items Resolved. Listed Items Will Be Pursued During Future Reviews & Insps ML20207G5251988-08-10010 August 1988 Forwards Plots Showing Computed Distributions of Frequency of Exceedance Displayed in Terms of Fractile Hazard Curves in Seismic Hazard Rept ML20150G0441988-06-30030 June 1988 Forwards Response to Questions 230.1 & 230.2 Re Resolution of Key Licensing Issues Concerning Questions on Cascadia Subduction Zone ML20196C3091988-06-17017 June 1988 Defers Responses to NRC Bulletins & Generic Ltrs Unless NRC Specifically Requests That Util Respond for Facility.Util Will Reply to Outstanding Bulletins & Generic Ltrs That Require Response Following Resumption of Const ML20154D2661988-05-16016 May 1988 Forwards Order Extending Const Completion Date to 990701 for Plant,Per Util 841102 & 860310 Requests.Safety Evaluation & Environ Assessment & Finding of No Significant Impact Also Encl ML20154F5901988-05-13013 May 1988 Informs That Assurance That Program Implemented to Address Corrosive Effects of RCS Leakage at Less than Tech Spec Limits Per Generic Ltr 88-05 Will Not Be Provided Until After Restart of Const ML20154F3191988-05-13013 May 1988 Advises That Due to long-term Const Delay Status of Plant, Action Re Suppl 1 to NRC Bulletin 87-002, Fastner Testing to Determine Conformance W/Applicable Matl Specs, Will Be Deferred Until After Restart of Const ML20154R9251988-05-13013 May 1988 Responds to NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latching Relays Mfg by Ge. Action on Bulletin Will Be Added to Plant Tracking Sys as Work to Be Accomplished Following Restart of Const ML20151S4161988-04-21021 April 1988 Responds to Generic Ltr 88-03, Steam Binding of Auxiliary Feedwater Pumps. Commitment to Developing Procedures & Training for Recognizing Gas Binding Conditions & Restoring Operable Status of Safety Sys Still Valid ML20153G5781988-04-0505 April 1988 Advises That 880226 Changes & Corrections to Amend 7 of FSAR Section 17.3 Consistent W/Provisions of 10CFR50,App B & Acceptable ML20150D1301988-03-18018 March 1988 Forwards Responses to NRC 830503 & 11 Requests for Addl Info Re Application for Ol.W/Eight Oversize Drawings ML20148B5101988-03-15015 March 1988 Informs of Relocation of NRR to Stated Address in Rockville,Md ML20148G1241988-03-11011 March 1988 Forwards Insp Rept 50-508/88-01 on 880222-26.No Violations Noted ML20147J0341988-03-0707 March 1988 Responds to Sorensen Providing Proposed Schedule for Completion of Review of Geosciences Issues.Proposed Schedule Acceptable.Eforts Will Be Made to Accommodate Geosciences Issues for Facility ML20147H2741988-03-0404 March 1988 Informs That Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Delayed Until After Restart of Const ML20147D3841988-02-29029 February 1988 Forwards Seismic Hazards Assessment, Final Rept Per NRC 830503 Request for Addl Info Re Question 230.6 ML20147E1181988-02-26026 February 1988 Forwards Changes to FSAR Section 17.3, QA During Long-Term Preservation. Revised Section 17.3 Incorporated Into FSAR Amend 7 ML20149L9961988-02-23023 February 1988 Ack Receipt of 880205 Request for Info & Documents Re Certain Costs Billed to Util for June 1984 - Dec 1986 Review Period.Response Forthcoming 1999-05-05
[Table view] Category:NRC TO UTILITY
MONTHYEARML20059M0901990-09-27027 September 1990 Informs That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days ML20247L3141989-05-11011 May 1989 Forwards Insp Rept 50-508/89-01 on 890413-14 & 0508.No Violations Noted ML20153E2801988-08-26026 August 1988 Forwards Corrected Page 1 of NRC Forwarding Insp Rept 50-508/88-02 Re Readiness Review Module C3-02 Concrete. Ltr Issued W/O Date Annotated on First Page ML20153G4231988-08-22022 August 1988 Forwards Readiness Review Module C3-02 Concrete Insp Rept 50-508/88-02.Concrete Const Completed at Time of Work Stoppage Deemed Acceptable Assuming Open Items Resolved. Listed Items Will Be Pursued During Future Reviews & Insps ML20154D2661988-05-16016 May 1988 Forwards Order Extending Const Completion Date to 990701 for Plant,Per Util 841102 & 860310 Requests.Safety Evaluation & Environ Assessment & Finding of No Significant Impact Also Encl ML20153G5781988-04-0505 April 1988 Advises That 880226 Changes & Corrections to Amend 7 of FSAR Section 17.3 Consistent W/Provisions of 10CFR50,App B & Acceptable ML20148G1241988-03-11011 March 1988 Forwards Insp Rept 50-508/88-01 on 880222-26.No Violations Noted ML20147J0341988-03-0707 March 1988 Responds to Sorensen Providing Proposed Schedule for Completion of Review of Geosciences Issues.Proposed Schedule Acceptable.Eforts Will Be Made to Accommodate Geosciences Issues for Facility ML20149L9961988-02-23023 February 1988 Ack Receipt of 880205 Request for Info & Documents Re Certain Costs Billed to Util for June 1984 - Dec 1986 Review Period.Response Forthcoming ML20236S9211987-11-20020 November 1987 Advises That QA Program Description for Preservation Stage, Submitted in Section 17.3 to Fsar,Satisfies Requirements of 10CFR50,App B & Acceptable ML20236Q4311987-11-13013 November 1987 Forwards 28 Pages of Fee Data for Costs Billed on Invoices F1475 & F1476 for Plant for 6-month Review Period Ending on 861220,per 871028 Request.W/O Encl ML20236B3331987-10-22022 October 1987 Informs of Refund Due for Review of Applications for OLs Through 840623,in Response to Util .Revised Sheets Showing Revised OL Review Cost from CP Issuance Through 840623 & Response to Issues Raised in Encl ML20238D2001987-09-0909 September 1987 Forwards Breakdown of Cost Analysis for OL Application Reviews from 860622-1220,per 10CFR170.12(b).Invoices Will Be Sent Shortly ML20238E8191987-08-26026 August 1987 Forwards Insp Rept 50-508/87-04 on 870609-19.No Violations Noted ML20237H4671987-08-20020 August 1987 Ack Receipt of Expressing Concern That Re Invoiced Amounts for License Review Through 840623 Not Responded to by Nrc.Final Response Will Be Provided by 871030 ML20237G3731987-08-11011 August 1987 Forwards 52 Pages of Fee Data in Support of Costs for Invoice F1138 for Unit 1 & Invoice F1139 for Unit 3,per .Types of Activities Reported Against Code Bf Changed as of Billing Cycle Beginning 851222.W/o Encl ML20236D5451987-07-24024 July 1987 Ack Receipt of 870331 & 0615 Ltrs Informing NRC of Steps Taken to Correct Violations Noted During Insp of Plant. Response Re Reinforcing Steel Clearance Specs Adequately Demonstrates Compliance W/Applicable NRC Regulation ML20235E3671987-06-23023 June 1987 Forwards Meeting Rept 50-508/87-05 on 870529 Re Readiness Review Program.Meeting Consisted of Util Overview of Format & Content of Final Rept for Module C3-02, Concrete. Understanding That Rept to Be Mailed on 870601 Confirmed ML20215D8621987-06-15015 June 1987 Forwards Cost Analyses for OL Application Reviews for 850623-860621 ML20215C2891987-06-11011 June 1987 Forwards Safety Evaluation Supporting Use of Modified Itt/ Grinnell Figure 215 Type Stiff Clamps in safety-related Piping Sys at Facility.Ser Can Be Consolidated w/851119 Draft SER ML20214X3011987-06-0303 June 1987 Ack Receipt of Denying Violations Noted in NRC Based on FSAR Commitments.Violation Re Grout Reduced to Open Item Based on Addl Info Provided.Amended Reply Re Violation on Reinforced Steel Expected by 870601 ML20215G1261987-06-0202 June 1987 Forwards Insp Rept 50-508/87-03 on 870512-15.No Violations Identified ML20206J9561987-04-0909 April 1987 Advises That 870306 Revs to Preservation of Assets & Preventive Maint Program, Reviewed by NRC as Part of Readiness Review Program.Commitments Acceptable ML20206B6251987-04-0808 April 1987 Forwards from Energy Facility Site Evaluation Council of State of Wa Advising That C Eschels Replaced Nd Lewis as Council Chairman.Distribution Lists for Future Amends to FSAR & Environ Repts Should Be Revised ML20206B5441987-04-0707 April 1987 Requests Addl Info Re Facility Soil Structure interaction- Deconvolution Issue within 90 Days of Ltr Receipt,Per Encl List ML20212N1071987-02-26026 February 1987 Forwards Insp Rept 50-508/86-13 on 861208-19,870108 & 12-13 & Notice of Violation.Insp Findings Noted as-built Conditions Which Did Not Conform to Revised Design Drawings. Method of Implementing Readiness Review Program Requested IR 05000508/19870021987-02-24024 February 1987 Forwards Insp Rept 50-508/87-02 on 870202-05.No Violations Identified ML20211G4031987-02-14014 February 1987 Forwards Safety Evaluation & EGG-NTA-7463, Reactor Trip Sys Reliability..., Supporting Response to Generic Ltr 83-28,Item 4.5.2 Re Periodic on-line Testing of Reactor Trip Sys.Plant Designed to Permit on-line Testing ML20210D8421987-02-0606 February 1987 Ack Receipt of 870123 Request for Response to Re Possible Errors in Invoices D0119 & D0120 for OL Reviews Through 840623.Response Should Be Forwarded by 870430,per Holloway ML20211H7681987-02-0606 February 1987 Forwards Meeting Rept 50-508/87-01 on 870107.Meeting Clarified Expected Results of Readiness Review Program ML20211H2901987-02-0606 February 1987 Forwards Insp Rept 50-508/86-12 on 860915-1215.No Violations Noted.Review of Readiness Review Module C3-01, Earthwork Indicates Const Completed at Time of Work Stoppage Acceptable Assuming Resolution of Open Items ML20209F5401987-01-28028 January 1987 Responds to Re Plan for Addressing Geological & Seismological Questions Raised by NRC Review of Fsar.Ser Date of Geoscience Issues Should Be Projected for Sept 1988.Meeting on Series 231 Questions Should Be Held in Mar ML20212M3731987-01-16016 January 1987 Informs That Due to Extensive Staff Demands,Response to Re OL Review Costs Through 840623 Will Be Delayed Until 870430 ML20212A9021986-12-18018 December 1986 Advises That Rs Lee Assigned as NRR Licensing Project Manager for Facility Effective 861215 ML20215C3581986-11-26026 November 1986 Forwards Insp Rept 50-508/86-11 on 861027-31.No Violations Noted ML20214T7901986-11-19019 November 1986 Forwards Safety Evaluation & EGG-NTA-7319 Re Util Response to Generic Ltr 83-28,Item 2.1 on Equipment Classification of Reactor Trip Sys Components.Response Acceptable ML20211C6981986-10-0202 October 1986 Forwards Insp Rept 50-508/86-10 on 860915-19.No Violations Noted ML20206P3051986-08-11011 August 1986 Forwards Meeting Rept 50-508/86-09 on 860801 at Region V Ofcs Re Readiness Review Program ML20206N4561986-08-0707 August 1986 Forwards Insp Rept 50-508/86-08 on 860715-18.No Violation Noted IR 05000508/19860071986-07-15015 July 1986 Forwards Insp Rept 50-508/86-07 on 851009 & 0324-27.No Violations Noted.Acceptability of Design Insp Plan Re Engineering Assurance Program Module 1 (Piping/Pipe Supports) Reviewed ML20206M2211986-06-25025 June 1986 Forwards Safety Insp Rept 50-354/86-29 on 860527-30.No Violation Noted ML20206E2991986-06-16016 June 1986 Advises That Gf Dick Assigned as Licensing Project Manager for Facility,Effective Immediately ML20211H0441986-06-0505 June 1986 Forwards Insp Rept 50-508/86-06 on 860519-23.No Violations Noted ML20203N0741986-04-30030 April 1986 Forwards Supporting Fee Documentation for 860312 Invoice E0495 for OL Review Period from 841223-850622,per 860411 Request.Charge for ACRS Review of Unit 2 Will Be Credited to Billing Cycle Ending on 851221.W/o Encls ML20203L3841986-04-14014 April 1986 Forwards Insp Rept 50-508/86-04 on 860324-28.No Violation Noted ML20141D3381986-04-0101 April 1986 Responds to 860303 Request for Clarification of Further Deferral of Forecasted Operation of Plant.Addl Delay Will Not Adversely Effect Plant Licensability ML20141E2471986-03-31031 March 1986 Forwards Insp Rept 50-508/86-03 on 860317-18.No Violations Noted ML20141N9671986-03-11011 March 1986 Informs That Encl Cost Analysis for OL Application Review for 841223-850622 Completed,Per Requirements of 10CFR170.12(b).Ofc of Resource Mgt Will Bill Util for Listed Amount.W/O Encl ML20141N9261986-03-0404 March 1986 Forwards Insp Rept 50-508/86-02 on 860210-14.No Violations Noted ML20154B6541986-02-25025 February 1986 Forwards Insp Rept 50-508/86-01 on 851029 & 1118-21.Const Assurance Program (CAP) & Commitment to Conduct CAP as Part of Readiness Review Program Acceptable.Tentative Module Rept Format & Content Description Subj to Further Insp & Review 1990-09-27
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20202C7671999-01-22022 January 1999 Forwards Order Terminating Construction Permit CPPR-154 for WNP-3/5 Site.Safety Evaluation Associated with Action Also Encl ML20198Q7131999-01-0404 January 1999 Forwards EA & Fonsi Re 960808 Application.Assessment Being Forwarded to Ofc of Fr for Publication ML20155G7791998-11-0202 November 1998 Forwards Insp Rept 50-508/98-201 on 981027-28.No Violations Noted.Insp Included Review of Activities to Terminate Construction Permit CPPR-154 ML20059M0901990-09-27027 September 1990 Informs That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days ML20059M0921990-09-27027 September 1990 Advises That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days ML20247L3141989-05-11011 May 1989 Forwards Insp Rept 50-508/89-01 on 890413-14 & 0508.No Violations Noted ML20153E2801988-08-26026 August 1988 Forwards Corrected Page 1 of NRC Forwarding Insp Rept 50-508/88-02 Re Readiness Review Module C3-02 Concrete. Ltr Issued W/O Date Annotated on First Page ML20153G4231988-08-22022 August 1988 Forwards Readiness Review Module C3-02 Concrete Insp Rept 50-508/88-02.Concrete Const Completed at Time of Work Stoppage Deemed Acceptable Assuming Open Items Resolved. Listed Items Will Be Pursued During Future Reviews & Insps ML20154D2661988-05-16016 May 1988 Forwards Order Extending Const Completion Date to 990701 for Plant,Per Util 841102 & 860310 Requests.Safety Evaluation & Environ Assessment & Finding of No Significant Impact Also Encl ML20153G5781988-04-0505 April 1988 Advises That 880226 Changes & Corrections to Amend 7 of FSAR Section 17.3 Consistent W/Provisions of 10CFR50,App B & Acceptable ML20148B5101988-03-15015 March 1988 Informs of Relocation of NRR to Stated Address in Rockville,Md ML20148G1241988-03-11011 March 1988 Forwards Insp Rept 50-508/88-01 on 880222-26.No Violations Noted ML20147J0341988-03-0707 March 1988 Responds to Sorensen Providing Proposed Schedule for Completion of Review of Geosciences Issues.Proposed Schedule Acceptable.Eforts Will Be Made to Accommodate Geosciences Issues for Facility ML20149L9961988-02-23023 February 1988 Ack Receipt of 880205 Request for Info & Documents Re Certain Costs Billed to Util for June 1984 - Dec 1986 Review Period.Response Forthcoming ML20236S9211987-11-20020 November 1987 Advises That QA Program Description for Preservation Stage, Submitted in Section 17.3 to Fsar,Satisfies Requirements of 10CFR50,App B & Acceptable ML20236Q4311987-11-13013 November 1987 Forwards 28 Pages of Fee Data for Costs Billed on Invoices F1475 & F1476 for Plant for 6-month Review Period Ending on 861220,per 871028 Request.W/O Encl ML20236B3331987-10-22022 October 1987 Informs of Refund Due for Review of Applications for OLs Through 840623,in Response to Util .Revised Sheets Showing Revised OL Review Cost from CP Issuance Through 840623 & Response to Issues Raised in Encl ML20238D2001987-09-0909 September 1987 Forwards Breakdown of Cost Analysis for OL Application Reviews from 860622-1220,per 10CFR170.12(b).Invoices Will Be Sent Shortly ML20238E8191987-08-26026 August 1987 Forwards Insp Rept 50-508/87-04 on 870609-19.No Violations Noted ML20237H4671987-08-20020 August 1987 Ack Receipt of Expressing Concern That Re Invoiced Amounts for License Review Through 840623 Not Responded to by Nrc.Final Response Will Be Provided by 871030 ML20237G3731987-08-11011 August 1987 Forwards 52 Pages of Fee Data in Support of Costs for Invoice F1138 for Unit 1 & Invoice F1139 for Unit 3,per .Types of Activities Reported Against Code Bf Changed as of Billing Cycle Beginning 851222.W/o Encl ML20236D5451987-07-24024 July 1987 Ack Receipt of 870331 & 0615 Ltrs Informing NRC of Steps Taken to Correct Violations Noted During Insp of Plant. Response Re Reinforcing Steel Clearance Specs Adequately Demonstrates Compliance W/Applicable NRC Regulation ML20235E3671987-06-23023 June 1987 Forwards Meeting Rept 50-508/87-05 on 870529 Re Readiness Review Program.Meeting Consisted of Util Overview of Format & Content of Final Rept for Module C3-02, Concrete. Understanding That Rept to Be Mailed on 870601 Confirmed ML20215D8621987-06-15015 June 1987 Forwards Cost Analyses for OL Application Reviews for 850623-860621 ML20215C2891987-06-11011 June 1987 Forwards Safety Evaluation Supporting Use of Modified Itt/ Grinnell Figure 215 Type Stiff Clamps in safety-related Piping Sys at Facility.Ser Can Be Consolidated w/851119 Draft SER ML20214X3011987-06-0303 June 1987 Ack Receipt of Denying Violations Noted in NRC Based on FSAR Commitments.Violation Re Grout Reduced to Open Item Based on Addl Info Provided.Amended Reply Re Violation on Reinforced Steel Expected by 870601 ML20215G1261987-06-0202 June 1987 Forwards Insp Rept 50-508/87-03 on 870512-15.No Violations Identified ML20206G6951987-04-10010 April 1987 Final Response to FOIA Request for Documents Re WPPSS Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) IA-84-643, Final Response to FOIA Request for Documents Re Wppss Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7)1987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Wppss Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) ML20206G7351987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Securities Litigation of WPPSS Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) IA-84-603, Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7)1987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) ML20206G9261987-04-10010 April 1987 Final Response to FOIA Request for Records Re Various Plant Aspects.Documents Subj to Request Either Available in PDR or Withheld (Ref FOIA Exemptions 3,4,5 & 7) ML20206H6021987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Securities Litigation of WPPSS Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) IA-84-617, Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7)1987-04-10010 April 1987 Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) IA-84-645, Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7)1987-04-10010 April 1987 Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) ML20206F7291987-04-10010 April 1987 Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) ML20206J9561987-04-0909 April 1987 Advises That 870306 Revs to Preservation of Assets & Preventive Maint Program, Reviewed by NRC as Part of Readiness Review Program.Commitments Acceptable ML20206B6251987-04-0808 April 1987 Forwards from Energy Facility Site Evaluation Council of State of Wa Advising That C Eschels Replaced Nd Lewis as Council Chairman.Distribution Lists for Future Amends to FSAR & Environ Repts Should Be Revised ML20206B5441987-04-0707 April 1987 Requests Addl Info Re Facility Soil Structure interaction- Deconvolution Issue within 90 Days of Ltr Receipt,Per Encl List ML20212N1071987-02-26026 February 1987 Forwards Insp Rept 50-508/86-13 on 861208-19,870108 & 12-13 & Notice of Violation.Insp Findings Noted as-built Conditions Which Did Not Conform to Revised Design Drawings. Method of Implementing Readiness Review Program Requested IR 05000508/19870021987-02-24024 February 1987 Forwards Insp Rept 50-508/87-02 on 870202-05.No Violations Identified ML20211G4031987-02-14014 February 1987 Forwards Safety Evaluation & EGG-NTA-7463, Reactor Trip Sys Reliability..., Supporting Response to Generic Ltr 83-28,Item 4.5.2 Re Periodic on-line Testing of Reactor Trip Sys.Plant Designed to Permit on-line Testing ML20211H7681987-02-0606 February 1987 Forwards Meeting Rept 50-508/87-01 on 870107.Meeting Clarified Expected Results of Readiness Review Program ML20210D8421987-02-0606 February 1987 Ack Receipt of 870123 Request for Response to Re Possible Errors in Invoices D0119 & D0120 for OL Reviews Through 840623.Response Should Be Forwarded by 870430,per Holloway ML20211H2901987-02-0606 February 1987 Forwards Insp Rept 50-508/86-12 on 860915-1215.No Violations Noted.Review of Readiness Review Module C3-01, Earthwork Indicates Const Completed at Time of Work Stoppage Acceptable Assuming Resolution of Open Items ML20209F5401987-01-28028 January 1987 Responds to Re Plan for Addressing Geological & Seismological Questions Raised by NRC Review of Fsar.Ser Date of Geoscience Issues Should Be Projected for Sept 1988.Meeting on Series 231 Questions Should Be Held in Mar ML20212M3731987-01-16016 January 1987 Informs That Due to Extensive Staff Demands,Response to Re OL Review Costs Through 840623 Will Be Delayed Until 870430 ML20212A9021986-12-18018 December 1986 Advises That Rs Lee Assigned as NRR Licensing Project Manager for Facility Effective 861215 ML20215C3581986-11-26026 November 1986 Forwards Insp Rept 50-508/86-11 on 861027-31.No Violations Noted ML20214T7901986-11-19019 November 1986 Forwards Safety Evaluation & EGG-NTA-7319 Re Util Response to Generic Ltr 83-28,Item 2.1 on Equipment Classification of Reactor Trip Sys Components.Response Acceptable 1999-01-04
[Table view] |
Text
,
JUN 151987 Docket Nos. 50 460/508 Washington Public Power Supply System ATTN: Mr. G. C. Sorensen, Manager Regulatory Programs P.O. Box 968 1
3000 George Washington Way
]
Richland, WA 99352 J
Gentlemen:
Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analyses for the WNP-1 and WNP-3 operating license application reviews for the period June 23, 1985 through June 21, 19_86.
The costs through that period are $90,380 for WNP-1 and $135,950 for WNP-3. The enclosures give a breakdown of the review costs by program offices. Within the next few days, you will be sent invoices for these amounts. When making payment, please make reference to the invoice numbers.
Sincerely, t?p @ c. c:xa ern s a a C. James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of Administration and Resources Management
Enclosures:
Operating License Review Costs (4)
DISTRIBUTION w/encls:
PDR LFMB Reactor File LPDR DFioravante, PMSB LFMB A/M File MKaltman, PRAB RMDiggs RVillafranco, PMSB CJHolloway DWeiss Reg?DocketIFile ARM /DAF R/F DW/LT/WPPSS LFMB R/F (3) 0FFICE : ARM /LFMB A
FMB
- ARM /LFMB/
......... :...._..,.f[j p : Rkd ggs
.f
- .._ %.. J....:............;............:............:
3 SURNAME :LTremper:
- CJfig7)bway :
.........:............:...____.....:. 7.(/87 DATE :6/ /A_/__87
- 6//6/87
- 6/ l )
8706190168 870615 PDR ADOCK 05000460 A
PDR-
l a
l N
/
A Washington Public Power Supply System' Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY:~ WNP-l'
]
DOCKET NO.: 50-460
\\
I c
lj Costs Per Profess'ional Program Office Professional Staff-Hours Staff-Hour Contractual Total Review Staff-Hour Expended '
Costs Costs Costs
- 1., ' NRR
$62 31
$1,922
$62,653
$64,575 2.
IE-HQ 53 4,240 3.
REGIONS 53 80 4,240 4
ACRS 62 5.
NMSS 58 TOTAL COST:
$68,815 i
s i
l I
i Y
l
a 1
1 1
Washington Public Power Supply System Operating License Review Costs'From 12/22/85 Through 6/21/86 FACILITY:
WNP-1 DOCKET N0.: 50-460 l
I Costs Per Professional Program Office Professional
' Staff-Hours Staff-Hour' Contractual Total Costs Costs-Costs' l
Review Staff-Hour Expended 1.
HRR
$62 283
$17,546
$1,872'
$19,418 j
371 2.
IE-HQ 53 7
371 t
1,776 3.
REGIONS 53 33.5 1,776 4.
ACRS 62 5.
NMSS 58 1
TOTAL COST:
$21,565 i
1 1
4 l
r a
Washington Public Power Supply System Operating License Review Costs From 6/23/85 Through 12/21/85 FACILITY: WNP-3 DOCKET NO.:
50-508 Costs Per Professional Program Office Professional Staff-Hours Staff-Hour Contractual Total
__ Costs Costs Costs Review Staff-Hour Expended 1.
NRR
$62 493
$30,566
$1,386
$31,952
]
2.
- 7. E-HQ 53 272 14,416 206 14,622 l
j 3.
REGIONS 53 653 34,609 34,609 i
i 4.
ACRS 62 1
5.
NMSS 58
$81,183 Less Credit
- 174*
TOTAL COST:
$81,009 oCredit given for 2.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (ACRS) billed on Invoice No. E0495 dated 3/12/86 (reference NRC letter dated 4/30/86, Diggs to Sorensen).
1 Washiagton Public Power Supply System
.0perating License Review Costs From 6/23/85 Through 12/21/85 l
FACILITY:
WNP-3
{
'J
. DOCKET N0.i 50-508 1
l Costs Per Professional-Program Office Professional Staff-Hours-Staff-Hour Contractual
. Total Costs Costs Costs Review Staff-Hour-Expended 1.
NRR
$62 108
$6,696-
.$1,923
$8,619 2.
IE-HQ 53 237 12,561 12,561'
~33,761-3.
REGIONS 53 637 33,761 4.
ACRS 62 5.
NMSS 58 TOTAL COST:
$54,941