GO2-02-026, January 2002 Monthly Operating Report for Columbia Generating Station

From kanterella
Jump to navigation Jump to search
January 2002 Monthly Operating Report for Columbia Generating Station
ML020600193
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/12/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-02-026
Download: ML020600193 (3)


Text

ENERGY NORTH WEST PO. Box 968

  • Richland, Washington 99352-0968 February 12, 2002 G02-02-026 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

COLUMBIA GENERATING STATION OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JANUARY 2002 Transmitted herewith is the Monthly Operating Report for the month of January 2002 as required by Technical Specification 5.6.4.

Respectfully, W.S. Oxenf1rd-ail Drop 927M)

Plant General Manager Attachment cc: E.W. Merschoff- NRC RIV J.S. Cushing - NRR NRC Sr. Resident Inspector - 988C T.C. Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute D.L. Williams - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: February 1, 2002

1. Docket: 50-397
2. Reporting Period: January 2002
3. Utility

Contact:

Patricia Campbell (509) 377-4664

4. Design Electrical Rating (Net MWe): 1153
5. Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 744.0 744.0 111,894.7
7. Hours Generator On-Line 744.0 744.0 108,587.0
8. Unit Reserve Shutdown Hours 0.0 0.0 3,274.7
9. Net Electrical Energy (MWH) 842,886 842,886 107,114,371
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Columbia Generating Station DATE: February 1, 2002 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: January, 2002 Type Method of Cause / Corrective Actions F: Forced Duration Shutting No. Date S: Scheduled (Hours) Reason (1) Down(2) Comments N/A

SUMMARY

The plant began and ended the month at full power operation.

(1) REASON (2) METHOD A - Equipment Failure E - Operator Training & 1 - Manual B - Maintenance or Test License Examination 2 - Manual Trip/Scram C - Refueling F - Administration 3 - Auto Trip/Scram D - Regulatory Restriction G - Operational Error 4 - Continuation H - Other 5 - Other (Explain)