GO2-02-186, October 2002 Monthly Operating Report for Columbia

From kanterella
Jump to navigation Jump to search
October 2002 Monthly Operating Report for Columbia
ML023260278
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/14/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-02-186
Download: ML023260278 (3)


Text

ENERGY NORTHWEST PO. Box 968 z Richland, Washington 99352-0968 November 14, 2002 G02-02-186 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT OCTOBER 2002

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of October 2002 as required by Technical Specification 5.6.4.

Respectfully, WS Oxenfo Plant Gener al nna ger Mail Drop 927M cc:

EW Merschoff - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO

,.ANI Library Utility Data Institute DL Williams-BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date:

November 1, 2002 Docket: 50-397 Reporting Period: October 2002 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity - summer (Net MWý):

- Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH

.- 745.0 745.0 0.0 830,425 YEAR

-7,080.8 7,064.5 0.0 7,337,131 CUMULATIVE l118;231.5 114,907.5 3,274.7 113,608,616

10.

Challenges to safety/relief valves:

1.
2.
3.
4.

5.

6.
7.
8.

9.

1153 1107

/

None

UNIT SHUTDOWNS REPORT PERIOD: October, 2002 I

I DOCKET NO.: 50-397 UNIT NAME: Columbia Generating Station DATE: November 1, 2002 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 I

SUMMARY

The plant began and ended the month at power operation.

I (1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H -Other,

(2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)

Type Mehdo F: redn Method of Cause / Corrective Actions F: Forced Duration Shuttingom et No.

Date S: Scheduled (Hours)

Reason (1)

Down(2)

Comments N/A

________________________________ I

____________________________