GO2-04-023, January 2004 Monthly Operating Report for Columbia Generating Station

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Columbia Generating Station
ML040490513
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/12/2004
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-04-023
Download: ML040490513 (3)


Text

EXERGY NORTH WEST PO. Box 968

  • Richland, Washington 99352-0968 February 12, 2004 G02-04-023 U.S. Nuclear Regulatory Commission ATTN: Dacue fit Cintiol Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT JANUARY 2004

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of January 2004 as required by Technical Specification 5.6.4.

Respectfully, WS (Hanfrd Plant General Manager

-MailDrop 927M Attachment cc:

BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: February 1, 2004 1.

2.

3.

4.

5.

Docket: 50-397 Reporting Period: January 2004 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe): 1153 Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH

6.

Hours Reactor Critical 744.0

7.

Hours Generator On-Line 744.0

8.

Unit Reserve Shutdown Hours 0.0

9.

Net Electrical Energy (MWH) 798,707 YEAR 744.0 744.0 0.0 798,707 CUMULATIVE 127,602.5 124,157.6 3,274.7 123,666,358

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station I

DATE: February 1, 2004 j

COMPLETED BY: P. Campbell

?I TELEPHONE: (509) 377-4664 I

1. N REPORT PERIOD: January, 2004 Type i

Method of Cause /[Corrective Actions No.

Date F: Forced (Houri)

Reason (o)

Shutting Comments No.

Date 5: Scheduled (HourA)

R Dow (2)

NA

'I.

Columbia Generating Station entered the month at full January 24, 2004 power was reduced to about 60% to co tube pluggingi Full power operation was resumed on J sustained through the end of the month.

I

SUMMARY

.reactor power.

On aduct online condenser anuary 28, 2004 and l

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination P - Administration G - Operational Error H - Other I

(2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)

I I

it I