Text
EXERGY NORTH WEST PO. Box 968
- Richland, Washington 99352-0968 February 12, 2004 G02-04-023 U.S. Nuclear Regulatory Commission ATTN: Dacue fit Cintiol Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT JANUARY 2004
Dear Sir or Madam:
Transmitted herewith is the Monthly Operating Report for the month of January 2004 as required by Technical Specification 5.6.4.
Respectfully, WS (Hanfrd Plant General Manager
-MailDrop 927M Attachment cc:
BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399
OPERATING STATUS REPORT for Columbia Generating Station Date: February 1, 2004 1.
2.
3.
4.
5.
Docket: 50-397 Reporting Period: January 2004 Utility
Contact:
Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe): 1153 Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH
- 6.
Hours Reactor Critical 744.0
- 7.
Hours Generator On-Line 744.0
- 8.
Unit Reserve Shutdown Hours 0.0
- 9.
Net Electrical Energy (MWH) 798,707 YEAR 744.0 744.0 0.0 798,707 CUMULATIVE 127,602.5 124,157.6 3,274.7 123,666,358
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:
Columbia Generating Station I
DATE: February 1, 2004 j
COMPLETED BY: P. Campbell
?I TELEPHONE: (509) 377-4664 I
- 1. N REPORT PERIOD: January, 2004 Type i
Method of Cause /[Corrective Actions No.
Date F: Forced (Houri)
Reason (o)
Shutting Comments No.
Date 5: Scheduled (HourA)
R Dow (2)
NA
'I.
Columbia Generating Station entered the month at full January 24, 2004 power was reduced to about 60% to co tube pluggingi Full power operation was resumed on J sustained through the end of the month.
I
SUMMARY
.reactor power.
On aduct online condenser anuary 28, 2004 and l
(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination P - Administration G - Operational Error H - Other I
(2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)
I I
it I