ENERGY NORTHWEST PO. Box 968 z Richiand, Washington 99352-0968 May 12, 2004 G02-04-092 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT APRIL 2004
Dear Sir or Madam:
Transmitted herewith is the Monthly Operating Report for the month of April 2004 as required by Technical Specification 5.6.4.
Respectfully,.
Ws,.
Plant neral Manager Mail Drop 927M Attachments cc:
BS Mallett - NRC RIV WA Macon - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute RN Sherman - BPA / 1399
OPERATING STATUS REPORT for Columbia Generating Station Date: May 1, 2004 1.
2.
3.
4.
5.
Docket: 50-397 Reporting Period: April 2004 Utility
Contact:
Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe): 1153 Maximum Dependable Capacity - summer (Net MWc):
1107 7.
8.
9.
_ -Hours ReaotQ-Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)
MONTH 719.0 -
719.0 0.0 798,993 YEAR
_2,903.0 2,903.0 0.0 3,208,542 CUMULATIVE 129,76L5.-
126,316.6 3,274.7 126,076,194
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:
Columbia Generating Station DATE: May 1, 2004 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 I
REPORT PERIOD: April, 2004 Type f
Method of Cause / Corrective Actions F: Forced Duration Sutn No.
Date S: Scheduled (Hours)
Reason (1)
(
Comments NA I_
I I_
I SlUMARY:
Columbia Generating Station entered and ended the month at full reactor pbwer. On April 3rd to 4th, power was reduced to about 83% for Control Rod Sequence Exchange. On April 10th to 11th, power was reduced to about 84% for CRD HCU Recovery and Bypass Valve Testing. On April 17th to 18th, power was reduced to aboit 85% for CRD HCU Recovery. On April 24th to 25th power was reduceil to about 82% for CRD HCU Recovery.
I
- x _
- ,,.r* L (1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Admiinistration G - Operational Error H - Other (2) METHOD 1 - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain) l f