GO2-02-133, July 2002 Monthly Operating Report for Columbia Generating Station

From kanterella
Jump to navigation Jump to search
July 2002 Monthly Operating Report for Columbia Generating Station
ML022340384
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/13/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-02-133
Download: ML022340384 (3)


Text

ENERGY NORTHWEST P.O. Box 968 u Richland, Washington 99352-0968 August 13, 2002 G02-02-133 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk-Washington, D. C. 20555 Gentlemen:

Subject:

COLUMBIA GENERATING STATION OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JULY 2002 Transmitted herewith is the Monthly Operating Report for the month of July 2002 as required by Technical Specification 5.6.4.

Respectfully, W.S. Ox ford ail Drop 927M)

Plant; JGne anager Attachment cc: E.W. Merschoff - NRC RIV J.B. Hickman - NRR B.J. Benney - NRR NRC Sr. Resident Inspector - 988C T.C. Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute D.L. Williams - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: August 1, 2002

1. Docket: 50-397
2. Reporting Period: July 2002
3. Utility

Contact:

Patricia Campbell (509) 377-4664

4. Design Electrical Rating (Net MWe): 1153
5. Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 744.0 4,871.8 116,022.5
7. Hours Generator On-Line 744.0 4,855.5 112,698.5
8. Unit Reserve Shutdown Hours 0.0 0.0 3,274.7
9. Net Electrical Energy (MWH) 694,707 4,936,280 111,207,765
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Columbia Generating Station DATE: August 1, 2002 i COMPLETED BY: P. Campbell "TELEPHONE: (509) 377-4664

SUMMARY

The plant began and ended themonth at power operation.

I (1) REASON i (2) METHOD 1 - Manual A - Equipment Failure E - Operator Training &

B - Maintenance or Test Licehse Examination 2 - Manual Trip/Scram C - Refueling F - Administiation 3 - Auto Trip/Scram D - Regulatory Restriction G - Operational Error H - Other 4 - Continuation 5 - Other (Explain) I