December 2004 Monthly Operating Report Columbia Generating Station
ML050190238
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/12/2005
From: Lynch T
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-05-006
Download: ML050190238 (3)


Text

e as ENERGY a NORTHWEST People *Vision *Solutions P.O. Box 968

  • Richland, WA
  • 99352-0968 January 12, 2005 G02-05-006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk

- Washington,-D.C. -20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT DECEMBER 2004

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of December 2004 as required by Technical Specification 5.6.4.

Respectfully; TA Lynch Plant General Manager Mail Drop 927M

-Attachment._-

cc:

BS Mallett - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute

-RN Sherman - BPA/ 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: January 1, 2005 1.

2.

3.

4.

5.

Docket: 50-397 Reporting Period: December 2004 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe): 1153 Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH

-6.-H urs-ReactorCCritical - -

744.0

7.

Hours Generator On-Line 744.0

8.

Unit Reserve Shutdown Hours 0.0

9.

Net Electrical Energy (MWH) 828,490 YEAR

-8'309.2-8,222.8 0.0 8,981,583 CUMULATIVE 135,167;T6 131,636.4 3,274.7 131,849,235

I II Ii UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Gcnerating Station DATE: January 1, 2005 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 I.

REPORT PERIOD: December, 2004 Type Method of Cause I Corrective Actions F: Forced Duration Shutting I

No.

Date S: Scheduled (Hours)

Reason (1)

Don (

Comments IN/A I

I I

__I

SUMMARY

Columbia Generating Station entered the month of DecIember at full power.

On December 12th the plant reduced power to about 80% for a scheduled downpower to do bypass valves testing, control rod stroke time testing, and scram time teesting.

Power was restored to 100% the next day.

The Station ended the month of Delcember at full power.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other I

(2) METHOD 1 - Manual 2-Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain) lI i

II II