ENERGY NORTHWEST PO. Box 968 N Richland, Washington 99352-0968 March 11, 2003 G02-03-043 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT FEBRUARY 2003
Dear Sir or Madam:
Transmitted herewith is the Monthly Operating Report for the month of February 2003 as required by Technical Specification 5.6.4.
Respectfully, 1
WS O enford Plant General Manager Mail Drop 927M A ttiaM ent......
cc:
EW Merschoff - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399
OPERATING STATUS REPORT for Columbia Generating Station Date:
March 1, 2003 Docket: 50-397 Reporting Period: February 2003 Utility
Contact:
Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity - summer (Net MWe):
Hours Reactor-Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)
MONTH 652.8 651.8 0.0 718,423 YEAR 1,396.8 1,395.8 0.0 1,549,250 CUMULATIVE 121,092.3 117,767.3 3,274.7 116,802,029
- 10.
Challenges to safety/relief valves:
- 1.
- 2.
- 3.
- 4.
5.
-6.
- 7.
- 8.
9.
1153 1107 None
UNIT SHUTDOWNS U*IT REPORT PERIOD: February, 2003 I
SUMMARY
- The plant began the month at full power and ended in a Forced Outage.
DOCKET NO.: 50-397 NAME:
Columbia Generating Station DATE: March 1, 2003 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 1J (1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
Li~ense Examination F - Adminiftration G - Operatibnal Error H - Other I (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)
Type I
Method of
&ause / Corrective Actions F: Forced Duration Shutting C
No.
Date S: Scheduled
?Hours)
Reason (1)
Down(2)03-001 2/27/03 F
20.3 D
1 Technical Specification required shutdown due to DG inoperability.