GO2-02-163, September 2002 Monthly Operating Report for Columbia

From kanterella
Jump to navigation Jump to search
September 2002 Monthly Operating Report for Columbia
ML022960242
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/09/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-02-163
Download: ML022960242 (3)


Text

ENERGY NORTHWEST PO. Box 968 m Richland, Washington 99352-0968 October 9, 2002 G02-02-163 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 MONTHLY OPERATING REPORT SEPTEMBER 2002

Dear Sir or Madam:

Transmitted herewith is the Monthly Operating Report for the month of September 2002 as required by Technical Specification 5.6.4.

Respectfully, WS Ox nford Plant General Manager Mail Drop 927M

--Att-a-c-iment cc:

EW Merschoff - NRC RIV BJ Benney - NRC NRR NRC Senior Resident Inspector - 988C TC Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: October 1, 2002 Docket: 50-397 Reporting Period: September 2002 Utility

Contact:

Patricia Campbell (509) 377-4664 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity - summer (Net MWe):

Hours Reactor Critical-Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH

-720.0 720.0 0.0 761,289 YEAR 6,335.8 6,319.5 0.0 6,506,706 CUMULATIVE 117,486.5 114,162.5 3,274.7 112,778,191

10.

Challenges to safety/relief valves:

1.
2.
3.
4.

5.

6.
7.
8.

9.

1153 1107 None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME:

Columbia Generating Station DATE: October 1, 2002 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: September, 2002 Type Method of Cause / Corrective Actions F: Forced Duration Shutting No.

Date S: Scheduled (Hours)

Reason (1)

Down(2)

Comments N/A

SUMMARY

The plant began and ended the month at power operation.

(1) REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other (2) METHOD I - Manual 2 - Manual Trip/Scram 3 - Auto Trip/Scram 4 - Continuation 5 - Other (Explain) 11