GO2-02-133, July 2002 Monthly Operating Report for Columbia Generating Station

From kanterella
Jump to navigation Jump to search
July 2002 Monthly Operating Report for Columbia Generating Station
ML022340384
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/13/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-02-133
Download: ML022340384 (3)


Text

ENERGY NORTHWEST P.O. Box 968 u Richland, Washington 99352-0968 August 13, 2002 G02-02-133 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk-Washington, D. C. 20555 Gentlemen:

Subject:

COLUMBIA GENERATING STATION OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JULY 2002 Transmitted herewith is the Monthly Operating Report for the month of July 2002 as required by Technical Specification 5.6.4.

Respectfully, W.S. Ox ford ail Drop 927M)

Plant; JGne anager Attachment cc:

E.W. Merschoff - NRC RIV J.B. Hickman - NRR B.J. Benney - NRR NRC Sr. Resident Inspector - 988C T.C. Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute D.L. Williams - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: August 1, 2002 Docket: 50-397 Reporting Period: July 2002 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity - summer (Net MWe):

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 744.0 744.0 0.0 694,707 YEAR CUMULATIVE 4,871.8 116,022.5 4,855.5 112,698.5 0.0 3,274.7 4,936,280 111,207,765

10.

Challenges to safety/relief valves:

1.
2.
3.
4.

5.

6.
7.
8.

9.

1153 1107 None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station DATE: August 1, 2002 COMPLETED BY: P. Campbell "TELEPHONE: (509) 377-4664

SUMMARY

The plant (1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction began and ended themonth at power operation.

I i

E - Operator Training &

Licehse Examination F - Administiation G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain)

I i