GO2-04-006, December 2003 Monthly Operating Report for Columbia Generating Station

From kanterella
Jump to navigation Jump to search
December 2003 Monthly Operating Report for Columbia Generating Station
ML040290561
Person / Time
Site: Columbia 
Issue date: 01/14/2004
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-04-006
Download: ML040290561 (3)


Text

w * -. Cv ENERGY NORTH WEST PO. Box 968

  • Richland, Washington 99352-0968 January 14, 2004 GO2-04-006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT DECEMBER 2003

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of December 2003 as required by Technical Specification 5.6.4.

Respectftilly, WS Oxe f lfd Plant eneral Manager Mail Drop 927M Attachment cc:

BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: January 1, 2004 1.

2.

3.

4.

5.

Docket: 50-397 Reporting Period: December 2003 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe): 1153 Maximum Dependable Capacity - summer (Net MWe): 1107 6.

7.

8.

9.

MONTH


Hours-Reactor Critical 744.0 Hours Generator On-Line 744.0 Unit Reserve Shutdown Hours 0.0 Net Electrical Energy (MWH) 831,164 YEAR CUMULATIVE


7,163;0

-126858.5 7,042.1 123,413.6 0.0 3,274.7 7,614,873 122,867,652

I UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station DATE: January 1, 2004 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664

(

REPORT PERIOD: December, 2003 Typp e

Method of Cause / Corrective Actions F: Forced Duration Shutting No.

Date S: Scheduled (Hours)

Reason (1)

Dout(2)

Comments NA

_I

SUMMARY

Columbia Generating Station entered the month at full reactor power.

On December 21, 2003 power was reduced to about 60% for scheduled testing and steam leak repairs.

Full power operation was resumed early on the morning of December 22, 2003 and sustained through the end of the month.

=-

(I) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)