November 2002 Monthly Operating Report for Columbia Generating Station, Docket No.50-397
ML023540132
Person / Time
Site: Columbia 
Issue date: 12/11/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02-02-197
Download: ML023540132 (3)


Text

ENERGY NORTHWEST PO. Box 968 0 Richland, Washington 99352-0968 December 11, 2002 G02-02-197 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk

-- Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT NOVEMBER 2002

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of November 2002 as required by Technical Specification 5.6.4.

iRespectfuilly, Plant General Manager Mail Drop 927M Attachment cc:

EW Merschoff - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399 e

OPERATING STATUS REPORT for Columbia Generating Station Date:

December 1, 2002 Docket: 50-397 Reporting Period: November 2002 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity - summer (Net MWe):

MONTH

6.

Hours Reactor Critical 720.0

7.

Hours Generator On-Line 720.0

8.

Unit Reserve Shutdown Hours 0.0

9.

Net Electrical Energy (MWH) 806,991 YEAR 7,800.8 7,784.5 0.0 8,144,122 CUMULATIVE 118,951.5 115,627.5 3,274.7 114,415,607

10.

Challenges to safety/relief valves:

1.
2.
3.
4.

5.

1153 1107 None

DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station DATE: December 1, 2002 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 UNIT SHUTDOWNS a,'

REPORT PERIOD: November, 2002

SUMMARY

The plant began and en'ded the month at power operation.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

Licefise Examination F - Administration G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)

Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.

Date S: Scheduled (Hours)

Reason (1)

Down(2)

Comments

_I N/A