i ENERGY NORTH WEST PO. Box 968

  • Richland, Washington 99352-0968 December 8, 2003 G02-03-182 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT NOVEMBER 2003

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of November 2003 as required by Technical Specification 5.6.4.

Respectfully, WS Oxenfor Plant General manager Mail Drop 927M Attachment cc:

BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: December 1, 2003 1.

2.

3.

4.

5.

Docket: 50-397 Reporting Period: November 2003 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe): 1153 Maximum Dependable Capacity - summer (Net MWe): 1107 6.

7.

8.

9.

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 720.0 720.0 0.0 806,785 YEAR 6,419.0 6,298.1 0.0 6,783,709 CUMULATIVE 126,114.5 122,669.6 3,274.7 122,036,488

UNIT SHUTDOWNS P,

DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station DATE: December 1, 2003 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: November, 2003 Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.

Date S: Scheduled (Hours)

Reason (1)

Don (2)

Comments N

NA

_IIIIIII

SUMMARY

The plant began and ended the month at 100% power.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &