November 2004 Monthly Operating Report for Columbia Generating Station
ML043520254
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/08/2004
From: Lynch T
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02-04-206
Download: ML043520254 (3)


Text

ENERGY NORTHWEST People Vision* Solutions P.O. Box 968 e Richland, WA

  • 99352-0968 December 8, 2004 G02-04-206 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT NOVEMBER 2004

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of November 2004 as required by Technical Specification 5.6.4.

Respectfully, TA Lynch Duty Plant General Manager Mail Drop 9270

-Affachmentt cc:

BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA /1399 e0

OPERATING STATUS REPORT for Columbia Generating Station Date: December 1, 2004 1.

2.

3.

4.

5.

Docket: 50-397 Reporting Period: November 2004 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe): 1153 Maximum Dependable Capacity - summer (Net MWc):

1107 6.

7.

8.

9.

MONTH Hours Reactor Critical 720.0 Hours Generator On-Line 720.0 Unit Reserve Shutdown Hours 0.0 Net Electrical Energy (MWH) 796,763 YEAR 7,565.1 7,478.8 0.0 8,153,092 CUMULATIVE i34,423.6 130,892.4 3,274.7 131,020,744

I I

II I

II

  • 1 I

UNIT SHUTDOWNS L

DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station I

DATE: December 1, 2004 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: November, 2004 Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A

SUMMARY

Columbia Generating Station entered the month of November at full power.

On the 20 th, the reactor was reduced in power to as low as 67% for bypass valve tests, control rod exercises and turbine valve tests, returning to full power early the next morning.

On the 28th powerlwas reduced to about 73% for a control rod sequence exchange, returning to full power operation that evening.

The Station ended the month of November at full power.

{

f (1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operation'al Error H - Other I

(2) METHOD I - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)

II