{{#Wiki_filter:w* -. Cv ENERGY NORTH WEST PO. Box 968
* Richland, Washington 99352-0968 January 14, 2004 GO2-04-006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001                                                            _______
 
==Subject:==
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT DECEMBER 2003
 
==Dear Sir or Madam:==
 
Transmitted herewith is the Monthly Operating Report for the month of December 2003 as required by Technical Specification 5.6.4.
Respectftilly, WS Oxe flfd Plant eneral Manager Mail Drop 927M Attachment                                                              -
cc:    BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399
 
OPERATING STATUS REPORT for Columbia Generating Station Date: January 1, 2004
: 1.      Docket: 50-397
: 2.      Reporting Period: December 2003
: 3.      Utility
 
==Contact:==
Patricia Campbell (509) 377-4664
: 4.      Design Electrical Rating (Net MWe): 1153
: 5.      Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH                YEAR CUMULATIVE
      --- 6. ---- Hours-Reactor Critical  -                  744.0      ----7,163;0  -126858.5
: 7.      Hours Generator On-Line                    744.0            7,042.1  123,413.6
: 8.      Unit Reserve Shutdown Hours                    0.0              0.0    3,274.7
: 9.      Net Electrical Energy (MWH)              831,164        7,614,873  122,867,652
 
UNIT SHUTDOWNS                                                I DOCKET NO.: 50-397 UNIT NAME:      Columbia Generating Station DATE: January 1, 2004 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664
(
REPORT PERIOD: December, 2003 Typp e          _;                      Method of            Cause / Corrective Actions F: Forced        Duration                  Shutting No.        Date      S: Scheduled      (Hours)    Reason (1)  Dout(2)                      Comments NA    _I    _          _              _          _          _                _
 
==SUMMARY==
:                  Columbia Generating Station entered the month at full reactor power.                              On December 21, 2003 power was reduced to about 60% for scheduled testing and steam leak repairs. Full power operation was resumed early on the morning of December 22, 2003 and sustained through the end of the month.                                =-
(I) REASON                                                      (2) METHOD A - Equipment Failure        E - Operator Training &            1 - Manual B - Maintenance or Test                License Examination      2-  Manual Trip/Scram C - Refueling                  F - Administration                3-  Auto Trip/Scram D - Regulatory Restriction    G - Operational Error            4-  Continuation H - Other                        5-  Other (Explain)}}

Latest revision as of 03:21, 25 March 2020

December 2003 Monthly Operating Report for Columbia Generating Station
ML040290561
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/14/2004
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-04-006
Download: ML040290561 (3)


Text

w* -. Cv ENERGY NORTH WEST PO. Box 968

  • Richland, Washington 99352-0968 January 14, 2004 GO2-04-006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 _______

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT DECEMBER 2003

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of December 2003 as required by Technical Specification 5.6.4.

Respectftilly, WS Oxe flfd Plant eneral Manager Mail Drop 927M Attachment -

cc: BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: January 1, 2004

1. Docket: 50-397
2. Reporting Period: December 2003
3. Utility

Contact:

Patricia Campbell (509) 377-4664

4. Design Electrical Rating (Net MWe): 1153
5. Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH YEAR CUMULATIVE

--- 6. ---- Hours-Reactor Critical - 744.0 ----7,163;0 -126858.5

7. Hours Generator On-Line 744.0 7,042.1 123,413.6
8. Unit Reserve Shutdown Hours 0.0 0.0 3,274.7
9. Net Electrical Energy (MWH) 831,164 7,614,873 122,867,652

UNIT SHUTDOWNS I DOCKET NO.: 50-397 UNIT NAME: Columbia Generating Station DATE: January 1, 2004 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664

(

REPORT PERIOD: December, 2003 Typp e _; Method of Cause / Corrective Actions F: Forced Duration Shutting No. Date S: Scheduled (Hours) Reason (1) Dout(2) Comments NA _I _ _ _ _ _ _

SUMMARY

Columbia Generating Station entered the month at full reactor power. On December 21, 2003 power was reduced to about 60% for scheduled testing and steam leak repairs. Full power operation was resumed early on the morning of December 22, 2003 and sustained through the end of the month. =-

(I) REASON (2) METHOD A - Equipment Failure E - Operator Training & 1 - Manual B - Maintenance or Test License Examination 2- Manual Trip/Scram C - Refueling F - Administration 3- Auto Trip/Scram D - Regulatory Restriction G - Operational Error 4- Continuation H - Other 5- Other (Explain)